3km |
12/09/2024 |
N/A |
BELAUT NORTH , PETTIGO , DONEGAL PO |
RETENTION AND COMPLETION OF REAR ANNEX, THE LINKING AND CONVERSION OF THE EXISTING BARN TO ACCOMMODATION, THE INSTALLATION OF PACKAGE TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS AND PERMISSION FOR RENOVATION OF THE EXISTING DERELICT DWELLING... login required. |
Details... |
1.1km |
29/08/2024 |
CONDITIONAL |
KIMMID , PETTIGO , CO. DONEGAL |
CONSTRUCTION OF PORTAL FRAMED CATTLE SHED, SLURRY STORAGE TANK, CONCRETE APRON AND ALL ASSOCIATED SITE WORKS
... login required. |
Details... |
670m |
09/07/2024 |
UNCONDITIONAL |
DRUMHARRIFF TD , PETTIGO , DONEGAL PO |
ERECTION OF A DWELLING HOUSE WITH EFFLUENT TREATMENT SYSTEM AND POLISHING FILTER ... login required. |
Details... |
3km |
24/04/2024 |
REFUSED |
BELAULT NORTH , PETTIGO , CO DONEGAL |
(1) RENOVATION OF EXISTING DERELICT DWELLING, (2) RETENTION AND COMPLETION OF REAR ANNEX AND THE LINKING AND CONVERSION OF EXISTING BARN TO ACCOMMODATION AND (3) INSTALLATION OF PACKAGE TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.4km |
21/12/2023 |
CONDITIONAL |
PETTIGO , DRUMHARRIFF , DONEGAL PO |
(1) INSTALLATION OF AN INTEGRATED CONSTRUCTED WETLAND (ICW) TYPE WASTEWATER TREATMENT PLANT (WWTP) FOR THE TREATMENT OF WASTEWATER FROM THE PETTIGO AGGLOMERATION COMPRISING OF A SEPTIC TANK AND ICW PONDS, (2) CONSTRUCTION OF (A) NEW ACCESS ROA... login required. |
Details... |
1.1km |
29/11/2023 |
CONDITIONAL |
MAIN STREET , PETTIGO , DONEGAL |
(1) DEMOLITION OF DERELICT DWELLINGS AND COMMERCIAL STORES, (2) RENOVATION OF COMMERCIAL UNIT, (3) CHANGE OF USE FROM BUTCHERY TO 1 NO. APARTMENT, (4) CONVERSION OF COMMERCIAL BUILDING TO 5 NO. ADDITIONAL APARTMENTS AND PERMISSION FOR (1) CONVERSION OF EXISTING DERELICT STONE FACED BUIL... login required. |
Details... |
2.6km |
06/11/2023 |
CONDITIONAL |
FINCASHEL , PETTIGO , DONEGAL PO |
CONSTRUCTION OF A FOUR BY TWO BAY SHEEP SHED, STORAGE TANK BELOW, SOAKAWAY AND HANDLING PEN INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.1km |
25/09/2023 |
CONDITIONAL |
STATION ROAD , PETTIGO , DONEGAL PO |
EXTENSION OF THE EXISTING CAR PARK AND CIRCULATION ROAD TO PROVIDE OVERNIGHT MOTORHOME PARKING AND HOOKUP POINTS, WHICH WILL INCLUDE ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
22/06/2023 |
CONDITIONAL |
BELAULT NORTH , PETTIGO , DONEGAL PO |
DEMOLITION OF EXISTING DWELLING HOUSE AND DOMESTIC GARAGE, RECONSTRUCTION OF A DWELLING AND GARAGE, AND RECONNECTION OF ALL SERVICES TO INCLUDE ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
13/06/2023 |
CONDITIONAL |
CARN LOWER , PETTIGO , DONEGAL PO |
CONSTRUCTION OF A PORTAL FRAMED DRY FEED STORAGE SHED AND CONCRETE APRON, INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
19/04/2023 |
N/A |
CARN LOWER , PETTIGO , DONEGAL PO |
CONSTRUCTION OF A NEW PORTAL FRAMED DRY STORAGE SHED AND EXTERNAL CONCRETE APRON, INCLUDING ALL ASSOCIATED SITE AND DRAINAGE WORKS... login required. |
Details... |
1.1km |
20/02/2023 |
N/A |
MAIN STREET , PETTIGO , DONEGAL PO |
(1) DEMOLITION OF DERELICT DWELLINGS AND COMMERCIAL STORES, (2) RENOVATION OF COMMERCIAL UNIT, (3) CHANGE OF USE FROM BUTCHERY TO 1 APARTMENT AND (4) CONVERSION OF COMMERCIAL BUILDING TO 5 ADDITIONAL APARTMENTS AND PERMISSION FOR (1) CONVERSION OF EXISTING DERELICT STONE FACED ... login required. |
Details... |
1.4km |
05/12/2022 |
CONDITIONAL |
PETTIGO MILL , PETTIGO , DONEGAL PO |
(1) DEMOLITION OF EXISTING EXTENSION AND (2) ALTERATIONS TO THE MILL WORKERS COTTAGE (RPS NO. 40850002 REFERS), RAISED VALLEY AND NEW ROOFLIGHTS TO THE CORN MILL ROOF AND NEW ROOFLIGHTS TO THE SAW MILL ROOF (RPS NO. 40850001 REFERS)... login required. |
Details... |
2.9km |
04/10/2022 |
CONDITIONAL |
DRUMCHRIN , PETTIGO , DONEGAL PO |
ERECTION OF A DWELLING HOUSE AND CONNECTION TO EXISTING SECONDARY AND TERTIARY EFFLUENT TREATMENT SYSTEM AS GRANTED UNDER 20/50219... login required. |
Details... |
1.4km |
03/08/2022 |
CONDITIONAL |
FINCASHEL , PETTIGO , DONEGAL PO |
(1) INTENSIFICATION OF THE EXISTING COMPOSTING AND WASTE RECOVERY ACTIVITIES FROM AN ANNUAL TONNAGE OF 25,000 TONNES TO 150,000 TONNES, (2) UPGRADING OF THE EXISTING SURFACE WATER DRAINAGE INFRASTRUCTURE, AN UPGRADED ON-SITE WASTEWATER TREATMENT SYSTEM (OSWTS) WITH SOIL... login required. |
Details... |
1.1km |
21/06/2022 |
CONDITIONAL |
MILL STREET , PETTIGO , DONEGAL PO |
CONSTRUCTION OF A TWO BAY SLATTED SHED, THE OVER ROOFING OF EXISTING CATTLE PEN AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.1km |
24/01/2022 |
N/A |
MAIN STREET/STATION STREET , PETTIGO , DONEGAL PO |
DEMOLITION OF DERELICT DWELLINGS & COMMERCIAL STORES AND PERMISSION FOR (1) CHANGE OF USE OF COMMERCIAL UNIT TO BAKERY (2) CHANGE OF USE OF BUTCHERY TO 1 APARTMENT AND TOWNHOUSE OVER (3) ERECTION OF TWO APARTMENTS OVE... login required. |
Details... |
1.1km |
21/12/2021 |
N/A |
MAIN STREET/STATION STREET , PETTIGO , DONEGAL PO |
DEMOLITION OF DERELICT DWELLINGS AND COMMERCIAL STORES AND PERMISSION FOR (1) CHANGE OF USE OF COMMERCIAL UNIT TO BAKERY (2) CHANGE OF USE OF BUTCHERY TO 1 APARTMENT AND TOWNHOUSE OVER (3) ERECTION OF TWO APARTMENTS OV... login required. |
Details... |
950m |
04/08/2021 |
CONDITIONAL |
DRUMGUN , PETTIGO , CO. DONEGAL |
CONSTRUCTION OF A PORTAL FRAMED SHEEP SHED, WITH STORAGE TANK BELOW, CONCRETE APRON TO INCLUDE ALL ASSOCIATED SITE WORKS... login required. |
Details... |