Skip to main content
All plans now 50% off - Limited offer for Business and Individual Subscriber accounts. Discount expires on Wednesday, 22 January 2025.

PlanningAlerts.ie includes information on over 400,000 planning across Ireland over the past 10 years. In this link we identify the "wind farms" and "turbines" that were included in planning applications across the country over the past 10 years.


Wind Farm & Turbine Planning Applications

PlanningAlerts.ie includes information on over 400,000 planning across Ireland since 2010. Using this valuable information, it is possible to extract keywords on various planning trends across the country. In this case, we focused on the location of all planning applications that include keywords relating to wind energy. The keywords we selected for this study include "wind farm" and "turbine". 

Take a look at the locations of these planning applications in relation to their decision status and location on the map. You can tap on any planning application to view the planning application file on PlanningAlerts.ie. 

Sign up for a business account

Summary of 255 Windfarm / Turbine planning applications:

  • Granted Applications: 105
  • Refused Applications: 35
  • Other Statuses / Pending: 115
Received: Address: Development: Further Details:
03/01/2025 Leinster
(full address available after signup)
for a period of 10 years for a development at this site situated in the townlands of Acragar, Ballyconra, Ballycuddihy, Ballyroe, Ballyroe (Grace), Ballyroe (Maher), Baunaniska, Boherkyle, Briskalagh, Brittas, Clone, Coolnapisha, Curraghduff, Freshford, Freshford Lots, Graigueswood, Grange, Huntstown, Kilmanagh, Knockeenglass, Knockown, Moatpark, Monabrika, Monavadaroe, Moneenaun, Oldtown, Oldtownhill, Parksgrove, Picketstown, Rathealy, Sart, Sweethill, Tobernapeastia, Tullaroan, Upperwood Demesne, Co. Kilkenny. The development will consist of the provision of the following: i. 7 no. wind TURBINEs with an overall Read more
20/12/2024 Munster
(full address available after signup)
A fifteen (15) year planning permission for continuation of the operational life of the existing Gneeves WIND FARM from the date of expiration (November 2025) of the current planning permission (N/99/616, 03/6585, 04/188). The site measures 10.101 hectares. The existing WIND FARM consists of the following; 11 no. existing, operational Vestas V52 wind TURBINEs, 8 no. TURBINE<... Read more
19/12/2024 Munster
(full address available after signup)
The proposed development will consist of the construction of a detached building for domestic use ancillary to the main dwelling and the development of on-site renewable energy infrastructure. The proposed development will comprise of: 1) the removal of existing tennis court, 2) the construction of a detached building comprising of storage and gallery space, gym and leisure facilities including lap pool and padel and tennis courts at roof level, in addition to access lift and pavilion area, 3) the provision of 14 no. ground mounted arrays, each with 18 no. photovoltaic panels; 4) 12 no. mini wind TURBINEs of 1.25 metres in height, 5) the provision... Read more
18/12/2024 Leinster
(full address available after signup)
RETENTION permission for continued use of an existing guyed wind monitoring mast, with instruments , 100m in height on its lands for a further period of three years. The purpose of the mast is to assess the suitability of the company`s adjacent lands for WIND FARM development. Previous planning application reference numbers: 16/6259 & 21/620... Read more
11/12/2024 Leinster
(full address available after signup)
a ten-year permission for development on lands measuring 17.28ha. The proposed development will consist of the following: (i) Demolition of a single-storey derelict shed structure (c. 93 sqm GFA) to facilitate the TURBINE haul route (ii) Construction of two E175 EP5 wind energy converters, each with an electrical rating of 7MW, an overall ground-to-blade tip height of 199.9 metres, a rotor blade diameter of 175 metres, hub height of 112.4 metres, associated foundations and hard-standing areas; (iii) Construction of an 800m permanent internal site access road which will run from the L50462 to the wind energy converter hardstanding areas including a... Read more
26/11/2024 Munster
(full address available after signup)
A fifteen (15) year planning permission for continuation of the operational life of the existing Gneeves WIND FARM from the date of expiration (November 2025) of the current planning permission (N/99/616, 03/6585, 04/188). The site measures 10.101 hectares. The existing WIND FARM consists of the following; 11 no. existing, operational Vestas V52 wind TURBINEs, 8 no. TURBINE<... Read more
18/11/2024 Leinster
(full address available after signup)
Permission for a ten year development for: (i) The construction of 5 no. wind TURBINEs with the following parameters: a) Total tip height range of 179.5m – 180m, b) Rotor diameter range of 149m – 163m, c) Hub height range of 98m to 105m, (ii) Construction of TURBINE foundations, crane hardstand areas and assembly areas; (iii) All associated WIND FARM underground electrical and communications cabling connecting the Read more
15/11/2024 Leinster
(full address available after signup)
permission for a period of 10 years for a development at this site situated in the townlands of Acragar, Ballyconra, Ballycuddihy, Ballyroe, Ballyroe (Grace), Ballyroe (Maher), Baunaniska, Boherkyle, Briskalagh, Brittas, Clone, Coolnapisha, Curraghduff, Freshford, Freshford Lots, Graigueswood, Grange, Huntstown, Kilmanagh, Knockeenglass, Knockown, Moatpark, Monabrika, Monavadaroe, Moneenaun, Oldtown, Oldtownhill, Parksgrove, Picketstown, Rathealy, Sart, Sweethill, Tobernapeastia, Tullaroan, Upperwood Demesne, Co. Kilkenny. The development will consist of the provision of the following: i. 7 no. wind TURBINEs with an overall Read more
08/11/2024 Leinster
(full address available after signup)
Permission for development at this site (The Ballywater WIND FARM)... Read more
31/10/2024 Connaught
(full address available after signup)
We, Tullynamoyle Windfarm 5 Ltd., give notice of our intention to apply for planning permission to amend a previously permitted development granted planning permission granted under An Bord Pleanála Reference PL12.312895 (Leitrim Co Co Reference 21/57) in the townlands of Tullinloughan, Lackagh, Tullynamoyle and Gowlaun, County Leitrim. The permitted development provides for the construction of a 10 year permission for an additional 4 wind TURBINEs with ancillary substation building, container unit, and associated plant and site development works under a 10-year duration planning permission. The proposed amendments to the permitted developmen... Read more
29/10/2024 Leinster
(full address available after signup)
Permission for development at this site (The Ballywater WIND FARM)... Read more
17/10/2024 Munster
(full address available after signup)
Permission for the construction of a single 4.3MW wind TURBINE, inclusive of underground connection to new on-site electrical building and associated infrastructure. The application relates to an establishment operating under an Industrial Emissions Licence. Hovione is notified as a Lower Tier Establishment under the Major Accidents Directive (as enacted by S.I. 209 of 2015). A Natura Impact Statement and Environmental Impact Assessment Report will be submitted to the Planning Authority with the application.... Read more
11/10/2024 Leinster
(full address available after signup)
the development will consist of a 10 year planning permission for 180 Megawatt gas fired peaking power plant on a site comprising 7.87 ha. The electricity generating station will comprise • 3 no. open cycle gas TURBINEs (OCGT) generators each consisting of an air intake filter system, exhaust stack (30m high), fin fan coolers, start transformer, power control centre, fire extinguishing cabinet; and waste process water tank. • Liquid fuel storage (secondary fuel) supply which includes; three bunded fuel storage tanks each with 1,950m3 capacity (15m diameter x 11m high). • unloading area, fuel polishing and transfer system building and fuel pipework... Read more
09/10/2024 Leinster
(full address available after signup)
intend to apply for permission for a period of 10 years for a development at this site situated in the townlands of Acragar, Ballyconra, Ballycuddihy, Ballyroe, Ballyroe (Grace), Ballyroe (Maher), Baunaniska, Boherkyle, Briskalagh, Brittas, Clone, Coolnapisha, Curraghduff, Freshford, Freshford Lots, Graigueswood, Grange, Huntstown, Kilmanagh, Knockeenglass, Knockown, Moatpark, Monabrika, Monavadaroe, Moneenaun, Oldtown, Oldtownhill, Parksgrove, Picketstown, Rathealy, Sart, Sweethill, Tobernapeastia, Tullaroan, Upperwood Demesne, Co. Kilkenny. The development will consist of the provision of the following: i .7 no. wind TURBINEs with an overal... Read more
07/10/2024 Munster
(full address available after signup)
the development that will consist of the following works: (a) Demolition and removal of existing build on-site. (b) The construction of a new open cycle TURBINE Power Generation Station with an output of up to 299 Megawatts. The proposed station will consist of 1 no. Gas TURBINE and 1 no. 44 m high Exhaust Stack, 1no. AIS Substation and associated lighting column, 1 no. single storey Packaged Electronic/Electrical Control Compartment, 1 no. single storey Continuous Emission Monitoring System Shelter, Associated Fin Fan Coolers, 1no. Storage and Warehouse... Read more
19/09/2024 Connaught
(full address available after signup)
a twenty (20) year planning permission for continuations of the operational life of the existing WIND FARM (SCC Reg. Ref 98/533 & ABP Pl Ref. 21.110572 as amended by SCC Reg Ref.04/1315) from the date of expiration (23rd June 2025) of the current permission. No modifications are proposed to the existing WIND FARM which comprises the follow elements: a. 4 no. existing wind TURBINEs with a hub height of 44m and a rotor diameter of 52m; b. Existing 1 no. onsite ... Read more
19/09/2024 Ulster
(full address available after signup)
ELEMENTS OF WIND FARM INFRASTRUCTURE AND RECTIFICATION OF ASSOCIATED RED LINE BOUNDARY ... Read more
18/09/2024 Munster
(full address available after signup)
The proposed development will consist of a.) a full decommissioning and removal of existing 0.8MW Wind TURBINE b.) Construction of a new 2.35MW Wind TURBINE with a hub height of 58.9 metres, a rotor diameter of 82 metres and an overall tip height of 99.9 metres c.) wind TURBINE foundation d.) hardstanding area e.) underground electrical cables and f.) all associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with ap... Read more
11/09/2024 Munster
(full address available after signup)
Permission for the construction of a single 4.3MW wind TURBINE, inclusive of underground connection to new on-site electrical building, and associated infrastructure. The application relates to an establishment operating under an Industrial Emissions Licence. Hovione is notified as a Lower Tier Establishment under the Major Accident’s Directive (as enacted by S.I. 209 of 2015). A Natura Impact Statement and Environmental Impact Assessment Report will be submitted to the planning authority with the application.... Read more
04/09/2024 Ulster
(full address available after signup)
permission to erecting a 850kW Wind TURBINE, located at the North area of our existing plant; the Wind TURBINE will be installed with a hub height of 65 meters and a blade radius of 26 meters, with underground ducting connecting to the existing ESB substation and all associated site works. A Natura Impact Assessment (NIS) will be submitted to the Planning Authority in connection with the application described above... Read more
04/09/2024 Munster
(full address available after signup)
the proposed development of 9 no. wind TURBINEs, 110kV substation and ancilliary development located in the townlands of Snatty, Hurdlestown, Oatfield, Drumsillagh, Sallybank, Gortacullin, Aharinaghbeg, Knockshanvo, Cloontra, Cloghoolia, Ballycullen and others, County Clare. And located in the townland... Read more
30/08/2024 Munster
(full address available after signup)
Permission for the construction of a single 4.3MW wind TURBINE, inclusive of underground connection to new on-site electrical building, and associated infrastructure. The application relates to an establishment operating under an Industrial Emissions License. Hovione is notified as a Lower Tier Establishment under the Major Accident`s Directive (as enacted by S.I. 209 of2015). A Natura Impact Statement and Environmental Impact Assessment report will be submitted to the planning authority with the application.... Read more
29/08/2024 Munster
(full address available after signup)
The development will consist of: (i) The construction of 7 no. wind TURBINEs with the following parameters: a. Total tip height range of 179.5m – 180m, b. Rotor diameter range of 149m – 155m, c. Hub height range of 102.5m to 105m, (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated WIND FARM underground electrical and communications cabling connecting the TURBINEs and mast to the proposed electrical substation; (iv) C... Read more
29/08/2024 Connaught
(full address available after signup)
A ten year permission for the development of a WIND FARM project. The development will consist of: - the construction of up to 8 No. wind TURBINEs with a maximum overall tip height of between 176-180m, comprising rotor diameters ranging between 133-150m and hub heights ranging between 105-112m high; - associated wind TURBINE foundations and hard stand areas at each TURBI... Read more
28/08/2024 Leinster
(full address available after signup)
•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which wi... Read more
23/08/2024 Leinster
(full address available after signup)
Lea Mór Renewable Energy Community (REC) Limited,intend to apply for permission for development at this site at Rin, Co. Offaly. The development will consist of: • The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. • Installation of the hardstanding area for the Wind Energy Converter. • Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. • Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It wil... Read more
21/08/2024 Munster
(full address available after signup)
a ten-year planning permission for development at a site in the townlands of Kilbane, Killeagy (Ryan), Shannaknock, Killeagy (Stritch), Killeagy (Goonan), Ballymoloney, Magherareagh and Lackareagh Beg, Co Clare. The development will consist of: (i) The construction of 7 No. wind TURBINEs with the following parameters: a. Total tip height range of 179.5m - 180m, b. Rotor diameter range of 149m - 155m, c. Hub height range of 102.5m to 105m; (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated WIND FARM undergroun... Read more
13/08/2024 Leinster
(full address available after signup)
for a Data Centre and will comprise of: The demolition of 3 no. dwelling houses, associated garages and farm outbuildings / agricultural buildings (total floor area 1,591m2); The construction of 6 no. two storey data centre buildings, each with loading bays, external plant area including electrical and mechanical plant rooms, fuel compound, sprinkler tanks and associated ancillary development; Data centre building Nos. 1, 2, 3, 4 and 6 will consist of: a data hall (24,756m2, overall height 19m), an administration block (2,505m2 overall height 15m) and include an external screened plant area of 18m in height and 6,164m2; Gas TURBINEs, gas engine an... Read more
09/08/2024 Ulster
(full address available after signup)
erecting a 850kW Wind TURBINE, located at the North area of our existing plant; the Wind TURBINE will be installed with a hub height of 65 meters and a blade radius of 26 meters, with underground ducting connecting to the existing ESB substation and all associated site works... Read more
09/08/2024 Munster
(full address available after signup)
The Applicant is seeking permission for the construction, operation and decommissioning of a wind energy development including: • 9 wind TURBINEs each with a blade tip height of 175 metres, rotor diameter of 150 metres, hub height of 100 metres and a rated output of 4.5 megawatts. • TURBINE Foundations, crane pad hardstanding areas and associated drainage. • Upgrade of existing site tracks and construction of new site tracks and associated drainage. • Access from the local road L5302 at Crought, Ballyclogh including a new site entrance for the constr... Read more
01/08/2024 Leinster
(full address available after signup)
for a Data Centre and will comprise of: The demolition of 3 no. dwelling houses, associated garages and farm outbuildings / agricultural buildings (total floor area 1,591m2); The construction of 6 no. two storey data centre buildings, each with loading bays, external plant area including electrical and mechanical plant rooms, fuel compound, sprinkler tanks and associated ancillary development; Data centre building Nos. 1, 2, 3, 4 and 6 will consist of: a data hall (24,756m2, overall height 19m), an administration block (2,505m2 overall height 15m) and include an external screened plant area of 18m in height and 6,164m2; Gas TURBINEs, gas engine an... Read more
29/07/2024 Leinster
(full address available after signup)
•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which will ... Read more
23/07/2024 Leinster
(full address available after signup)
•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which wi... Read more
09/07/2024 Munster
(full address available after signup)
Permission for construction of a single 4.3MW wind TURBINE generator (WTG) at their facility. This application will be inclusive of the TURBINE, underground connection to new on-site electrical building and all associated infrastructure. Proposed project will contribute towards decarbonizing the Hovione facility by using energy from WTG to power on-site operations. This facility operates under an Industrial Emissions Licence. Permission is accompanied with both an Environmental Impact Assessment Report (EIAR) & Natura Impact Statement (NIS)... Read more
28/06/2024 Munster
(full address available after signup)
Permission for the construction, operation and decommissioning of a wind energy development including: • 9 wind TURBINEs each with a blade tip height of 175 metres, rotor diameter of 150 metres, hub height of 100 metres and a rated output of 4.5 megawatts. • TURBINE Foundations, crane pad hardstanding areas and associated drainage. • Upgrade of existing site tracks and construction of new site tracks and associated drainage. • Access from the local road L5302 at Croughta, Ballyclogh including a new site entrance for the construction phase and upgradi... Read more
26/06/2024 Munster
(full address available after signup)
temporary road widening works and construction of temporary sections of stoned roads and all ancillary development on the R691 and L-2107-2 at bends and junctions to enable the delivery of TURBINE components to consist of: • Construction of a temporary section of stoned road located adjacent to the R691 in the townland of Harleypark to accommodate abnormal load deliveries. The works will require a temporary bridge crossing and all associated drainage and sediment protection, temporary works and storage area, temporary stockpiles and demolition and reinstatement of a section of stone wall to accommodate the works. • Temporary widening of section o... Read more
21/06/2024 Leinster
(full address available after signup)
for the proposed development to consist of temporary road widening works and construction of temporary sections of stoned roads and all ancillary works on the R691 and R695 at bends and junctions to enable the delivery of TURBINE components. These works consist of; • Temporary widening of section of the R691 in the townland of Booly comprising construction of a stoned area to accommodate abnormal load deliveries. • Construction of a temporary section of stoned road off the R691 and R695 in the townland of Ballyclovan to accommodate abnormal load deliveries. • Construction of a temporary section of stoned road off the R691 in the townland of S... Read more
21/06/2024 Munster
(full address available after signup)
temporary road widening works and construction of temporary sections of stoned roads and all ancillary development on the R691 and L-2107-2 at bends and junctions to enable the delivery of TURBINE components. These works consist of; • Construction of a temporary section of stoned road located adjacent to the R691 in the townland of Harleypark to accommodate abnormal load deliveries. The works will require a temporary bridge crossing and all associated drainage and sediment protection, temporary works and storage area, temporary stockpiles and demolition and reinstatement of a section of stone wall to accommodate the works. • Temporary widening o... Read more
07/06/2024 Ulster
(full address available after signup)
10 YEAR PLANNING PERMISSION FOR WORKS RELATING TO BRADÁN WIND FARM WHICH WILL CONSIST OF (1) THE UPGRADE OF APPROXIMATELY 0.7KM OF EXISTING ACCESS TRACK AND EXISTING SITE ENTRANCE, (2) CONSTRUCTION OF APPROXIMATELY 1.2KM OF NEW ACCESS TRACKS AND NEW SITE ENTRANCE, (3) CONSTRUCTION OF A 5.5M SPAN TEMPORARY BRIDGE AND ASSOCIATED ANCILLARY INFRASTRUCTURE... Read more
15/05/2024 Connaught
(full address available after signup)
Section 5 Declaration: maintenance works to an existing culvert and watercourse to allow for the placing of a micro hydro TURBINE in the existing culvert serving the watercourse... Read more
07/05/2024 Leinster
(full address available after signup)
for development. The development will consist of: (i) All works (within County Kilkenny) associated with the connection of the proposed Seskin WIND FARM to the national electricity grid, via underground 38kV electrical cabling within the public road corridor to the existing Kilkenny 110kV substation; (ii) Provision of 16 no. joint bays, communication chambers and earth sheath links along the underground electrical cabling route; (iii) Reinstatement of the road and track surfaces above cabling trench along existing roads and tracks; (iv) Carriageway strengthening works at ‘Black Bridge’ on the L1835 / L3037 (Protected Structure RPS Ref. D84); ... Read more
07/05/2024 Leinster
(full address available after signup)
PERMISSION The development will consist of a 220kV underground cable measuring approximately 4.0m in length, from the Ringsend Open Cycle Gas TURBINE (OCGT) plant permitted under application ref: PWSDZ3074/23 and the existing Irishtown 220kV substation, to facilitate electricity generated to be transferred to the national grid, and includes all associated works to facilitate the development.... Read more
26/04/2024 Leinster
(full address available after signup)
The development will consist of a 220kV underground cable measuring approximately 4.0m in length, from the Ringsend Open Cycle Gas TURBINE (OCGT) plant permitted under application ref: PWSDZ3074/23 and the existing Irishtown 220kV substation, to facilitate electricity generated to be transferred to the national grid, and includes all associated works to facilitate the development.... Read more
26/04/2024 Leinster
(full address available after signup)
to replace an existing telecommunications installation, wind TURBINE, associated equipment compound and fencing with a new 15m monopole type telecommunications support structure carrying antenna and dishes enclosed within a 2.4 metre high palisade fenced compound together with associated ground equipment cabinets and associated site works . Revised by Significant Further Information which consists of Retention Permission sought for existing telecommunications installation, wind TURBINE and associated equipment compound and fencing and planning permissio... Read more
25/04/2024 Munster
(full address available after signup)
Permission for a) a wind TURBINE with a maximum hub height of 85m, a maximum rotor diameter of 71m and a maximum overall blade tip height of 120.5m, b) a transformer building, c) associated site works, including temporary construction access, for energy self-supply on-lands adjacent to its existing plant. The TURBINE dimensions have been reduced from that originally granted under planning reg 10/6157 (PL04.238982). The application relates to a facility which is licensed by the environmental protection agency under an industrial emissions (IE) licence. Th... Read more
18/04/2024 Munster
(full address available after signup)
the construction of foundation drainage at the base of six wind TURBINEs ( TURBINEs number: 6, 7, 8, 9, 11, and 19)... Read more
29/03/2024 Munster
(full address available after signup)
for the erection of 4 no. wind TURBINEs with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m, the construction of crane hardstand areas and TURBINE foundations, the creation of a new site entrance onto the L6132, construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of 1 no. permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to inc... Read more
20/03/2024 Munster
(full address available after signup)
The proposed development will consist of the removal of an existing 14.445 metres telecommunications monopole and replacement with a new 18 metres telecommunications monopole together with antennas, remote radio units (RRU`s), dish, GPS, cable ladder, gantry poles, nominal wind TURBINE affixed on top of monopole, supporting fixtures, concrete foundation, extension of an existing fence and all associated site development works to provide for high-speed wireless data and broadband services... Read more
28/02/2024 Leinster
(full address available after signup)
development which will consist of alterations to the development consented under Westmeath Planning Case Ref. 21/515 (parent permission) and are as follows: (i) reconfiguration of structures and pipework within the above ground installation (AGI) compound, (ii) increase the size of gas oil (secondary fuel) storage tanks and bund and realignment of tanks within the bund, (iii) remove one consented emergency diesel generator from the development layout and reposition of the second consented emergency diesel generator alongside an LV switchroom, (iv) reposition palisade fence associated with ancillary equipment compound approximately 15m to the west, (v) reconfigure and reposition fuel pumps (polishing and forwarding), MCC equipment, fire wate... Read more
23/02/2024 Leinster
(full address available after signup)
the continued operation of the existing Cronelea Upper WIND FARM; as permitted under Wicklow County Council Planning Register Reference 01/4273 (An Bord Pleanála Reference PL27.125044); for a further period of 15-years following the expiry of its current planning permission. The existing WIND FARM comprises (i) 3 no. wind TURBINEs and associated TURBINE foundations an... Read more
08/02/2024 Munster
(full address available after signup)
1. Solar PV panels to the existing hotel roof 2. Two new wind TURBINEs, not exceeding 21.2m height. 3. A Container battery storage installation with 6 electric vehicle charge points, weather monitoring station and associated site works... Read more
07/02/2024 Munster
(full address available after signup)
(1). Solar PV panels to the existing hotel roof (2). Two new wind TURBINEs, not exceeding 21.2m height (3). A container battery storage installation with 6 electric vehicle charge points, weather monitoring station and associated site works... Read more
19/01/2024 Connaught
(full address available after signup)
ten year planning permission with a 40-year operational life (from the date of commissioning of the development). (ii) Construction of 4 No. wind TURBINEs with an overall ground to blade tip height ranging from 149.85m to 150m inclusive. The wind TURBINEs will have a rotor diameter ranging from 115.7m to 117m inclusive and a hub height ranging from 91.5m to 92m inclusive. (iii) Construction of permanent TURBINE hardstands and Read more
22/12/2023 Munster
(full address available after signup)
temporary road widening works to the R691 along bends and junctions to enable the delivery of TURBINE components. These works consist of; • Temporary widening of section of the R691 in the townland of Harleypark and Aughnacrumpane comprising construction of a stoned area on a bend to accommodate abnormal load deliveries. The works will be in the roadside verge and require the demolition and reinstatement of a stone wall. • Temporary widening of section of the R691 in the townland of Harleypark comprising construction of a stoned area at a bend to accommodate abnormal load vehicles. The demolition of a stone wall and reinstatement is required to... Read more
21/12/2023 Connaught
(full address available after signup)
planning permission for the installation of three no. 20 kW wind TURBINEs within the grounds of the existing Connacht GAA Centre of Excellence previously permitted and constructed under Pl. Ref P08/1995. The three TURBINEs will have a tower height of 18m, a blade diameter of 9.8m and a blade tip height of 24m. The installation of the three no. wind TURBINEs will be adjacent to the existing 3G pitch and will include all associated site development works within t... Read more
19/12/2023 Connaught
(full address available after signup)
development will consist of (i) the construction of a 30m-high free-standing lattice meteorological mast with underground cabling to the existing Black Lough WIND FARM control building; and (ii) all associated ancillary works... Read more
08/12/2023 Connaught
(full address available after signup)
The development will consist of (i) the construction of a 30m-high free-standing lattice meteorological mast with underground cabling to the existing Black Lough WIND FARM control building; and (ii) all associated ancillary works.... Read more
04/12/2023 Leinster
(full address available after signup)
for works relating to the TURBINE Delivery Route for Farranrory WIND FARM. The proposed development will consist of: • Construction of a Blade transfer area, located off the N76, in the townlands of Browns Town, and Rathaleek includes hardstanding areas for cranes, welfare facilities and parking for staff, laydown area for TURBINE blades, temporary removable security barrier and all associated drainage and ancillary works. • Temporary widening of a section... Read more
04/12/2023 Munster
(full address available after signup)
temporary road widening works to the R691 along bends and junctions to enable the delivery of TURBINE components to consist of; a) Temporary widening of section of the R691 in the townland of Harleypark, Aughnacrumpane and Scotsborough comprising construction of a stoned area on a bend to accommodate abnormal load deliveries, the works will be in the roadside verge and require the demolition and reinstatement of a stone wall, b) Temporary widening of section of the R691 in the townland of Harleypark comprising construction of a stoned area at a bend to accommodate abnormal load vehicles, the demolition of a stone wall and reinstatement is requir... Read more
29/11/2023 Leinster
(full address available after signup)
for development at this site. The development will consist of : erecting a 2MW Wind TURBINE, located to the southwest of our main building; the Wind TURBINE will be installed with a hub height of 64 meters and a blade radius of 35.5 meters, with underground ducting connecting to the existing ESB substation and all associated site works at Queally Pig Slaughtering Limited T/A Dawn Pork and Bacon. The application relates to the development which comprises of an activity which holds an Integrated Pollution Control Licence (IPC) (Licence No. P0175-02)... Read more
24/11/2023 Munster
(full address available after signup)
Permission for the relocation and erection of a small micro generation research wind TURBINE at the north -eastern corner of the site. The wind TURBINE will be used to provide power to the Beaufort Building and for the educational purposes. The project involves: 1) construction of a concrete foundation for the TURBINE (measuring 12.25m2), 2) erection of the tower and TURBINE... Read more
21/11/2023 Leinster
(full address available after signup)
for the construction of a Blade transfer area, located off the N76, in the townlands of Browns Town, and Rathaleek includes hardstanding areas for cranes, welfare facilities and parking for staff, laydown area for TURBINE blades, temporary removable security barrier and all associated drainage and ancillary works. •Temporary widening of a section of the R691 in the townland of Ballyclovan at the junction of the R695 comprising construction of a stoned area to accommodate abnormal load deliveries.... Read more
21/11/2023 Munster
(full address available after signup)
temporary road widening works to the R691 along bends and junctions to enable the delivery of TURBINE components. These works consist of; (1) Temporary widening of section of the R691 in the townland of Harleypark, Aughnacrumpane and Scotsborough comprising construction of a stoned area on a bend to accommodate abnormal load deliveries. The works will be in the roadside verge and require the demolition and reinstatement of a stone wall, (2) Temporary widening of section of the R691 in the townland of Harleypark comprising construction of a stoned area at a bend to accommodate abnormal load vehicles. The demolition of a stone wall and reinstatement... Read more
17/11/2023 Leinster
(full address available after signup)
proposed development. The proposed development includes an amendment to the development permitted under Reg. Ref. 21/1080, The proposed development will consist of the following to facilitate the above. Demolition of the existing structures on the western part of the site that comprises 4 no. industrial commercial buildings, an associated hut / outbuilding, a gas enclosure, and a tank with bund wall. The removal of the remains of a previously demolished building, areas of hard standing, and existing surface treatments. The relocation of the Energy Centre 1 to the western part of the site, which will supersede the previously permitted 110kV GIS substation compound at that location under ABP Ref: VA27.309252. The proposed development will pro... Read more
16/11/2023 Ulster
(full address available after signup)
permission for the installation of a TURBINE Service Base Compound consisting of an Office/Canteen unit, 2 no. storage containers, a 2-person toilet block unit with an associated underground alarmed effluent tank, and all ancillary site works on an area adjacent to the existing Drumlins Park WIND FARM 110kV Substation and Compound ... Read more
03/11/2023 Ulster
(full address available after signup)
permission for the installation of a TURBINE Service Base Compound consisting of an Office/Canteen unit, 2No. Storage containers, a 2-person toilet block unit with an associated underground alarmed effluent tank, and all ancillary site works on an area adjacent to the existing Drumlins Park WIND FARM 110kV Substation and Compound... Read more
31/10/2023 Connaught
(full address available after signup)
Permission for amendments to (i) extant planning permission PD18/313, which amended planning application PD/11/126, (ii) extant planning permission ABP-303677-19, which amended planning permissions PD11/126 and PD18/313 and (iii) extant planning permission ABP-307726-20, which amended planning permission PD18/313. The output from the development will be 4.9MW, similar to the extant planning permissions. The amendments will provide for 1. Erection of two bespoke Enercon E138 TURBINEs models in lieu of the Vensys 121 TURBINE models agreed with the Plann... Read more
24/10/2023 Connaught
(full address available after signup)
Planning permission for a renewable wind energy development of a one (1) TURBINE WIND FARM. The proposed development will be located in the townland of Riverstown, approximately 2.2km north of Gorteen, Co. Sligo. The development will comprise of one (1) electricity generating wind TURBINE, which will have an overall maximum tip height of 180 meters, comprising a tower of nominally 112 meters high, and rotor diameter of up to 136 meters. The development will ... Read more
23/10/2023 Ulster
(full address available after signup)
(1) INSTALLATION OF A GRID TRANSFORMER IN THE PREVIOUSLY CONSENTED AND CONSTRUCTED LENALEA WIND FARM SUBSTATION TO PLANNING REFERENCES: 09/50116 AND 20/50835 AND (2) CONSTRUCTION OF AN INDEPENDANT POWER PRODUCER (IPP) BUILDING (MEASURING 149M2) ALONG WITH ASSOCIATED GRID COMPENSATION EQUIPMENT, A DIESEL GENERATOR, AND UNDER GROUND CABLE TRENCHES LINKING THE PROPOSED IPP BUILDING TO THE GRID TRANSFORMER, AUXILIARY EQUIPMENT, A BOREHOLE AND ALL ANCILLARY WORKS ... Read more
19/10/2023 Leinster
(full address available after signup)
continued use of an existing guyed wind monitoring mast, with instruments, 100m in height for a further period of three years. The purpose of the mast is to assess the suitability of the company`s adjacent lands for WIND FARM development. Previous planning application numbers: 15/86 and 20/183 on its lands... Read more
17/10/2023 Connaught
(full address available after signup)
Planning permission for amendments to (i) extant planning permission PD/18/313, which amended planning application PD/11/126, (ii) extant planning permission ABP-303677-19, which amended planning permissions PD/11/126 and PD/18/313 and (iii) extant planning permission ABP-307726-20, which amended planning permission PD/18/313. The output from the development will be 4.9MW similar to the extant planning permissions. The amendments will provide for: 1. Erection of two bespoke Enercon E138 TURBINEs models in lieu of the Vensys 121 TURBINE models agreed wi... Read more
12/10/2023 Connaught
(full address available after signup)
The development shall consist of planning permission for the erection of two (2) number, three (3) meter high helical vertical axis wind TURBINEs, with each wind TURBINE upon a twelve (12) meter high demountable support pole, all to support the previously approved planning permission P22/419 and to include all other ancillary site services and development works associated with this permission as contained within the application documentation.... Read more
11/10/2023 Ulster
(full address available after signup)
GRANT OF A 10 YEAR PLANNING PERMISSION FOR DEVELOPMENT OF A 14 TURBINE WIND FARM ON A SITE IN THE TOWNLAND OF AUGHT, APPROXIMATELY 5KM WEST OF QUIGLEY`S POINT. THE DEVELOPMENT WILL COMPRISE OF 14 NO ELECTRICITY GENERATING WIND TURBINES WITH A HUB HEIGHT OF 65 METRES AND A ROTOR DIAMETER OF 71 METRES GIVING AN OVERALL HEIGHT OF UP TO 100.5 METRES, HARDSTANDING, AN ELECTRICAL COMPOUND AND SUBSTATION BUILDING, ASSOCIATED SITE ROADS AND SITE WORKS. IT IS PROPOSED T... Read more
06/10/2023 Leinster
(full address available after signup)
A ten year Planning Permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables WIND FARM development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii) Reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) All associated site development works, ancillary works and... Read more
06/10/2023 Munster
(full address available after signup)
an amendment to the planning application previously granted permission under planning reference 20/972. The previously consented planning application included the construction of 9 TURBINEs with maximum overall ground to blade tip height of up to 150 metres, associated foundations and hardstand areas; new site entrances, upgrade of existing site entrances; new on-site 38KV substation and all ancillary site works. The proposed amendments to the previously consented application comprise: (1) Increase the tip height of the TURBINEs from 150 to 156.5 metre... Read more
29/09/2023 Connaught
(full address available after signup)
Permission for a development relating to the: • The construction of one Enercon E138 Wind TURBINE on an 81m tower with an electrical rating of 4.2MW and an overall tip height of 149.38m • Installation of the hardstanding area for the Wind TURBINE. • Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. • Construction of the proposed substation building which will be located c.282m from the proposed wind Read more
22/09/2023 Leinster
(full address available after signup)
a ten-year planning permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables WIND FARM development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii)reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) all associated site development works, ancillary works and... Read more
22/09/2023 Munster
(full address available after signup)
(1) The construction of 7 no. wind TURBINEs and associated hardstand areas with the following parameters a) total tip height range of 179.5m – 185m, b) rotor diameter range of 149m – 163m, c) hub height range of 103.5m to 110.5m; (2) 1 no. permanent 38kV electrical substation which will be constructed in the townland of Faddan Beg consisting of a single storey control building with welfare facilities, all associated electrical plant and equipment, battery energy storage system, security fencing, all associated underground cabling, wastewater holding tank and all ancillary works and equipment; (3) All works (within County Tipperary) associated wit... Read more
15/09/2023 Connaught
(full address available after signup)
Permission for the proposed Project relating to: •The construction of one Enercon E138 Wind TURBINE on an 81m tower with an electrical rating of 4.2MW and an overall tip height of 149.38m •Installation of the hardstanding area for the Wind TURBINE. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c.282m from the proposed wind Read more
15/09/2023 Leinster
(full address available after signup)
Permission to erect a 3MW Wind TURBINE, located at the East area of our existing biopharmaceuticals plant; the Wind TURBINE will be installed with a hub height of 80 meters and a blade radius of 45 meters, with underground ducting connecting to the existing ESB substation. The application relates to the development which comprises of an activity which holds an Industrial Emissions Discharge (IED) Licence (Licence No. P1122-01)... Read more
08/09/2023 Munster
(full address available after signup)
for development comprising of : a) 1940m of underground electrical cabling in Keereen Upper and Knocknamona townlands, linking Knocknamona Windfarm (to be constructed) to the Woodhouse Substation (operational). b) Works within the existing Woodhouse Substation compound in Keereen Upper, comprising a new control building 5.3m X 3.8m and 4.6m high; a 110kV electrical transformer c.6m in height, with associated plinth and bund; an electrical transformer bay; 2 No. lightening masts 17.5m in height and ancillary electrical equipment. Works within the Woodhouse Substation compound will also include a new access track 17m long and 4.5m in width; additional palisade gateway 4.9m wide and 2.6m in height with palisade fencing within the compound and ... Read more
07/09/2023 Munster
(full address available after signup)
the construction of foundation drainage at the base of six wind TURBINEs ( TURBINEs number: 6, 7, 8, 9, 11, and 19)... Read more
21/08/2023 Ulster
(full address available after signup)
(A) CONSTRUCTION OF ONE ENERCON E138 WIND TURBINE ON A 99M TOWER WITH AN ELECTRICAL RATING OF 4.2MW AND AN OVERALL TIP HEIGHT OF 169M, (B) THE CONSTRUCTION OF WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA, (C) PROVISION OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE, (D) CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS... Read more
17/08/2023 Ulster
(full address available after signup)
CONSTRUCTION OF TWO WIND TURBINES COMPRISING A STEEL TOWER, NACELLES AND COMPOSITE FIBRE ROTOR BLADES WITH A HUB HEIGHT OF UP TO 85 METRES, A ROTOR BLADE DIAMETER OF UP TO 82 METRES, AND THUS A BLADE TIP HEIGHT OF UP TO 126 METRES. THE PROPOSED DEVELOPMENT ALSO INCLUDES EXTERNAL WIND TURBINE TRANSFORMERS; TURBINE HARDSTANDS; NEW ACCESS TRACKS, UPGRADE OF EXISTING TRACKS, NEW SITE ENTRANCE; DRAINAGE WORKS INCLUDING DRAINAGE CHANNELS AND SILT TRAPS ALONG THE ACCE... Read more
17/08/2023 Connaught
(full address available after signup)
Permission for development relating to the: •The construction of one Enercon E138 Wind TURBINE on an 81m tower with an electrical rating of 4.2MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind TURBINE. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c.282m from the proposed wind Read more
11/08/2023 Leinster
(full address available after signup)
the proposed development will comprise a 170MW (electrical output) Open Cycle Gas TURBINE (OCGT) Power Plant. The proposed development will comprise an electricity generating plant which will use Hydrotreated Vegetable Oil (HVO) as fuel and will be connected to a previously consented 110kV substation (ABP-303678-19) and associated site works and improved access from the R152. The development comprises the following elements: a) Three gas TURBINE buildings (each 990m2) each housing 1 no. Read more
08/08/2023 Munster
(full address available after signup)
the demolition and removal of existing build on-site. The construction of a new Gas Fired open cycle TURBINE Power Generation Station with an output of up to 293 Megawatts. The proposed station will consist of 1 no. Gas TURBINE and 1 no. 44 m high Exhaust Stack, 1 no. AIS Substation and associated lighting column, 1 no. single storey Packaged Electronic/Electrical Control Compartment, 1 no. single storey Continuous Emission Monitoring System Shelter, Associated Fin Fan Coolers, 1no. Storage and Warehouse building, 1no. fuel oil storage tank, 1 no. dimine... Read more
20/07/2023 Munster
(full address available after signup)
A new grid connection route connecting the permitted Ballylongford windfarm (Kerry County Council planning ref 19/381) ( An Bord Pleanala ref- PL08.304807) at Aghanagran Middle And Lower, Ballyline West And Tullahennel South, Ballylongford, to the proposed 38kVsubstation (Kerry County Council planning ref 23/431) at Tullamore, Listowel, Co Kerry. The route will entail the installation of approximately 7.3km of 38kv underground electric cable passing through townlands of Aghanagran Lower, Ballyline West, Kilgarvan, Coolkeragh, and Tullamore in County, Kerry The proposed grid route is proposed to be via underground cables located along the public roads : L10028, R552, and L-1009, and private property. The new grid route is a change a pr... Read more
19/07/2023 Connaught
(full address available after signup)
The installation of a modular medium-voltage electricity substation at the Spion Kop WIND FARM to be located adjacent to the existing electricity switchroom. The substation will contain electrical equipment and apparatus to facilitate the connection of the development permitted under Leitrim County Council Planning Register Reference 19/230 (An Bord Pleanála Reference ABP-307627-20) to the national electricity network. The proposed development also comprises ancillary underground electrical and communications cabling and associated site development and reinstatement works.... Read more
12/07/2023 Leinster
(full address available after signup)
Alterations to the development permitted under Reg. Ref.: SD18A/0068, as previously amended under Reg. Ref.: SD19A/0185 and Reg. Ref.: SD20A/0242, and to the development permitted under Reg. Ref.: SD20A/0309, as previously amended under Reg. Ref.: SD22A/0093. The proposed alterations in summary comprise the provision of an altered energy centre design and all associated development, along with minor alterations to the permitted site layout, provision of a gas AGI, and all ancillary works. The development, for which a 5-year planning permission is sought, will comprise the following: Construction of a revised energy centre in the western part of the subject site, to accommodate alternate generation technology, including 10 no. gas generation... Read more
07/07/2023 Munster
(full address available after signup)
Permission for the installation of a wind TURBINE and associated works... Read more
30/06/2023 Ulster
(full address available after signup)
erect domestic Wind TURBINE and all associated works... Read more
23/06/2023 Ulster
(full address available after signup)
(1) A 38KV UNDERGROUND CABLE GRID CONNECTION APPROXIMATELY 9KM IN LENGTH FROM THE CONSENTED DERRYKILLEW COMMUNITY WIND FARM (AN BORD PLEANÁLA REF. NO. 307520, DONEGAL COUNTY COUNCIL REF. NO. 19/51750) TO LANDS AT TOWNPARKS, NORTH OF THE EXISTING CATHALEEN`S FALL 110KV SUBSTATION IN BALLYSHANNON, (2) A PARTIAL SECTION OF A 38KV OVERHEAD LINE GRID CONNECTION CROSSING 130M OVER THE RIVER ERNE AT CATHALEEN`S FALL, BALLYSHANNON, AND (3) THE DERRYKILLEW COMMUNITY WIND FARM 38KV SUBSTATION AND A BATTERY ENERGY STORAGE SYSTEM. AN ENVIRONMENTAL IMPACT ASSESSMENT ... Read more
20/06/2023 Munster
(full address available after signup)
for development, the development is located in the townlands of Ballykett, Tullybrack East and Tullybrack, Kilrush, Co Clare. The Development will consist of the erection of 4 no. wind TURBINEs with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m. The development will also consist of the construction of crane hardstand areas and TURBINE foundations, new site entrance onto the L6132, construction of one no. temporary construction compound with associated temporary site offices, parking areas and security... Read more
13/06/2023 Connaught
(full address available after signup)
for a 10-year permission for development at this site at Letter, Moycullen, Co. Galway. This site is located within a Gaeltacht area. The proposed development will consist of the provision of a synchronous condenser, enclosed within a building (12.5 metres high) with associated plant and apparatus, transformers, circuit breakers, modular electrical control containers, air compressor, cooling equipment, underground cabling (including 110kV connection to the adjacent Buffy substation (within Ardderroo WIND FARM), lightning protection poles, perimeter security fencing, drainage, landscaping, temporary construction compound, access tracks (new and upg... Read more
09/06/2023 Leinster
(full address available after signup)
The development will consist of 1 no. 2.MW Wind TURBINE, Service Road,... Read more
06/06/2023 Munster
(full address available after signup)
THE DEVELOPMENT IN COUNTY KERRY FORMS PART OF A RENEWABLE ENERGY DEVELOPMENT COMPRISING A FIVE- TURBINE WIND FARM AND ALL ASSOCIATED WORKS ON LANDS IN BOTH COUNTIES CORK AND KERRY. THE DEVELOPMENT IN COUNTY KERRY WILL CONSIST OF UPGRADE OF EXISTING FOREST ACCESS ROADS TO INCLUDE PASSING BAYS AND ALL ASSOCIATED DRAINAGE INFRASTRUCTURE, WORKS AT THE ENTRANCE TO AN EXISTING FOREST ROAD ACCESSED OFF THE N22 TO INCLUDE LOCALISED WIDENING OF THE FOREST ROAD AND CREATION OF A SPLAYED ENTRANCE, REMOVAL OF EXISTING VEGETATION FOR VISIBILITY SPLAYS AND REMOVAL OF ... Read more
06/06/2023 Munster
(full address available after signup)
Development is sought for a period of 10 years at a 10.22 hectares site within ESB Aghada Generating Station consisting of 1) Construction/installation of an open cycle gas TURBINE (OCGT) generating unit and associated plant and equipment, comprising the following main components with approximate dimensions as stated : Gas TURBINE air intake [24m x 18m x 26m high], Generator enclosure [24m x 18m x 14.5m high], Gas TURBINE enclosure [53m x 15m x 26m high], Exhau... Read more
06/06/2023 Munster
(full address available after signup)
We, Inchamore Wind Designated Activity Company, intend to apply for permission for a ten-year planning permission for a renewable energy development. The entirety of the renewable energy development constitutes the provision of a five- TURBINE WIND FARM and all associated works on land in both Counties Cork and Kerry. The development for will consist of : 1) a WIND FARM with an operational lifespan of 35 years (from date of commissioning of the development), 2) ... Read more
02/06/2023 Munster
(full address available after signup)
is sought for the continued operation of the existing Booltiagh WIND FARM as permitted by An Bord Pleanala Ref: 03.120616 (Clare County Council Pl. Ref: 00/567) for a further period of 10 years from the date of the expiry of the current planning permission (30th September 2025) per Condition no. 2 of the consent issued and for the decommissioning of the WIND FARM at the end of that further period. The proposed development development does not comprise any modifications to the existing operational Read more
01/06/2023 Connaught
(full address available after signup)
for the following: (1) alterations to the Cnoc Raithní (Knockranny) WIND FARM (Galway County Council pl. ref. no. 13/829 & ABP ref: 07.243094 comprising 11no. wind TURBINEs with an overall ground to blade tip height of 150m (an increase of 19.5m & 9.5m from 130.5m & 140.5m, as previously permitted), a rotor blade length of 68m or 69m & a hub height of 81m or 82m; associated increase in TURBINE foundations; & omission of permitted on-site 110kV substation & unde... Read more
26/05/2023 Munster
(full address available after signup)
Permission for; a) a wind TURBINE with a maximum height of 85m, a maximum rotor diameter of 71 m and a maximum overall blade tip height of 120.5m; b) a transformer building; c) associated site works, including temporary construction access, for energy self-supply on lands adjacent to its plant Ardnageehy, Charleville, Co.Cork. The TURBINE dimensions have been reduced from that originally granted permission under planning reg 10/6157 (PL04.238982). The application relates to a facility which is licensed by the Environmental Protection Agency under industr... Read more
17/05/2023 Munster
(full address available after signup)
for development at lands at Crossmore County Clare in the townlands of Furroor, Illaunatoo or Sorrelisand, Boolynakockaun and Booltiagh. The development will consist of: 1. Amendment to item (1) of Permitted Development Pl. Ref: 21/1057 to install a 38kV electrical connection over a total length of approximately 11km, from the permitted Crossmore WIND FARM (Pl. Ref: 09/123, as extended under Pl. Ref: 19/388 and altered by Pl. Ref: 20/284) to the entrance to the existing Booltiagh 110kV electrical substation. This amended connection will consist of: a. Revision to site boundaries as permitted under Pl. Ref: 21/1057; b. Removal of permitted overhead... Read more
05/05/2023 Connaught
(full address available after signup)
the construction of an intake weir, collection chamber, fish pass, one number sound insulated TURBINE house with a ridge height of 4.375 m above finished floor level plus buried transfer pipe and electricity cable. An EIAR/Natura Impact Statement has been prepared to accompany the planning application... Read more
28/04/2023 Connaught
(full address available after signup)
A nominal 50 megawatt electricity generating station, combusting woody biomass chips (domestic and imported) as well as a small proportion of fuel oil for boiler start-up. The total site area is 19.0 ha of which approximately 7 ha will be developed. The elements of the station are: weighbridges (2 no.), scale house, roundwood storage area, log deck, enclosed wood chipper, wood chip truck dump, wood chip receiving hopper, wood chip screen, wood chip hog, wood chip bins (2 no.), wood chip storage building, wood chip reclaimer, wood chip conveyors with associated magnetic separators, fuel oil storage tank and associated pumps, fuel oil generator, boiler house, baghouse, ash silo, induced draft fan room, boiler stack, combustion air and flue ... Read more
19/04/2023 Leinster
(full address available after signup)
the construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.2MW and an overall tip height of 149.38m. Installation of the hardstanding area for the Wind Energy Converter. Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. Construction of the proposed substation building which will be located c. 98m from the proposed wind TURBINE and surrounded by stock proof fencing. It will be a single storey building, measuring 55m2 and c.4.8m in height. Construction of prop... Read more
12/04/2023 Connaught
(full address available after signup)
to construct a dwelling including a wastewater treatment plant & percolation area, a domestic wind TURBINE and all associated landscaping and site services; and to include conversion of an existing shed to a domestic garage... Read more
14/03/2023 Munster
(full address available after signup)
Alterations to the dimensions of the 7 no. wind TURBINEs permitted as part of the Knocknamork Renewable Energy development (planning reference 19/4972). The proposed development includes the provision of 7 no. wind TURBINEs with an overall ground to blade tip height of 175m (an increase of 25m, from 150m), a rotor blade length of 75m and a hub height of 100m, and all associated site development and ancillary works, an operational period and planning permission duration to align with the existing permission (planning reference no. 19/4972 ) is sought. An ... Read more
13/03/2023 Munster
(full address available after signup)
A WIND FARM with an operational lifespan of 30 years, from commissioning, which will connect to the national grid. The proposed WIND FARM will consist of 7 no. wind TURBINEs with blade tip heights of up to a maximum of 150 metres, and associated foundations and hardstand areas. The proposed development includes a site substation compound with security fencing and a single storey control building and associated loop-in infrastructure to tie into an existing 38... Read more
09/03/2023 Munster
(full address available after signup)
for development of a WIND FARM in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O`Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind Read more
02/03/2023 Connaught
(full address available after signup)
to erect 20kw domestic wind TURBINE and associated site works.... Read more
01/03/2023 Munster
(full address available after signup)
Permission for one wind TURBINE only, to be located on the northern portion of the application site. Extension of Duration to Permission granted under Planning Ref. No. 11/4946; ABP ref 04.240330... Read more
16/02/2023 Munster
(full address available after signup)
A WIND FARM with an operational lifespan of 30 years, from commissioning, which will connect to the national grid. The proposed WIND FARM will consist of 7 no. wind TURBINEs with blade tip heights of up to a maximum of 150 metres, and associated foundations and hardstand areas. The proposed development includes a site substation compound with security fencing and a single storey control building and associated loop-in infrastructure to tie into an existing 38... Read more
13/02/2023 Munster
(full address available after signup)
the development that will consist of the following works: (a) demolition and removal of existing build on-site, (b) the construction of a new Gas Fired open cycle TURBINE Power Generation Station with an output of up to 293 Megawatts. The proposed station will consist of 1 no. Gas TURBINE and 1 no. 44 m high Exhaust Stack, 1 no. AlS Substation and associated lighting column, 1 no. single storey Packaged Electronic/Electrical Control Compartment, 1 no. single storey Continuous Emission Monitoring System Shelter, Associated Fin Fan Coolers, 1no. Storage an... Read more
08/02/2023 Connaught
(full address available after signup)
Continued temporary use of the existing Western Way Bridge Bypass on the N59 (at the N59/R312 junction). The existing bypass will facilitate TURBINE component delilveries to the consented Sheskin WIND FARM (Planning Reg. Ref. P19/457). The existing bypass consists of an upgraded access track and a stream crossing. The stream crossing will be removed following the delivery of TURBINE components to Sheskin Read more
07/02/2023 Connaught
(full address available after signup)
The development will consist of a 114 Megawatt gas fired peaking power plant (which will be capable of running on a mix of natural gas and hydrogen) comprising the ’electricity generating station’. The electricity generating station will comprise of 2 no. open cycle gas TURBINE (OCGT) generators each consisting of an air intake filter system, exhaust stack (28 metres high), air vent stack, inter cooler system, TURBINE control room and transformers. In addition the development will include: • Above Ground Installation (AGI) to facilitate connectio... Read more
31/01/2023 Leinster
(full address available after signup)
The proposed development will consist of: 1. Demolition of the existing Babcock Store building; 1 No. Hydrogen Tank; the temporary Control Building; 1 No. Water Tank within the National Oil Reserves Agency (NORA) Bunded Area 2. Construction/ installation of an OCGT generating unit and associated plant and equipment, comprising the following main components: - An exhaust stack approx. 40m in height (approx. 8m diameter and 40m H) - Gas TURBINE Air Intake (approx. 24m L x 18m W x 26m H) - Generator Enclosure (approx. 24m L x 18m W x 14.5m H) - Gas TURBINERead more
26/01/2023 Connaught
(full address available after signup)
for the erection of 6 no. wind TURBINEs with an overall ground to blade tip height of 185m with a rotor diameter of 162m and a hub height of 104m. The development will also consist of the construction of crane hardstand areas and TURBINE foundations, improvement of existing site entrance with access onto the N59, construction of one no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of 1 no. permanent meteorological mast of 104m overall height, construction of new internal site acc... Read more
20/01/2023 Leinster
(full address available after signup)
PERMISSION:The proposed development will consist of the following elements: 1.Demolition of two storage buildings and demolition of four oil tanks within the bunded area of the NORA Ringsend oil farm 2.Construction/installation of an Open Cycle Gas TURBINE (OCGT) generating unit and associated plant and equipment, comprising the following main components: • Gas TURBINE Air Intake (approx. 24m L x 18m W x 26m H) • Generator Enclosure (approx. 24m L x 18m W x 14.5m H) • Gas Read more
18/01/2023 Munster
(full address available after signup)
The development consists of continuing the use of the wind energy development as constructed, beyond the time limit specified under condition no.3 planning reference no. 08/2124, originally granted planning permission under planning reference no. 03/1367 (extended under planning reference no. 06/3269). The wind energy development as permitted and constructed comprises 1 no. TURBINE with an overall height of 99.5m; hardstand area; substation and control room building; and extension of existing forest road to provide access... Read more
13/01/2023 Munster
(full address available after signup)
for development of a WIND FARM in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O`Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind Read more
06/01/2023 Munster
(full address available after signup)
(I) A WIND TURBINE WITH A HUB HEIGHT OF 40 METERS, A ROTOR DIAMETER OF 54 METERS AND AN OVERALL TIP HEIGHT OF 67 METRES; (II) WIND TURBINE FOUNDATION; (III) CRANE HARDSTANDING; (IV) ON-SITE ACCESS TRACK; (V) UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLES; AND (VI) ALL ASSOICATED AND ANCILLARY SITE DEVELOPMENT, ACCESS, LANDSCAPING, AND REINSTATMENT WORKS. THE OPERATIONAL LIFETIME OF THE PROPSED DEVELOPMENT IS 35 YEARS. THIS IS A 10 YEAR PLANNING PERMISSION... Read more
04/01/2023 Ulster
(full address available after signup)
development consisting of the erection of an electricity generating wind TURBINE with hub height of 80 metres and a maximum tip height of 130 metres, hardstanding area, site entrance and access road together with all ancillary site development works... Read more
23/12/2022 Munster
(full address available after signup)
A WIND FARM with an operational lifespan of 30 years, from commissioning, which will connect to the national grid. The proposed WIND FARM will consist of 7 no. wind TURBINEs with blade tip heights of up to a maximum of 150 metres, and associated foundations and hardstand areas. The proposed development includes a site substation compound with security fencing and a single storey control building and associated loop-in infrastructure to tie into an existing 38... Read more
22/12/2022 Connaught
(full address available after signup)
amendment to the development permitted under Leitrim County Planning Register Reference P.19/26 for the construction of a culvert crossing to an existing stream along the access to consented wind TURBINE no. 18.The planning application will be accompanied by a Natura Impact Statement (NIS) ... Read more
15/12/2022 Munster
(full address available after signup)
A windfarm with an operational lifespan of 30 years, from commissioning, which will connect to the national grid. The proposed WIND FARM will consist of 7 no. wind TURBINEs with blade tip heights of up to a maximum of 150 metres, and associated foundations and hardstand areas. The proposed development includes a site substation compound with security fencing and a single storey control building and associated loop-in infrastructure to tie into an existing 38kV overhead transmission line, underground cabling, drainage and service infrastructure, bored w... Read more
25/11/2022 Connaught
(full address available after signup)
development consisting of the extension of the lifespan of the operational Lackan WIND FARM by 12 years to October 2035. Lackan WIND FARM consists of 3 No. TURBINEs (64m hub height, 71m Rotor diameter - 99.5m tip height), site access roads, hardstand areas, underground cabling from each TURBINE to the control building, drainage, and ancillary works, as granted Planni... Read more
22/11/2022 Connaught
(full address available after signup)
Five year permission for the development of a temporary access track adjacent to the L52926 local road, required to faciliate the delivery of TURBINE components to the consented Sheskin WIND FARM (P19/457). Locally sourced gravel will be used to create an access track on private lands adjacent to the L52926 so delivery vehicles can make a right turn from the N59 onto the L52926. The land required for the access track will be reinstated shortly after TURBINE com... Read more
21/11/2022 Leinster
(full address available after signup)
Installation of a micro-hydro power generation system (containing Pump-as- TURBINE technology). the development consists of installing a mini weir and Coanda intake screen in the stream beside Mileeven, a 300m pipe beside the stream to supply a PAT gnerator to supply electricity to the facility and eturn the abstracted water at low velocity to the stream. An Environmental Impact Statement accompanies this application.... Read more
17/11/2022 Connaught
(full address available after signup)
for the development consisting of a wind energy development comprising of one electricity generating wind TURBINE, with an overall blade tip height of up to 168m, construction of c. 150m of permanent access track, 110m of temporary access track, road widening works along the existing local access road from the R327 to the proposed site access track, a crane hardstand, a 20kV substation, site electrical & fibre optic cabling & ancillary site works. The maximum output capacity of the WIND FARM will be c.4.8MW. This application is seeking a 10 year permiss... Read more
07/11/2022 Leinster
(full address available after signup)
erect a 500kw wind TURBINE, located at the south area of our waste water treatment plant, with a hub height of 65 meters and a blade diameter of 44 meters, with underground ducting connecting to existing ESB substation and all associated site works . The application relates to development which comprises an activity which holds an IPPC Licence (Licence Reg. No. P0781-02)... Read more
07/11/2022 Ulster
(full address available after signup)
permission consisting of the erection of one electricity generating wind TURBINE with hub height of 80 metres and a maximum tip height of 130 metres, hardstanding area, site entrance and access road together with all ancillary site development works ... Read more
28/10/2022 Connaught
(full address available after signup)
for amendments to the single wind TURBINE development, permitted under Galway County Council Ref. Nos. 13/1139, 19/147 (Extension of Duration) and 20/1617, comprising an increase in the overall ground to wind TURBINE blade tip height, from up to 89.95 metres to 99.50 metres, the associated wind TURBINE hub height and rotor diameter alterations and to increase the width of the crane hardstand from 20 metres to 22 metres and the length from 30 metres to 40 metres... Read more
28/10/2022 Leinster
(full address available after signup)
for a purpose-built brewery as follows: - Main Brewery Facility (c.9,148m2) including brew house, storage and handling areas, labs, control rooms, workshops, plant rooms/areas (internal and external/roof), storage rooms/areas, process areas and valve blocks, utilities and services areas, circulation, office/admin and welfare facilities, and all associated ancillary areas. Building height ranging up to c.24.3m and including ground floor area (c.7,325m2), part basement (c.72m2), 1st floor (c.1,213m2), 2nd floor (c.270m2) and 3rd floor (c.268m2). Tanker filling station (open area with canopy c.462m2) and raw materials deliveries area (open area with canopy c.138m2 in extent), 92 no. new storage vessels/silos/tanks, with associated access platf... Read more
24/10/2022 Leinster
(full address available after signup)
for the demolition of a wind TURBINE of 150kw that was erected with planning ref. number 09125 and apply for Planning Permission to erect a 500kw wind TURBINE, located at the south-east corner of our land, with a hub height of 65 meters and a blade diameter of 44 meters, with underground ducting connecting to existing ESB substation and all associated site works... Read more
12/10/2022 Leinster
(full address available after signup)
THE CONTINUED USE OF AN EXISTING GUYED WIND MONITORING MAST, WITH INSTRUMENTS, 100M IN HEIGHT FOR A FURTHER PERIOD OF THREE YEARS. THE PURPOSE OF THE MAST IS TO ASSESS THE SUITABILITY OF THE COMPANY`S ADJACENT LANDS FOR WIND FARM DEVELOPMENT. PREVIOUS PLANNING APPLICATION NUMBER PL2/16/399... Read more
12/10/2022 Ulster
(full address available after signup)
permission consisting of the erection of one electricity generating wind TURBINE with hub height of 80 metres and a maximum tip height of 130 metres, hardstanding area, site entrance and access road together with all ancillary site development works ... Read more
07/10/2022 Leinster
(full address available after signup)
development will consist of the erection of five wind TURBINEs with TURBINE blade diameter of 117m and overall height to tip of 136.5m. one permanent meteorlogical mast, access road and internal tracks, electricity sub-station, temporary construction compound, TURBINE laydown area, control building, 1 borrow pit, crane hardstanding, underground cabling, up to approximately 18 hectares of forestry felling and all associated site works, with an operation lifetime... Read more
03/10/2022 Leinster
(full address available after signup)
partial completion of redevelopment of the existing club grounds and infrastructure previously granted under pl. Ref. no. 10264 and pl. ref. no 1653 as follows: (a) Completion of construction of facilities adjacent to 3 no. external all-weather Tennis Courts (mainly fencing) (b) Completion of construction of 2 no. "hard court" Tennis/multi-purpose Courts and associated facilities, (c) Extension to the existing single storey Clubhouse currently constructed and associated works (d) Completion/construction of new car parking facilities, lighting and associated works (e) Completion of upgrading of existing pedestrian access from Shillelagh Road, redevelopment of vehicular entry access at existing site entrance (on Tullow Hill road) . (f) Constr... Read more
23/09/2022 Leinster
(full address available after signup)
THE DEVELOPMENT OF (A) APPROXIMATELY 970M OF NEW INTERNAL ACCESS ROADS FOR THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/ 19/606 AND ABP 306924-20), (B) UPGRADE OF APPROXIMATELY 560M OF AN EXISTING BORD NA MONÁ BOG ACCESS ROAD, (C) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERMITTED WIND FARM SUBSTATION, (D) DEMOLITION AND REPLACEMENT OF A BORD NA MONÁ BOGLAND ACCESS BRIDGE AND (... Read more
20/09/2022 Ulster
(full address available after signup)
ERECTION OF A SINGLE ELECTRICITY GENERATING WIND TURBINE OF HUB HEIGHT UP TO 45M AND ROTOR DIAMETER UP TO 44M, A HARDSTANDING, CONTROL BUILDING, ASSOCIATED SITE ROADS, DRAINAGE AND SITE WORKS... Read more
09/09/2022 Leinster
(full address available after signup)
the erection of five wind TURBINEs with TURBINE blade diameter of 117m and overall height to tip of 136.5m. One permanent meteorological mast, access road and internal tracks, electricity substation, temporary construction compound, TURBINE laydown area, control building, 1 borrow pit, crane hardstanding, underground cabling, up to approximately 18 hectares of forestry felling and all associated site works, with an operational lifetime of 30 years. The applicat... Read more
31/08/2022 Leinster
(full address available after signup)
for the installation of a micro-hydro power generation system (containing Pump-as- TURBINE technology). The development consists of installing a mini weir and Coanda intake screen in the stream beside Mileeven. A 300m pipe beside the stream to supply a PAT generator to supply electricity to the facility and return the abstracted water at low velocity to the stream... Read more
30/08/2022 Leinster
(full address available after signup)
CONTINUED USE OF AN EXISTING GUYED WIND MONITORING MAST, WITH INSTRUMENTS, 100M IN HEIGHT FOR A FURTHER PERIOD OF THREE YEARS. THE PURPOSE OF THE MAST IS TO ASSESS THE SUITABILITY OF THE COMPANY`S ADJACENT LANDS FOR WIND FARM DEVELOPMENT. PREVIOUS PLANNING APPLICATION REFERENCE NUMBERS: PL13/242, PL19/315 (OFFALY COUNTY COUNCIL) AND PL19.243080 (AN BORD PLEANÁLA)... Read more
26/08/2022 Connaught
(full address available after signup)
development consisting of a fifteen (15) year continuation of the operational life of the existing WIND FARM (SCC Reg. Ref. PL03/619 & ABP Pl. Ref. 21.204790, as amended by SCC Reg. Ref PL10/371 and PL10/388) from the date of expiration (March 2024) of the current permissions. No modifications are proposed to the existing windfarm which comprises the following elements: (a) 13 no. existing Vestas V52 850 kilowatt (kW) wind TURBINEs with a maximum overall blade tip height of 75 metres (m) (b) Existing 1 no. onsite 20 kilovolt (kv) electrical substation co... Read more
19/08/2022 Ulster
(full address available after signup)
A TEN YEAR PLANNING PERMISSION FOR A RENEWABLE ENERGY DEVELOPMENT WITH A 40-YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT WILL CONSISTS OF (1) CONSTRUCTION OF 3 WIND TURBINE GENERATORS AND ASSOCIATED HARDSTANDS AREAS WITHIN THE FOLLOWING PARAMETERS (A) A TOTAL TIP HEIGHT IN THE RANGE OF 145 METRES MINIMUM TO 150 METRES MAXIMUM (B) HUB HEIGHT IN THE RANGE OF 82 METRES MINIMUM TO 87 METRES MAXIMUM (C) ROTOR DIAMETER IN THE RANGE OF 121 METRES MINIMUM TO 126 METRES MAXIMUM (2) UPGRADING OF EXISTING SITE ACCESS TRACKS AND ROADS AND PROVISION OF NEW SITE ACCESS TRACK AND ROADS (3) WIDENING OF 3 NO. EXISTING SITE ENTRANCES AND PR... Read more
18/08/2022 Leinster
(full address available after signup)
amend the WIND FARM development permitted under An Bord Pleanála Reference PL11.248518 (Laois County Council Planning Register Reference 16/260) to provide: (i) an increase in the rotor diameter of the wind TURBINEs from 103 metres to 117 metres; (ii) a reduction in the hub height of the wind TURBINEs from 85 metres to 78 metres, thus retaining the permitted overall tip height of the wind Read more
12/08/2022 Leinster
(full address available after signup)
(A) CONSTRUCTION OF A 1.5KM, 5M WIDE, UNPAVED, ACCESS ROAD FROM THE R401 INTO THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/19/606 AND ABP 306924-20), (B) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERMITTED WIND FARM SUBSTATION, (C) DEMOLITION AND REPLACEMENT OF A BORD NA MONÁ BOGLAND ACCESS BRIDGE AND (D) RELOCATION OF THE PERMITTED CUSHALING Read more
09/08/2022 Leinster
(full address available after signup)
CONTINUED USE OF AN EXISTING GUYED WIND MONITORING MAST, WITH INSTRUMENTS, 100M IN HEIGHT FOR A FURTHER PERIOD OF THREE YEARS. THE PURPOSE OF THE MAST IS TO ASSESS THE SUITABILITY OF THE COMPANY`S ADJACENT LANDS FOR WIND FARM DEVELOPMENT. PREVIOUS PLANNING APPLICATION REFERENCE NUMBERS: PL13/242, PL19/315 (OFFALY COUNTY COUNCIL) AND PL19.243080 (AN BORD PLEANALA)... Read more
29/07/2022 Leinster
(full address available after signup)
A 2MW PILOT SCALE HYDROGEN ELECTROLYSIS PLANT WHICH COMPRISES; AN ELECTROLYSER CONTAINED WITHIN A STANDARD ISO CONTAINER (C. 12.2M IN LENGTH, C. 2.4M IN WIDTH AND C. 3.3M IN HEIGHT), 3 NO. HIGH PRESSURE HYDROGEN STORAGE UNITS, 1 NO HYDROGEN COMPRESSION SYSTEM, 1 NO GENERATOR, 2 NO SUBSTATION/TRANSFORMER STRUCTURES AND A MEDIUM VOLTAGE UNDERGROUND CABLE CONNECTION TO THE NEAREST WIND TURBINE C. 600M TO THE WEST. THE HYDROGEN ELECTROLYSIS PLANT WILL BE SUPPORTED BY THE FOLLOWING INFRASTRUCTURE; HYDROGEN ANALYSER CONTAINER, FIREWALL (MAXIMUM HEIGHT 3.6M), UNDERGROUND FIBRE OPTIC CABLING, 2 NO. 10 CUBIC METRE BUFFER TANKS, GAS CONTROL CABINET, POWER S... Read more
28/07/2022 Munster
(full address available after signup)
(A) RETAIN ELEVATIONAL CHANGES TO THE FRONT OF HIS EXISTING DWELLING HOUSE (B) RETAIN SHED TO REAR OF DWELLING HOUSE AS CONSTRUCTED (C) RETAIN POLY TUNNEL AND GREENHOUSE AS CONSTRUCTED (D) RETAIN SOLAR PANELS AND DOMESTIC WIND TURBINE AS CONSTRUCTED ALL WITHIN REVISED SITE BOUNDARIES... Read more
15/07/2022 Leinster
(full address available after signup)
A 2MW PILOT SCALE HYDROGEN ELECTROLYSIS PLANT WHICH COMPRISES; AN ELECTROLYSER CONTAINED WITHIN A STANDARD ISO CONTAINER (C. 12.2M IN LENGTH, C. 2.4M IN WIDTH AND C. 3.3M IN HEIGHT), 3 NO. HIGH PRESSURE HYDROGEN STORAGE UNITS, 1 NO HYDROGEN COMPRESSION SYSTEM, 1 NO GENERATOR, 2 NO SUBSTATION / TRANSFORMER STRUCTURES AND A MEDIUM VOLTAGE UNDERGROUND CABLE CONNECTION TO THE NEAREST WIND TURBINE C. 600M TO THE WEST. THE HYDROGEN ELECTROLYSIS PLANT WILL BE SUPPORTED BY THE FOLLOWING INFRASTRUCTURE; HYDROGEN ANALYSER CONTAINER, FIREWALL (MAXIMUM HEIGHT 3.6M), UNDERGROUND FIBRE OPTIC CABLING, 2 NO. 10 CUBIC METRE BUFFER TANKS, GAS CONTROL CABINET, POWER... Read more
15/07/2022 Ulster
(full address available after signup)
(1) CONSTRUCTION OF (A) ONE ENERCON E138 WIND TURBINE ON AN 81M TOWER WITH AN ELECTRICAL RATING OF 4.2MW AND AN OVERALL TIP HEIGHT OF 149.38 (B) THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA (C) AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE (2) DEVELOPMENT OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE (3) ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS... Read more
14/07/2022 Ulster
(full address available after signup)
CONSTRUCTION OF A WIND TURBINE WITH AN OPERATIONAL LIFESPAN OF 30 YEARS FROM COMMISSIONING, WITH A TIP HEIGHT OF APPROXIMATELY 150 METRES, CONTROL BUILDING, UPGRADING OF SITE ENTRANCE, SITE ACCESS ROAD (APPROXIMATELY 195 METRES), HARDSTAND AREAS, UNDERGROUND CABLING AND ALL ASSOCIATED SITE WORKS... Read more
12/07/2022 Connaught
(full address available after signup)
Permission for: (A) amendments to (i) extant planning permission PD/18/313, which amended planning application PD/11/126, (ii) extant planning permission ABP-303677-19, which amended planning permissions PD/11/126 and PD/18/313 and (iii) extant planning permission ABP-307726-20, which amended planning permission PD/18/313; (B) Permission for the development of a battery storage unit and a transformer unit. The amendments in (A) above will provide for : 1. Erection of two Enercon E138 TURBINE models in lieu of the Vensys 121 TURBINE models agreed with ... Read more
28/06/2022 Connaught
(full address available after signup)
Permission for (A) amendments to (i) extant planning permission PD/18/313, which amended planning application PD/11/126, (ii) extant planning permission ABP-303677-19, which amended planning permissions PD/11/126 and PD/18/313 and (iii) extant planning permission ABP-307726-20, which amended planning permission PD/18/313. (B) Permission for the development of a battery storage unit and a transformer unit. The amendments in (A) above will provide for : 1. Erection of two Enercon E138 TURBINE models in lieu of the Vensys 121 TURBINE models agreed with t... Read more
22/06/2022 Munster
(full address available after signup)
This development is to comprise of seven number electricity generating wind TURBINEs with a hub height of up to 70 metres and a rotor diameter of up to 71 metres, an electrical compound, substation building, a 70 metres high permanent meteorological mast, four number car parking spaces and associated site roads and site works. It is proposed to source stone from an on-site borrow pit, ... Read more
15/06/2022 Ulster
(full address available after signup)
ONE LATTICE TYPE METEOROLOGICAL MAST NOT EXCEEDING 74 METRES IN HEIGHT, UNDERGROUND ELECTRICAL CABLES AND ASSOCIATED WORKS TO BE IN PLACE FOR THE LIFE OF CLOGHERAVADDY WIND FARM... Read more
08/06/2022 Munster
(full address available after signup)
the continued operation of the existing Knockastanna WIND FARM; as permitted under Limerick County Council Planning Register References 01/1385 (An Bord Pleanala Reference PL13.130938), 07/758 (An Bord Pleanala Reference PL13.224401), and 08/7007; for a further period of 15 years following the expiry of its current planning permission. The existing windfarm comprises (i) 4 No. wind TURBINEs and associated TURBINE foundations and crane hardstandings; (ii) 1 No. ... Read more
07/06/2022 Munster
(full address available after signup)
of 1) the existing 30m high lattice telecommunications structure together with antennas, dishes, wind TURBINE and associated telecommunications equipment and fencing and 2)PERMISSION to add 3 Tetra omni antennae, and a link dish to the existing 30m structure giving an overall height of 33.6m together with associated ground equipment... Read more
18/05/2022 Leinster
(full address available after signup)
a) to provide single storey extensions to side and rear of the existing two storey dwelling, b) to provide a two storey extension to the rear of the existing two storey dwelling, c) revise the fenestration arrangement of all elevations d) to build small farm storage shed incorporating a Solar PV array and 3 micro wind TURBINEs and e) all associated site works... Read more
13/05/2022 Munster
(full address available after signup)
Junction & Bend Widening Works comprising road widening at the junction of the L2024 with the L2022 in Carronahyla townland; widening of the junction of the L2022 with the L6077 and widening of two bends along the L6077 in Knocknaglogh Upper townland; and ancillary works. The proposed development will facilitate the delivery of wind TURBINE blades along the roads from Pulla crossroads on the N25, to Knocknamona Windfarm Site Entrance, at Knocknaglogh Lower on the L6077. This application is accompanied by an Environmental Impact Assessment screening report and an Appropriate Assessment Report (Natura Impact Statement)... Read more
11/05/2022 Connaught
(full address available after signup)
development consisting of the construction of a wind TURBINE with an operational lifespan of 30 years, from commissioning, with a tip height of approximately 150 metres, site access road (approximately 330m), hardstand areas, underground cabling from the TURBINE to the existing Black Lough WIND FARM control building (in Cloonkeelaun) and all ancillary site works... Read more
11/05/2022 Ulster
(full address available after signup)
(1) REMOVAL OF THE EXISTING 8 NO. 600 AND 660 KILOWATT (KW) TURBINES AND REPLACEMENT WITH 3 NO. 4.5 MEGAWATT TURBINES HAVING AN OVERALL MAXIMUM HEIGHT OF 150M CONSISTING OF A BLADE DIAMETER OF 136M AND A HUB HEIGHT OF 82M. THE DEVELOPMENT WILL ALSO CONSIST OF THE ASSOCIATED TURBINE HARDSTANDS AND FOUNDATIONS, UPGRADING OF C.910M OF EXISTING SITE ACCESS TRACK, PROVISION OF C.799M OF NEW SITE ACCESS TRACK, CONSTRUCTION OF A NEW 38KV SUBSTATION AND 2 NO. JOINT BA... Read more
29/04/2022 Munster
(full address available after signup)
Junction & Bend Widening Works comprising road widening at the junction of the L2024 with the L8077 in Carronahyla townland; widening of the junction of the L8077 with the L6077 and widening of two bends along the L6077 in Knocknaglogh Upper townland; and ancillary works. The proposed development will facilitate the delivery of wind TURBINE blades along the roads from Pulla crossroads on the N25, to Knocknamona Windfarm Site Entrance, at Knocknaglogh Lower on the L6077. This Application is accompanied by a Screening for Environmental Impact Assessment Report and an Appropriate Assessment Report (Natura Impact Statement)... Read more
28/04/2022 Connaught
(full address available after signup)
to create a new centre of excellence for both soccer and hockey. The project is a joint junction between Galway United Football Club and the Connacht Hockey Association. The proposal is to create modern training facilities for both associations. The work entails the following: a) The widening, realigning and upgrading of the existing farmyard entrance onto the R347, b) Demolition of the existing agricultural sheds and farm yard, c) Construction of new internal roads, paths, street lighting, parking areas, three free standing shelters, fencing, landscaping, ESB sub-station, signage proprietary effluent treatment system and percolation area, d) Construction a single two storey sports centre including dressing rooms, gym, canteens, meeting ro... Read more
21/04/2022 Leinster
(full address available after signup)
THE ERECTION OF A GUYED WIND MONITORING MAST, WITH INSTRUMENTS, UP TO 100M IN HEIGHT FOR A PERIOD OF SIX YEARS. THE PURPOSE OF THIS PROPOSED MAST IS TO ASSESS THE SUITABILITY OF THE COMPANY`S ADJACENT LANDS FOR WIND FARM DEVELOPMENT... Read more
20/04/2022 Connaught
(full address available after signup)
Permission for development consisting of amendments to extant planning permission ABP-307726-20 and will provide for: 1. Erection of two Enercon E138 TURBINE models in lieu of the Vensys 121 TURBINE models agreed with the Planning Authority, under condition 4 (a) of planning permission ABP-307726-20; TURBINE T1 will have a hub height of 95.53m, a blade diameter of 138m and a blade tip height of 164.65m; Read more
19/04/2022 Ulster
(full address available after signup)
permission consisting of amendments to the development permitted under Monaghan County Council Planning Register Reference 10/110 (An Bord Pleanála Reference PL18.240760) to provide for: (I) modifications to the finished floor levels of the permitted wind TURBINEs and meteorological mast to account for existing ground levels; (ii) the re-configuration of the crane hardstandings of TURBINEs T2 and T3; (iii) the omission of 845 metres of permitted WIND FARM accre... Read more
08/04/2022 Ulster
(full address available after signup)
for: 1) The construction of one Enercon 115 wind TURBINE on a 92m tower with an electrical rating of 4.2MW and an overall tip height of 149.86m; 2) The construction of the wind TURBINE foundation, hardstanding and assembly area; 3) Provision of a site entrance and an access track within the site; 4) Construction of an on-site 20kV substation and underground electrical cable; and 5) All associated site development and ancillary works Significant further information and revised plans has been submitted.... Read more
06/04/2022 Connaught
(full address available after signup)
Permission or amendments to extant planning permission ABP-307726-20 to provide for: 1. Erection of two Enercon E138 TURBINEs models in lieu of the Vensys 121 TURBINE models agreed with the Planning Authority, under condition 4(a) of planning permission ABP-307726-20. TURBINE T1 will have a hub height of 95.53m, a blade diameter of 138m and a blade tip height of 164.65m. ... Read more
04/04/2022 Ulster
(full address available after signup)
ERECTION OF A SINGLE ELECTRICITY GENERATING WIND TURBINE OF HUB HEIGHT UP TO 45M AND ROTOR DIAMETER UP TO 44M, A HARDSTANDING, CONTROL BUILDING, ASSOCIATED SITE ROADS, DRAINAGE AND SITE WORKS... Read more
01/04/2022 Leinster
(full address available after signup)
development at the 13.1 Ha site known as `Lough Ree Power (LRP) Station` located in Lanesborough (Lanesboro), in the townlands of Aghamore and Lanesborough, Eircode N37E180; in County Longford. The development will consist of the demolition of the existing LRP station (as approved under Longford County Council reg.ref 01/115 ` An Board Pleanala Ref. PL14.125540 and all subsequent permissions);and the development and operation of electricity grid services - namely a battery energy storage system (BESS) and a Synchronous Condenser (Sync Con). The proposed development comprises two distinct phases of activity - the initial demolition and site reinstatement (Phase 1); following by construction and operation of the new BESS and Sync Con (pha... Read more
28/03/2022 Connaught
(full address available after signup)
CONTINUED USE OF AN EXISTING GUYED WIND MONITORING MAST, WITH INSTRUMENTS 100M IN HEIGHT FOR A FURTHER PERIOD OF THREE YEARS. THE PURPOSE OF THE MAST IS TO ASSESS THE SUITABILITY OF THE COMPANY`S ADJACENT LANDS FOR WIND FARM DEVELOPMENT. PREVIOUS PLANNING REFERENCE P16/1013... Read more
23/03/2022 Munster
(full address available after signup)
for a revised site boundary and revised position of a single 800kW wind TURBINE, 73 metres to hub height as granted under P10/453 and P15/812... Read more
08/03/2022 Munster
(full address available after signup)
Development of a WIND FARM comprising of seven (7) number electricity generating wind TURBINEs with a hub height of 55 metres and a rotor diameter of 52 metres, an electrical compound, sub-station building, four number car park spaces, associated site roads and site works... Read more
03/03/2022 Leinster
(full address available after signup)
the construction of one Enercon 138 wind TURBINE on an 81m tower with electrical rating of 4.2MW and an overall tip height of 149.38m; The construction of the wind TURBINE foundation, hardstanding and assembly area; Provision of a site entrance and an access track within the site; Construction of an on-site 20kV substation and underground electrical cable and all associated site development and ancillary works. ... Read more
28/02/2022 Connaught
(full address available after signup)
for a development consisting of the erection of a guyed wind monitoring mast, with instruments, 100m in height for a six year period. The purpose of the proposed mast is to assess the suitability of the company`s adjacent lands for WIND FARM development.... Read more
22/12/2021 Munster
(full address available after signup)
A ten year planning permission for proposed development consisting of a 20 kilovolt (kV) electrical powerline grid connection, approximately 10,117 metres in overall length (made up of approximately 9,983 metres of underground cable and approximately 134 metres of Over Head Line with three wooden support single poles), connecting the approved electrical substation at Knockeenboy WIND FARM (Planning Register Reference No. 11/00059 & An Bord Pleanala Ref. PL88.240070) to the existing Dunmanway 110kV ESB Networks substation at Ballyhalwick; together with all ancillary works and apparatus. The grid connection will be developed from the approved subst... Read more
20/12/2021 Munster
(full address available after signup)
A 5.7MW solar farm comprising approximately 21,850 photovoltaic panels on ground mounted frames within a site area of 13.95ha, 3 no. transformer/inverter stations, security fencing, CCTV and all associated site development and landscaping works at the site of the existing Crocane WIND FARM. The proposed development will connect to the grid via the existing Crocane WIND FARM substation on site. The proposed development will utilise the existing access to the existing Crocane Read more
20/12/2021 Leinster
(full address available after signup)
CONTINUED USE OF AN EXISTING GUYED WIND MONITORING MAST, WITH INSTRUMENTS, 100M IN HEIGHT ON ITS LANDS AT ESKER MORE, CO. OFFALY FOR A FURTHER PERIOD OF TWO YEARS. THE PURPOSE OF THE MAST IS TO ASSESS THE SUITABILITY OF THE COMPANY`S ADJACENT LANDS FOR WIND FARM DEVELOPMENT. PREVIOUS PLANNING APPLICATION REFERENCE NUMBERS: PL13/161, PL18/513... Read more
17/12/2021 Leinster
(full address available after signup)
The development will consist of the construction of a part two-storey, part single-storey, extension to the front of the property, widening the existing dormer window in the main roof to the rear of the property as well as the erection of a small domestic wind TURBINE on the side wall of the house and all associated site works.... Read more
16/12/2021 Leinster
(full address available after signup)
the construction of one 4.2MW wind TURBINE with an overall tip height of up to 150m, the construction of the wind TURBINE foundation, hardstanding and assembly area, provision of a site entrance and an access track within the site. Construction of an on site 20kV substation and underground electrical cable and all associated site development and ancillary works... Read more
14/12/2021 Munster
(full address available after signup)
SEEKING A TEN - YEAR PLANNING PERMISSION AND 35 YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSION OF THE WIND FARM CONSTRUCTION OF 7 NO. WIND TURBINES WITH THE FOLLOWING MAXIMUM AND MINIMUM PARAMETERS OVERALL GROUND TO BLADE TIP HEIGHT IN THE RANGE OF 170M MAXIMUM TO 169.5M MINIMUM, HUB HEIGHT OF 95M, ROTOR DIAMETER IN THE RANGE OF 150M MAXIMUM TO 149M MINIMUM, TURBINE HARDSTAND AREAS, PROVISION OF 1 NO. PERMANENT METEORLOGICAL MAST WITH A HEIGHT OF 110 METRES,... Read more
08/12/2021 Munster
(full address available after signup)
an extension of the existing battery energy storage system (BESS) at Kilathmoy WIND FARM substation. The proposed development will consist of the following components; Lithium-ion battery containers including ancillary HVAC equipment; Power Conversion System (PCS)/Inverter units; Transformer units; Connection to the existing on site Grid Transformer, Prefabricated equipment container (switchgear and controls), back up generator, auxiliary transformer, underground cabling and associated infrastructure including compound lighting, security fencing and CCTV system, all as detailed on the planning application drawings. A Natura Impact Statement(NIS)... Read more
06/12/2021 Munster
(full address available after signup)
The construction of a one-storey dwelling house with 30sqm of solar cells, construction of stables buildings for domestic use, construction of an agricultural shed for the storage of agricultural machinery, construction of a polytunnel for domestic use, formation of new vehicular entrance to public road, a new wastewater treatment system, a wind TURBINE and all associated site works.... Read more
02/12/2021 Munster
(full address available after signup)
a temporary period of up to 5 years for the development of 3no. hydrokinetic TURBINEs, associated anchors and marker buoys upstream of Thomond Weir in the River Shannon, a junction box and cable carrying metal conduit along a section of Thomond Weir, connection of the cable to the ESB building on Brown`s Quay, placement of power conditioning and power storage unit within the building and the placement of a portacabin in the grounds of the ESB building at Brown`s Quay, Limerick City. The project will be for 24 months. A Foreshore Licence Application has been submitted for this development. An Environmental Impact Screening Report, an Ecological ... Read more
02/12/2021 Munster
(full address available after signup)
The development will consist of: . Construction of 6 no. wind TURBINEs with a blade tip height of 175m, rotor diameter of 150m and a hub height of 100m; . Construction of TURBINE foundations and crane pad hardstanding areas; . Construction of new site tracks and associated drainage infrastructure; . Upgrading of existing tracks and associated drainage infrastructure where necessary; . Upgrade of entrance onto local road L1322; . All associated drainage and sediment control including the installation of new watercourse or drain crossing and the re-use or ... Read more
26/11/2021 Leinster
(full address available after signup)
1. The construction of a Gas TURBINE Power Generation Station with an ... Read more
24/11/2021 Connaught
(full address available after signup)
for an Open Cycle Gas TURBINE power plant (299MW) and associated infrastructure and buildings. The proposed development will include: Demolition of existing administration building, gatehouse, workshop, storage buildings (3no.) and car parking area; Installation of an Open Cycle Gas TURBINE (OCGT) unit and associated plant (Including air intake, stack (40m high); main, auxiliary and ancillary transformers; fire wall; acoustic wall; electrical rooms; finfan coolers; skids (to include gas skid, distillate fuel skid, compressor cleaning skid, air drier ski... Read more
24/11/2021 Munster
(full address available after signup)
CONSTRUCT 7 NO. WIND TURBINES WITH THE FOLLOWING MAXIMUM AND MINIMUM PARAMETERS: OVERALL GROUND TO BLADE TIP HEIGHT IN THE RANGE OF 170M MAXIMUM TO 169.5M MINIMUM O HUB HEIGHT OF 95M O ROTOR DIAMETER IN THE RANGE OF 150 MAXIMUM TO 149M MINIMUM. TURBINE HARDSTAD AREAS. PROVISION OF 1 NO. PERMANENT METEOROLOGICAL MAST WITH A HEIGHT OF 110 METRES. UPGRADE OF EXISTING ROADS AND ACCESS JUNCTIONS. PROVISION OF NEW SITE ENTRANCES, ROADS AND HARDSTAND AREAS. 2 NO. TEMPORARY PEAT STORAGE AREAS. 2 NO. TEMPORARY CONSTRUCTION COMPOUNDS. 1 NO. BORROW PIT. ALL SITE DR... Read more
18/11/2021 Munster
(full address available after signup)
for a ten-year planning PERMISSION for the construction of a renewable energy development at this site, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Tooreen, Silverhill, Doonsallagh East and Knockalassa, Co. Clare (approximately 6.5km to the east of Miltown Malbay). The development will consist of the provision of the following: 1. 8 No. wind TURBINEs with an overall ground-to-blade tip height in the range of 175 metres maximum to 173 metres minimum; a blade length in the range of 75 metres maximum to 66.5 metres minimum; and hub height in the range of 108.5 metre maximum to 100 metres minimum; 2... Read more
18/11/2021 Leinster
(full address available after signup)
Retention permission for continued use of an existing Guyed Wind Monitoring Mast with instruments, 100m in height on its lands at Lisclogher Bog, Lisclogher Great, Co. Westmeath for a further period of three years. The purpose of the mast is to assess the suitability of the company`s adjacent lands for WIND FARM development. Previous planning application reference number 16/6259 refers.... Read more
05/11/2021 Munster
(full address available after signup)
a ten-year appropriate period planning permission for development of this site: the proposed development will constitute the provision of the following: the installation of 2.25 km of 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated developments. Advisory Note: The full extent of the grid connection is 33.8 km, and a separate planning application will be made for a underground grid connection to Kilkenny County Council. This development comprises part of an overall development for which planning permission was granted for a 9 Read more
03/11/2021 Connaught
(full address available after signup)
FIVE YEAR PERMISSION FOR DEVELOPMENT OF A TEMPORARY TURNING HEAD AT THE R312 AND R317 JUNCTION, REQUIRED TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE CONSENTED SHESKIN WIND FARM (P19/457). LOCALLY SOURCED GRAVEL WILL BE USED TO WIDEN THE JUNCTION SO DELIVERY VEHICLES CAN PERFORM A TURNING MANOEUVRE. THE LAND REQUIRED FOR THE TURNING HEAD WILL BE REINSTATED SHORTLY AFTER THE TURBINE COMPONENTS HAVE BEEN DELIVERED... Read more
26/10/2021 Leinster
(full address available after signup)
permission for the demolition of existing filling station workshop, retail and office and the construction of a new shop/café building with office and forecourt canopy, electric car charging ports with canopy and all associated site works. Renewable energy will be utilised in the form of solar panels and a domestic scale wind TURBINE... Read more
22/10/2021 Leinster
(full address available after signup)
the erection of a guyed wind monitoring mast with instruments, 100m in height for a period of six years. the purpose of the proposed mast is to access the suitability of the company`s adjacent lands for WIND FARM development... Read more
22/10/2021 Munster
(full address available after signup)
a ten-year appropriate period planning permission for development of this site: the proposed development will constitute the provision of the following: the installation of 2.25 km of 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated developments. Advisory Note: The full extent of the grid connection is 33.8 km, and a separate planning application will be made for a underground grid connection to Kilkenny County Council. This development comprises part of an overall development for which planning permission was granted for a 9 Read more
21/10/2021 Connaught
(full address available after signup)
Permission for development consisting of the construction of 2 no. wind TURBINEs ( TURBINE tip height of 150m, rotor diameter of 138m) with associated foundations and crane hardstand areas and all associated development including 1 no. substation control building, 1 no. permanent meteorological mast (80m height) and associated foundation, hardstand area and ancillary main crane hardstand area, 1,304m of new internal site service roads, underground electric cabling systems between Read more
12/10/2021 Munster
(full address available after signup)
a ten-year permission of a WIND FARM project. The development will consist of: Construction of up to 7 no. wind TURBINEs with a maximum overall tip height of 150m, comprising a tower of between 75-95m high, to which three blades of between 55-70m in length will be attached; Associated hard stand areas at each TURBINE; 1 no. 30m permanent meteorological mast and all associated infrastructure and works; 1 no. 38kV electrical substation and all associated infrast... Read more
07/10/2021 Munster
(full address available after signup)
a ten-year permission of a WIND FARM project. The development will consist of: Construction of up to 7 no. wind TURBINEs with a maximum overall tip height of 150m, comprising a tower of between 75-95m high, to which three blades of between 55-70m in length will be attached; Associated hard stand areas at each TURBINE; 1 no. 30m permanent meteorological mast and all associated infrastructure and works; 1 no. 38kV electrical substation and all associated infrast... Read more
07/10/2021 Ulster
(full address available after signup)
A 10 YEAR PERMISSION FOR AN AMENDED WIND FARM DEVELOPMENT, WITH AN OPERATIONAL LIFE OF 30 YEARS FROM THE DATE OF THE FIRST COMMISSIONING, IN LIEU OF THE PREVIOUSLY PERMITTED WIND FARM DEVELOPMENT [AN BORD PLEANÁLA REFERENCE NUMBER: PL 05B.237656] CONSISTING OF (A) ERECTION OF EIGHT WIND TURBINES WITH BOTH A NORDEX 133 AND AN ENERCON 126 MODEL ASSESSED, WITH ONLY ONE TYPE OF THE IDENTIFIED Read more
06/10/2021 Ulster
(full address available after signup)
10 YEAR PERMISSION FOR AN AMENDED WIND FARM DEVELOPMENT, WITH AN OPERATIONAL LIFE OF 30 YEARS FROM THE DATE OF THE FIRST COMMISSIONING, IN LIEU OF THE PREVIOUSLY PERMITTED WIND FARM DEVELOPMENT [AN BORD PLEANÁLA REFERENCE NUMBER: PL 05B.237656] CONSISTING OF (A) ERECTION OF EIGHT WIND TURBINES WITH BOTH A NORDEX 133 AND AN ENERCON 126 MODEL ASSESSED, WITH ONLY ONE TYPE OF THE IDENTIFIED Read more
06/10/2021 Munster
(full address available after signup)
for development in the townlands of Crossmore, Derrynageeha, Ballyduneen, Carrowreagh West, Corraige, Knockalough, Crag, Furroor, Boolynamweel, Illaunatoo or Sorrelisland, Boolynaknockaun, Glenmore and Booltiagh. The Development will consist of: 1. A 38kV electrical connection over a total of approximately 11km, from the permitted Crossmore WIND FARM (planning ref: P09/123, as extended under planning ref: 19/388 and altered by P20/824) to the existing 110kV Booltiagh substation. This connection will consist of approximately 10km of overhead line and associated 97 no. wooden polesets (single, double and triple structures with approximate heights ... Read more
21/09/2021 Leinster
(full address available after signup)
The development comprises 275MWe reserve gas-fired generator to boost and back up the power system and will include the following elements (a) 5no. open cycle gas TURBINE (OCGT) modules (each module being c 1042sqm) and complete with lube oil coolers, generators, air intake vents, continuous emissions monitoring (CEMS) technology, selective catalytic reduction (SCR) units and c.30m high stacks, (b) 1no two-storey administration building (32.615m long x 13m wide x 9.33m high) which contains a control room, offices, storage meeting room workshop and double height warehouse (c) 2no. 2,400m3 capacity bunded secondary fuel storage tanks (each with a di... Read more
02/09/2021 Munster
(full address available after signup)
a 7 year planning permission for a hydro electric scheme on the Glasha River at Toor, Glen Upper and Glen Lower, Co. Waterford. The scheme will comprise the installation of a water extraction structure and fish pass, 2.92 km of pipeline, a TURBINE house, a transformer building, an ESB substation and a three phase overhead line connection (150m long) from an existing ESB pole to the new ESB substation including all associated site works. A Natura Impact Statement (NIS) and an Environmental Impact Assessment Report (EIAR) will accompany this Application ... Read more
01/09/2021 Munster
(full address available after signup)
Replacement of an existing 15m high disused wind TURBINE for an 18m high free standing communications structure with its associated antennae, communication dishes, ground equipment, wooden fencing and associated site development works. The development will form part of an existing telecommunications and broadband network... Read more
27/08/2021 Munster
(full address available after signup)
7 year permission for a hydro electric scheme comprising the installation of a water extraction structure and fish pass 2.92km of pipeline, a TURBINE house, a transformer building, an ESB substation and a three phase overhead line connection (150m long) from an existing ESB pole to the new ESB substation including all associated site works. A Natura Impact Statement (NIS) and an Environmental Impact Assessment Report (EIAR) will accompany this application... Read more
23/08/2021 Ulster
(full address available after signup)
consist of minor amendments to the approved Old Mill WIND FARM (Monaghan Reg.Ref.10/485). TURBINE T5 will be removed from the scheme and the maximum tip height of the remaining 6 no. approved TURBINEs will be increased to 130m. All other elements of the approved development will remain unchanged... Read more
23/08/2021 Ulster
(full address available after signup)
construct 8no. wind TURBINEs of hub height 70m and rotor diameter 71m, with an overall height not exceeding 106m, 1no. Switch room and control facility with associated equipment and compound enclosed by a 2.4m high palisade fence, 1no. permanent anemometer mast 70m in height and all associated site works including foundations, crane hardstanding, underground cabling, construction of new 4no. site entrances and the construction of new internal site access tracks. The application is accompanied by an Environmental Impact Statement (EIS)... Read more
13/08/2021 Connaught
(full address available after signup)
CONSTRUCTION OF A WIND TURBINE WITH AN OPERATION LIFESPAN OF 30 YEARS, FROM COMMISSIONING CONSISTING OF ONE WIND TURBINE WITH A TIP HEIGHT OF APPROXIMATELY 150M, CONTROL BUILDING, NEW ACCESS ROAD (APPROX 240M), HARDSTAND AREAS, UNDERGROUND CABLING AND ALL ASSOCIATED SITE WORKS... Read more
27/07/2021 Munster
(full address available after signup)
a ten year appropriate period planning permission for the installation of 2.25km of 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated developments in the townlands of Coolnashinnagh, Ardragh, Bolakeale & Gortfree, Co. Tipperary. Advisory Note: The full extent of the grid connection is 33.8km, and a separate planning application will be made for an underground grid connection to Kilkenny County Council. This development comprises part of an overall development for which planning permission was granted for a 9- TURBINERead more
27/07/2021 Leinster
(full address available after signup)
CONSTRUCTION OF ONE 4.2MW WIND TURBINE WITH AN OVERALL TIP HEIGHT OF UP TO 150M; THE CONSTRUCTION OF THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA; PROVISION OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE; CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE; AND, ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS... Read more
22/07/2021 Leinster
(full address available after signup)
for a ten-year appropriate period planning permission for development of this site; the proposed development will constitute the provision of the following: The installation of 31.49km of a 38kV underground electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated development in the townlands of Killeen, Rathmacan, Gortnagap, Kyleballyoughter, Courtstown, Raheen, Lates, Curraghscarteen, Canvarstown, Trenchardstown, Lisnalea, Hillend, Coldharbour, Killahy, Greenhill, Lughinny, Craddockstown, Tubbrid Lower, Clomantagh Lower, Barna, Newtown, Kilrush, Belville, Lodge, Garranamanagh, Balleen Lower, Lodge, Tifeaghna (Browne), Lodge Demesne West, Lodge Demesne East, Clontubbrid, Clone, Acragar,... Read more
22/07/2021 Munster
(full address available after signup)
a ten year appropriate period planning permission for the installation of 2.25km of 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated developments in the townlands of Coolnashinnagh, Ardragh, Bolakeale & Gortfree, Co. Tipperary. Advisory Note: The full extent of the grid connection is 33.8km, and a separate planning application will be made for an underground grid connection to Kilkenny County Council. This development comprises park of an overall development for which planning permission was granted for a 9- TURBINERead more
05/07/2021 Leinster
(full address available after signup)
Permission for the erection of 1 No. wind TURBINE (hub height 65m, blade length 23.5m), and the construction of a 25.00 sq. m electrical substation, site access road, and all ancillary works ... Read more
30/06/2021 Ulster
(full address available after signup)
for development consisting of; The construction of one 4.2MW wind TURBINE with an overall tip height of up to 125m; The construction of the wind TURBINE foundation, hard standing and assembly area; Provision of a site entrance and an access track within the site; Construction of an on-site 20kV substation and underground electrical cable; and all associated development and ancillary works... Read more
24/06/2021 Ulster
(full address available after signup)
40 YEAR PERMISSION FOR AN ADDITIONAL 1 NO. WIND TURBINE, TO THE EXISTING 3 NO. TURBINE WINDFARM CONSISTING OF CONSTRUCTION OF: (1) 1 NO. WIND TURBINE WITH A HUB HEIGHT OF UP TO 84 METRES AND AN OVERALL HEIGHT OF UP TO 125 METRES TO BLADE TIP, (2) 1 NO.CRANE HARDSTAND AREA LOCATED BESIDE THE TURBINE, (3) 1 NO. 20 kV SUBSTATION BUILDING WITH ASSOCIATED ELECTRICAL PLANT ... Read more
21/06/2021 Ulster
(full address available after signup)
minor technical amendments to the development permitted under Planning Reg No 16/494 to provide for (i) an increase in the permitted wind TURBINE rotor diameter from 60 metres to up to 70.5 metres; (ii) re-location of the permitted wind TURBINE by c. 4 metres to the south together with the re-location of associated ancillary infrastructure; and (iii) all associated site development works. There shall be no increase in the tip height of the permitted wind TURBINERead more
16/06/2021 Ulster
(full address available after signup)
10 YEAR PERMISSION FOR AN AMENDED WIND FARM DEVELOPMENT, WITH AN OPERATIONAL LIFE OF 30 YEARS FROM THE DATE OF THE FIRST COMMISSIONING, IN LIEU OF THE PREVIOUSLY PERMITTED WIND FARM DEVELOPMENT [AN BORD PLEANÁLA REFERENCE NUMBER: PL O5B. 237656] CONSISTING OF (A) 8 NO. TURBINES WITH A MAXIMUM HUB HEIGHT OF 84M, A MAXIMUM BLADE DIAMETER OF 132M AND A MAXIMUM BLADE TIP HEIGHT OF 150M, ASSOCIATED ACCESS TRACKS AND HARDSTANDS, UNDERGROUND CABLE CONNECTIONS AND PEAT... Read more
11/06/2021 Connaught
(full address available after signup)
The development will consist of: Construction and operation of 1No. 4.2MW wind TURBINE, with an overall height of up to 125m at Knock South, Inverin, Co. Galway;- Installation of the hardstanding area for the wind TURBINE;- Installation of underground circuit cables which will run in underground cable trenches (c. 1.2m deep), from the proposed wind TURBINE to the proposed substation building on the site;- Construction of the proposed substation building which w... Read more
26/05/2021 Connaught
(full address available after signup)
permission for development which will consist of the construction of 2 no. wind TURBINEs (maximum TURBINE tip height 160m) with associated foundations and crane hardstand area and all associated development including 1 No. substation control building, 1 No. permanent meteorological mast (80m height) and associated foundation, hardstand area and ancillary main crane hardstand area, 1,304m of new internal site service roads, underground electric cabling systems between Read more
19/05/2021 Munster
(full address available after signup)
The proposed development includes the provision of: 1. Up to 3 no. wind TURBINEs with a maximum overall ground to blade tip height of up to 176.5 metres along with the associated foundations and hard-standing areas, serviced/accessed via the existing Carrigarierk WIND FARM infrastructure, permitted under An Bord Pleanála Planning References 04.246353 and 301563-18 ( Cork County Council Planning References 15/730 and 17/431); 2. An operational life of the proposed development aligned with that of the existing Carrigarierk Read more
18/05/2021 Leinster
(full address available after signup)
the construction of a small-scale hydroelectric scheme on the Glencree River. The scheme is to include an intake channel comprising a Coanda screen with bypass notch and fish pass, penstock pipe 380m long and 560mm diameter, TURBINE house, tailrace discharge and all associated electrical and site works... Read more
17/05/2021 Leinster
(full address available after signup)
CONSTRUCTION OF ONE 4.2MW WIND TURBINE WITH AN OVERALL TIP HEIGHT OF UP TO 150M; CONSTRUCTION OF THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA; PROVISION OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE; CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE; AND, ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS... Read more
06/05/2021 Connaught
(full address available after signup)
for development consisting of a 20kV electrical grid connection from the consented Clooncon East Single Wind TURBINE Development (Pl. Ref. No. 13/1139 & 19/147) to to the existing 20kV ESB overhead line network at the townland of Stonetown, Glenamaddy, Co. Galway. The grid connection is c. 1.5 km long and will consist of c. 1,050m of overhead line, supported by wooden poles, and c. 450m of underground cable. The planning application is accompanied by an Appropriate Assessment Screening Report.... Read more
30/04/2021 Connaught
(full address available after signup)
Permission for: The construction of one 4.2 MW wind TURBINE with overall tip height of up to 150m; The construction of the wind TURBINE foundation, hard standing and assembly area; Provision of a site entrance and an access track within the site; Construction of an on-site 20kV substation and underground electrical cable; All associated site development and ancillary works (a Natura Impact Statement (NIS) has been submitted in respect of this application at the request of the Planning Authority) at ... Read more
30/04/2021 Leinster
(full address available after signup)
permission for 1. Demolition of existing domestic shed and replacement of the same shed with new domestic shed. 2. Installation of two domestic wind TURBINEs 3. Installation of three domestic solar panel turn tables and associated solar PV panels... Read more
27/04/2021 Munster
(full address available after signup)
alterations to previously permitted WIND FARM development (planning register refs 14/510138 and 15/600924 (Tipperary), 14/202, 15/629, 19/787 and 20/459 (Kilkenny) and 14/139, 19/597 and 20/386 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick in Co. Kilkenny and Graigueadrisly in Co. Laois - the proposed alterations will consist of realignment of underground electrical and communications cable previously consented in the aforementioned permissions (omission of approx. 743 m of the permitted route and replacement with approx. 572 m of underground electrical and communications cabling) and... Read more
27/04/2021 Ulster
(full address available after signup)
for a 10 year permission for the erection of a single wind TURBINE with a maximum height of up to 125 metres and all associated site development, access and reinstatement works; including TURBINE foundation, hardstanding area, site access track, 1 no. site entrance, electrical switchroom and underground electrical cabling. The proposed development will have a 30-year operational life from the date of commissioning of the wind TURBINE... Read more
19/04/2021 Munster
(full address available after signup)
for a ten-year planning permission for the construction of a renewable energy development, in the townlands of Glendine North, Fahanlunaghta More, Curraghodea, Letterkelly, Cloghaun More, Cloghaun Beg, Tooreen, Silverhill, Doonsallagh East, Shavavogh East and Knockalassa, Co Clare (approximately 6.5km to the east of Miltown malbay), The development will consist of the provision of the following I. Up to 8 no. wind TURBINEs with a maximum overall ground to blade tip height of up to 175 metres; ii. A thirty-year operational life from the date of full commissioning of the development and subsequent decommissioning. iii. A Meteorological mast with a m... Read more
08/04/2021 Leinster
(full address available after signup)
demolition of an existing shed and replacement of same shed with a new domestic shed. Installation of 2nr. wind TURBINEs and 3nr domestic solar turntables and associated solar PV panels. ... Read more
01/04/2021 Connaught
(full address available after signup)
development consisting of the construction of one wind TURBINE up to 5MW with overall tip height of up to 180m; Construct the wind TURBINE foundation, hard standing and assembly area; Provide a site entrance and an access track within the site; Construct an on-site 20kV substation and underground electrical cable; Install a 7.9km underground grid connection, which passes throught the following townlands: Rathbaun, Templehouse Demesne, Kilbrattan, Portinch, Emlaghnaghtan, Cartron (Percival), Cartron (Phibbs), Lecarrow, Carrowkeel, Cloonkeevy, Ballybrenna... Read more
29/03/2021 Connaught
(full address available after signup)
a ten-year planning permission and a thirty- year operational life, from the date of commissioning, for an additional four (4) wind TURBINEs to the nineteen (19) TURBINE Tullynamoyle windfarm (15 existing TURBINEs and 4 consented TURBINEs) in the townlands of Tullinloughan, Lackagh, Tullynamoyle and Gowlaun, County Leitrim. An underground grid connection to Corderry S... Read more
24/03/2021 Ulster
(full address available after signup)
Permission to consist of a minor amendment to the development permitted under Monaghan County Council Planning Register Reference 19/486 to revise the alignment of the permitted access track between wind TURBINEs T2 and T3. Significant further information received 30/07/2021.... Read more
22/03/2021 Munster
(full address available after signup)
An amendment to the development permitted pursuant to Cork County Council Planning Register Reference 09/4399 to increase the operational duration of the existing wind TURBINE and all associated ancillary infrastructure from 20 years to 30 years from the date of full commissioning of the wind TURBINE. ... Read more
16/02/2021 Ulster
(full address available after signup)
for development consisting of: The construction of one 5MW wind TURBINE with an overall tip height of up to 125m; The construction of the wind TURBINE foundation, hard standing and assembly area; Provision of a site entrance and an access track within the site; Construction of an on-site 20kV substation and underground electrical cable; and All associated site development and ancillary works... Read more
09/02/2021 Munster
(full address available after signup)
An amendment to the development permitted pursuant to Cork County Council Planning Register Reference 09/4399 to increase the operational duration of the existing wind TURBINE and all associated ancillary infrastructure from 20 years to 30 years from the date of full commissioning of the wind TURBINE. ... Read more
09/02/2021 Leinster
(full address available after signup)
A MODULAR BATTERY ENERGY STORAGE SYSTEM (BESS) FACILITY WITHIN THE FOOTPRINT OF A PREVIOUSLY CONSENTED CONSTRUCTION COMPOUND (ABP REF. PL19.PA0047). PLANNING PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS. THE FACILITY WILL CONSIST OF UP TO 28 NO. BATTERY STORAGE MODULES (UP TO 13M IN LENGTH, 3M IN WIDTH AND 3M IN HEIGHT) AND ANCILLARY EQUIPMENT INCLUDING UP TO: 28 NO. STEP-UP TRANSFORMERS, 28 NO. AIR-HANDLING UNITS AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS AND SERVICES, INCLUDING LIGHTNING PROTECTION MONOPOLES; COLUMN LIGHTING AND CCTV CAMERAS; INTERNAL ACCESS ROADS JOINING THE BESS FACILITY WITH THE CONSENTED CLONCREEN WIND FARM ROAD NETWOR... Read more
05/02/2021 Leinster
(full address available after signup)
THE CONSTRUCTION OF ONE WIND TURBINE WITH AN OVERALL HEIGHT OF UP TO 150M; THE CONSTRUCTION OF THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA; PROVISON OF A SITE ENTRANCE AND AN ACCESS TRACK WITH IN THE SITE; CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRIC CABLE; AND, ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE DEVELOPMENT WILL HAVE A TOTAL OUTPUT OF UP TO AND NOT GREATER THAN 5MW`S... Read more
03/02/2021 Leinster
(full address available after signup)
ROAD / JUNCTION ACCOMMODATION WORKS TO FACILITATE TURBINE DELIVERIES ASSOCIATED WITH A PROPOSED WIND FARM DEVELOPMENT IN CO. KILDARE. A CONCURRENT PLANNING APPLICATION IS BEING LODGED TO KILDARE COUNTY COUNCIL IN RELATION TO A 10 YEAR PLANNING PERMISSION FOR A WIND FARM DEVELOPMENT WHICH CONSISTS OF 5 NO. WIND TURBINES WITH A TIP HEIGHT OF UP TO 169M AND ALL ASSOCIATE... Read more
01/02/2021 Connaught
(full address available after signup)
a ten year planning permission and a thirty-operational life, from the date of commissioning , for an additional four (4) wind TURBINEs to the nineteen (19) TURBINE Tullynamoyle windfarm ( 15 existing TURBINEs and 4 consented TURBINEs) in the townlands of Tullinloughan, Lackagh, Tullynmoyle and Gowlaun, County Leitrim. An underground grid connection to Corderry Substa... Read more
01/02/2021 Connaught
(full address available after signup)
Development of infrastructure at Derrysallagh WIND FARM consisting of installation of a Storage Container and Site Office/Canteen Portacabin on a gravel area with concrete access paths and associated site works, adjacent to existing Substation and Compound. ... Read more
29/01/2021 Ulster
(full address available after signup)
DEVELOPMENT OF A NEW ROAD, 734M IN LENGTH TO FACILITATE DELIVERY OF WIND TURBINES... Read more
29/01/2021 Connaught
(full address available after signup)
the development will consist of : - the construction of one wind TURBINE with an overall tip height of up to 125 m- the construction of the wind TURBINE foundation, hard standing and assembly area. Provision of a site entrance and an access track within the site, construction of an on-site 20kV substation and underground electrical cable, installation of a 1.1 km underground grid connection, connecting into the existing ESB Spidle to Knock South 20 kV overhead line and - all associated site development and ancillary works. A Natura Impact Statement has ... Read more
27/01/2021 Leinster
(full address available after signup)
10 year permission for Construction of up to 5 No. wind TURBINEs with a maximum overall blade top height of 165m, with a transformer at each TURBINE and associated hard stand area; 1No. 38kV electrical substation and all associated infrastructure and works; 20kV underground cables facilitating the connection of TURBINEs to 38kV electrical substation and all associated infrastructure and works; Circa 6.5km of 38kV underground cabling and all associated works alo... Read more
26/01/2021 Leinster
(full address available after signup)
Permission for development consisting of alterations to a previously permitted WIND FARM development (Planning Register References: Carlow County Council 11/154; An Bord Pleanala PL 01.240245) The proposed alteration will consist of increasing the maximum TURBINE blade diameter of the permitted TURBINEs from 93m up to a maximum of 120m, while maintaining the overall tip height of the permitted development; increasing the size of crane hardstanding area at 4 ... Read more
22/01/2021 Leinster
(full address available after signup)
Permission to develop a WIND FARM and associated works . The proposed development will consist of: - Construction of up to 7 no. wind TURBINEs with a maximum overall blade tip height of up to 178m; - Construction of TURBINE foundations and crane pad hardstanding areas; - Construction of new site tracks and associated drainage infrastructure; - Upgrading of existing tracts and associated drainage infrastructure where necessary including upgrade of entrance onto... Read more
22/01/2021 Leinster
(full address available after signup)
ROAD/JUNCTION ACCOMODATION WORKS TO FACILITATE TURBINE DELIVERIES ASSOCIATED WITH A PROPOSED WIND FARM DEVELOPMENT IN CO. KILDARE. A CONCURRENT PLANNING APPLICATION IS BEING LODGED TO KILDARE COUNTY COUNCIL IN RELATION TO A 10 YEAR PLANNING PERMISSION FOR A WIND FARM DEVELOPMENT WHICH CONSISTS OF 5 NO. WIND TURBINES WITH A TIP HEIGHT OF UP TO 169M AND ALL ASSOCIATED F... Read more
22/01/2021 Leinster
(full address available after signup)
5 No. wind TURBINEs with a tip height of up to 169m and all associated foundations and hardstanding areas; 1 no. on-site electrical substation; 1 no. temporary construction compound; all associated underground electrical and communications cabling connecting the TURBINEs to the proposed on-site electrical substation; provision of new site access tracks and associated drainage; erection of 1 no. permanent meteorological mast of up to 100m in height; and all associated site development works, ancillary works and equipment. Permission is sought for a period... Read more
19/01/2021 Leinster
(full address available after signup)
10 year permission for Construction of up to 5 No. wind TURBINEs with a maximum overall blade top height of 165m, with a transformer at each TURBINE and associated hard stand area; 1No. 38kV electrical substation and all associated infrastructure and works; 20kV underground cables facilitating the connection of TURBINEs to 38kV electrical substation and all associated infrastructure and works; Circa 6.5km of 38kV underground cabling and all associated works alo... Read more
13/01/2021 Leinster
(full address available after signup)
Permission for development consisting of alterations to a previously permitted WIND FARM development (Planning Register References: Carlow County Council 11/154; An Bord Pleanala PL 01.240245) The proposed alteration will consist of increasing the maximum TURBINE blade diameter of the permitted TURBINEs from 93m up to a maximum of 120m, while maintaining the overall tip height of the permitted development; increasing the size of crane hardstanding area at 4 <... Read more
12/01/2021 Leinster
(full address available after signup)
THE CONTINUED USE OF A CONSENTED CONSTRUCTION COMPOUND (PL19.PA0047) AS A MODULAR BATTERY ENERGY STORAGE SYSTEM (BESS) FACILITY. PLANNING PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS. THE FACILITY WILL CONSIST OF: UP TO 28 NO. BATTERY STORAGE MODULES (UP TO 13M IN LENGTH, 3M IN WIDTH AND 3M IN HEIGHT) AND ANCILLARY EQUIPMENT INCLUDING UP TO: 28 NO. STEP-UP TRANSFORMERS, 28 NO. AIR HANDLING UNITS AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS AND SERVICES, INCLUDING LIGHTNING PROTECTION MONOPOLES; COLUMN LIGHTING AND CCTV CAMERAS; INTERNAL ACCESS ROADS JOINING THE BESS FACILITY WITH THE CONSENTED CLONCREEN WIND FARM ROAD NETWORK; SECURITY FENCING... Read more
08/01/2021 Munster
(full address available after signup)
EXTENSION OF DURATION of Planning file ref: 14/600108 for erection of a wind TURBINE with rotor diameter not exceeding 54m and a hub height not exceeding 60m ... Read more
04/01/2021 Leinster
(full address available after signup)
the erection of a new 15 metre tall domestic wind TURBINE and new 18 sq.m inverter shed, along with all associated site works ... Read more

We have set this post up so that the map and statistics will refresh every week. Bookmark the page so you can quickly return to see the growth of "wind farm" and "turbine" planning applications over time. If you feel that additional keywords could be included then please let us know


Did you know?

Businesses can sign up for PlanningAlerts.ie to get notified of any specific keywords that interest you. Taking this blog post as an example, if you want to be notified of any wind farm planning applications then this is straightforward to set up.

Sign up for a business account

Businesses can also request this data (along with an updated feed) in a format that suits them (Excel, RSS, email updates). Get in touch and let us know how you would like this data and any further refinements beyond "wind farm" and "turbine" that you require. Let us search all 31 planning registers on your behalf and we will inform you whenever a relevant planning application is submitted, updated, decided or commenced.

Contact Us


Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.