160m |
18/02/2025 |
N/A |
FINCASHEL , PETTIGO , CO. DONEGAL |
CONSTRUCTION OF A LIGHT ENGINEERING WORKSHOP FOR THE FABRICATION, ASSEMBLY AND MAINTENANCE OF EQUIPMENT, WITH ASSOCIATED SITEWORKS SUCH AS PARKING, DRAINAGE SYSTEMS, LANDSCAPING AND THE PROVISION AND DIVERSION OF EXISTING SERVICES, INCLUDING AN OVERHEAD ELECTRICITY CABLE... login required. |
Details... |
1.9km |
29/01/2025 |
N/A |
KIMMID , PETTIGO , DONEGAL PO |
(1) REFURBISHMENT OF EXISTING DWELLING HOUSE AND ALTERATIONS TO THE EXISTING FABRIC OF THE DWELLING HOUSE, (2) DECOMMISSIONING OF EXISTING SEPTIC TANK AND REPLACEMENT... login required. |
Details... |
1.9km |
23/01/2025 |
N/A |
KIMMID , PETTIGO , DONEGAL PO |
(1) REFURBISHMENT OF EXISTING DWELLING HOUSE AND ALTERATIONS TO THE EXISTING FABRIC OF THE DWELLING HOUSE, (2) DECOMMISSIONING OF EXISTING SEPTIC TANK AND REPLACEMENT... login required. |
Details... |
1.6km |
12/09/2024 |
N/A |
BELAUT NORTH , PETTIGO , DONEGAL PO |
RETENTION AND COMPLETION OF REAR ANNEX, THE LINKING AND CONVERSION OF THE EXISTING BARN TO ACCOMMODATION, THE INSTALLATION OF PACKAGE TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS AND PERMISSION FOR RENOVATION OF THE EXISTING DERELICT DWELLING... login required. |
Details... |
1.8km |
29/08/2024 |
CONDITIONAL |
KIMMID , PETTIGO , CO. DONEGAL |
CONSTRUCTION OF PORTAL FRAMED CATTLE SHED, SLURRY STORAGE TANK, CONCRETE APRON AND ALL ASSOCIATED SITE WORKS
... login required. |
Details... |
2km |
09/07/2024 |
UNCONDITIONAL |
DRUMHARRIFF TD , PETTIGO , DONEGAL PO |
ERECTION OF A DWELLING HOUSE WITH EFFLUENT TREATMENT SYSTEM AND POLISHING FILTER ... login required. |
Details... |
1.4km |
24/04/2024 |
REFUSED |
DRUMHARRIFF , PETTIGO , CO DONEGAL |
CONSTRUCTION OF A DWELLING, INSTALLATION OF PACKAGE TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.6km |
24/04/2024 |
REFUSED |
BELAULT NORTH , PETTIGO , CO DONEGAL |
(1) RENOVATION OF EXISTING DERELICT DWELLING, (2) RETENTION AND COMPLETION OF REAR ANNEX AND THE LINKING AND CONVERSION OF EXISTING BARN TO ACCOMMODATION AND (3) INSTALLATION OF PACKAGE TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.8km |
21/12/2023 |
CONDITIONAL |
PETTIGO , DRUMHARRIFF , DONEGAL PO |
(1) INSTALLATION OF AN INTEGRATED CONSTRUCTED WETLAND (ICW) TYPE WASTEWATER TREATMENT PLANT (WWTP) FOR THE TREATMENT OF WASTEWATER FROM THE PETTIGO AGGLOMERATION COMPRISING OF A SEPTIC TANK AND ICW PONDS, (2) CONSTRUCTION OF (A) NEW ACCESS ROA... login required. |
Details... |
1.5km |
06/11/2023 |
CONDITIONAL |
FINCASHEL , PETTIGO , DONEGAL PO |
CONSTRUCTION OF A FOUR BY TWO BAY SHEEP SHED, STORAGE TANK BELOW, SOAKAWAY AND HANDLING PEN INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.5km |
22/06/2023 |
CONDITIONAL |
BELAULT NORTH , PETTIGO , DONEGAL PO |
DEMOLITION OF EXISTING DWELLING HOUSE AND DOMESTIC GARAGE, RECONSTRUCTION OF A DWELLING AND GARAGE, AND RECONNECTION OF ALL SERVICES TO INCLUDE ALL ASSOCIATED SITE WORKS... login required. |
Details... |
30m |
03/08/2022 |
CONDITIONAL |
FINCASHEL , PETTIGO , DONEGAL PO |
(1) INTENSIFICATION OF THE EXISTING COMPOSTING AND WASTE RECOVERY ACTIVITIES FROM AN ANNUAL TONNAGE OF 25,000 TONNES TO 150,000 TONNES, (2) UPGRADING OF THE EXISTING SURFACE WATER DRAINAGE INFRASTRUCTURE, AN UPGRADED ON-SITE WASTEWATER TREATMENT SYSTEM (OSWTS) WITH SOIL... login required. |
Details... |