2km |
12/09/2024 |
N/A |
BELAUT NORTH , PETTIGO , DONEGAL PO |
RETENTION AND COMPLETION OF REAR ANNEX, THE LINKING AND CONVERSION OF THE EXISTING BARN TO ACCOMMODATION, THE INSTALLATION OF PACKAGE TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS AND PERMISSION FOR RENOVATION OF THE EXISTING DERELICT DWELLING... login required. |
Details... |
1.6km |
29/08/2024 |
CONDITIONAL |
KIMMID , PETTIGO , CO. DONEGAL |
CONSTRUCTION OF PORTAL FRAMED CATTLE SHED, SLURRY STORAGE TANK, CONCRETE APRON AND ALL ASSOCIATED SITE WORKS
... login required. |
Details... |
1.6km |
09/07/2024 |
UNCONDITIONAL |
DRUMHARRIFF TD , PETTIGO , DONEGAL PO |
ERECTION OF A DWELLING HOUSE WITH EFFLUENT TREATMENT SYSTEM AND POLISHING FILTER ... login required. |
Details... |
2km |
24/04/2024 |
REFUSED |
BELAULT NORTH , PETTIGO , CO DONEGAL |
(1) RENOVATION OF EXISTING DERELICT DWELLING, (2) RETENTION AND COMPLETION OF REAR ANNEX AND THE LINKING AND CONVERSION OF EXISTING BARN TO ACCOMMODATION AND (3) INSTALLATION OF PACKAGE TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
950m |
24/04/2024 |
REFUSED |
DRUMHARRIFF , PETTIGO , CO DONEGAL |
CONSTRUCTION OF A DWELLING, INSTALLATION OF PACKAGE TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
21/12/2023 |
CONDITIONAL |
PETTIGO , DRUMHARRIFF , DONEGAL PO |
(1) INSTALLATION OF AN INTEGRATED CONSTRUCTED WETLAND (ICW) TYPE WASTEWATER TREATMENT PLANT (WWTP) FOR THE TREATMENT OF WASTEWATER FROM THE PETTIGO AGGLOMERATION COMPRISING OF A SEPTIC TANK AND ICW PONDS, (2) CONSTRUCTION OF (A) NEW ACCESS ROA... login required. |
Details... |
1.9km |
06/11/2023 |
CONDITIONAL |
FINCASHEL , PETTIGO , DONEGAL PO |
CONSTRUCTION OF A FOUR BY TWO BAY SHEEP SHED, STORAGE TANK BELOW, SOAKAWAY AND HANDLING PEN INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2km |
25/09/2023 |
CONDITIONAL |
STATION ROAD , PETTIGO , DONEGAL PO |
EXTENSION OF THE EXISTING CAR PARK AND CIRCULATION ROAD TO PROVIDE OVERNIGHT MOTORHOME PARKING AND HOOKUP POINTS, WHICH WILL INCLUDE ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.9km |
22/06/2023 |
CONDITIONAL |
BELAULT NORTH , PETTIGO , DONEGAL PO |
DEMOLITION OF EXISTING DWELLING HOUSE AND DOMESTIC GARAGE, RECONSTRUCTION OF A DWELLING AND GARAGE, AND RECONNECTION OF ALL SERVICES TO INCLUDE ALL ASSOCIATED SITE WORKS... login required. |
Details... |
470m |
03/08/2022 |
CONDITIONAL |
FINCASHEL , PETTIGO , DONEGAL PO |
(1) INTENSIFICATION OF THE EXISTING COMPOSTING AND WASTE RECOVERY ACTIVITIES FROM AN ANNUAL TONNAGE OF 25,000 TONNES TO 150,000 TONNES, (2) UPGRADING OF THE EXISTING SURFACE WATER DRAINAGE INFRASTRUCTURE, AN UPGRADED ON-SITE WASTEWATER TREATMENT SYSTEM (OSWTS) WITH SOIL... login required. |
Details... |
0m |
21/07/2021 |
N/A |
DRUMGUN , PETTIGO , CO. DONEGAL |
CONSTRUCTION OF A PORTAL FRAMED SHEEP SHED, WITH STORAGE TANK BELOW, CONCRETE APRON TO INCLUDE ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.3km |
30/03/2021 |
CONDITIONAL |
CARNTRESSY , PETTIGO , CO DONEGAL |
CONSTRUCTION OF A FOUR BAY SLATTED SHED WITH TANK BELOW FOR ANIMAL WASTE STORAGE, WITH CONCRETE APRON AND ASSOCIATED SITE WORKS... login required. |
Details... |
1.8km |
16/03/2021 |
CONDITIONAL |
KIMMID , PETTIGO , DONEGAL PO |
CONSTRUCTION OF A SLATTED AGRICULTURAL SHED... login required. |
Details... |
1.2km |
15/03/2021 |
CONDITIONAL |
BILLARY , PETTIGO , CO DONEGAL |
ERECTION OF A FOUR BAY DRY BEDDED SHED WITH DRY FEED AND MACHINERY STORAGE, WITH CONCRETE APRON AND ASSOCIATED SITE WORKS... login required. |
Details... |
2.5km |
25/02/2021 |
CONDITIONAL |
CORLEA , PETTIGO , DONEGAL PO |
(1) DEMOLITION OF FRONT PORCH OF EXISTING DWELLING HOUSE (2) ERECTION OF (A) NEW FRONT PORCH (B) EXTENTION TO SIDE OF DWELLING HOUSE (C) DOMESTIC GARAGE WITH ATTACHED SHEEP HOLDING PEN... login required. |
Details... |
440m |
09/02/2021 |
CONDITIONAL |
FINCASHEL , PETTIGO , DONEGAL PO |
RETENTION OF (1) EXTENSION TO THE EXISTING OFFICE, LOCATED ALONG THE SOUTH EASTERN BOUNDARY, WHERE SAME EXTENSION IS IN THE FORM OF TWO PREFABRICATED UNITS (2) THREE PREFABRICATE UNITS FOR USE AS; CANTEEN, STAFF WELFARE AND OFFICE STORE, ALL OF WHICH ARE LOCATED TOWARDS THE SOUTH EASTERN CORNER OF THE SITE (3) GENERAL STORAGE UNIT, IN THE FORM OF STEEL LORRY CONTAINER, LOCATED AT SOUTH EASTERN CORNER OF THE S... login required. |
Details... |
2.6km |
01/02/2021 |
CONDITIONAL |
CARNTRESSY , PETTIGO , DONEGAL PO |
CHANGE OF HOUSE DESIGN TO PREVIOUS PLANNING REFERENCE NO: 17/50913... login required. |
Details... |
440m |
27/01/2021 |
CONDITIONAL |
FINCASHEL , PETTIGO , DONEGAL PO |
(1) 3 BAY EXTENSION TO THE SOUTH WEST SIDE OF THE EXISTING MAIN STORAGE / PROCESSING SHED (2) REVISED SITE BOUNDARY, TO INCLUDE AN EXTENSION TO THE EXISTING YARD TOWARD THE NORTH WEST OF THE SITE (3) UPGRADED REPLACEME... login required. |
Details... |