2.5km |
15/11/2024 |
N/A |
Ballysumaghan , Ballintogher , Co. Sligo |
Planning Permission to (a) retain rear extension to existing dwelling house (b) elevation changes to existing dwelling house (c) revision of site boundaries to that previously granted planning permission under reference number PL 2... login required. |
Details... |
2.9km |
14/11/2024 |
N/A |
Markree Castle , Collooney , Co. Sligo |
Construct a“lean-to” single storey extension (119 Msq) to sides and rear of existing shed at Markree Castle, Collooney, Co Sligo. Markree Castle is a protected structure, RPS No.294CDP.... login required. |
Details... |
2.6km |
14/11/2024 |
N/A |
CLOONEENROE , COLLOONEY , SLIGO |
PROPOSED NEW DWELLING HOUSE AND SEPTIC TANK WITH ALL ANCILLARY SITE WORKS
MAX HEIGHT OF HOUSE 5.3M... login required. |
Details... |
2.6km |
24/10/2024 |
N/A |
Ballygrania , Collooney , Co. Sligo |
PLANNING PERMISSION SOUGHT FOR PROPOSED NEW DWELLING HOUSE AND SEPTIC TANK WITH ALL ANCILLARY SITE WORKS... login required. |
Details... |
520m |
23/10/2024 |
N/A |
Doonally , Ballygawley , co. Sligo |
1. To retain the demolition of an existing habitable domestic dwelling.
2. To complete the reconstruction of a domestic dwelling all ancillary works.... login required. |
Details... |
2.7km |
22/10/2024 |
N/A |
Carrownagh , Ballintogher , Sligo |
Construction of a dwelling house, entrance, domestic garage, wastewater treatment system and distribution area together with all ancillary site works and services at the above address... login required. |
Details... |
1.8km |
24/09/2024 |
CONDITIONAL |
Dowrea , Ballygawley , Collooney |
(1) demolish the existing side extension and porch
(2) extend and renovate a side extension and porch
(3) replace the existing roof with a new roof and
convert the attic to living accommodation for an
existing dwelling house... login required. |
Details... |
2.8km |
16/07/2024 |
CONDITIONAL |
Cartronhugh , Ballintogher , Co. SLigo |
1. TO CONSTRUCT A TWO-STOREY/ONE-STOREY DOMESTIC DWELLING.
2. TO CONSTRUCT A DOMESTIC GARAGE.
3. TO CONSTRUCT A NEW SITE ENTRANCE.
4. TO CONSTRUCT A WASTEWATER TREATMENT SYSTEM TO EPA CODE OF PRACTICE AND
ALL ANCILLARY WORKS.... login required. |
Details... |
1.1km |
14/07/2024 |
CONDITIONAL |
Lurgan , Ballintogher , Co. Sligo |
Permission to construct new detached dwelling house with onsite wastewater treatment system, detached domestic garage, connection to public services and all associated site works at Lurgan, Ballintogher, Co. Sligo.... login required. |
Details... |
2.3km |
23/03/2024 |
CONDITIONAL |
Srananagh , Sooey , Sligo |
Construct a Two-Storey Extension to the front of the House consisting of an Entry Vestibule on the Ground Floor and a small Storage Area on the First Floor adding a Total of 7 sq. Metres Internal Floor Area to the existing Dwelling... login required. |
Details... |
2.1km |
12/03/2024 |
CONDITIONAL |
Drum House , Drumederalena Ballygawley , Collooney |
Construction of a single storey domestic garage and all associated site works... login required. |
Details... |
2.1km |
26/02/2024 |
N/A |
Drum House , Drumederalena Ballygawley , Collooney |
Construction of a single storey garage and all associated site works... login required. |
Details... |
2.8km |
19/01/2024 |
CONDITIONAL |
Markree Castle , Collooney , Co Sligo |
Retain existing storage shed and install biomass fueled heating system consisting of, 6 metre diameter woodchip storage tank, new boiler and water storage tank to be located in exist... login required. |
Details... |
1.2km |
11/10/2023 |
CONDITIONAL |
Rosewood Cottage , Tullybeg , Ballygawley County Sligo |
the construction of a new wastewater treatment system and associated percolation area and all ancillary site works... login required. |
Details... |
2km |
07/09/2023 |
CONDITIONAL |
Sooey Td. , Sooey , County Sligo |
(a) retain the location of dwelling house, domestic garage and driveway on an enlarged site which differs from previous grant of planning permission ref. PL 03/618, (b) retain c... login required. |
Details... |
2.5km |
17/08/2023 |
CONDITIONAL |
Townland of Ballysumaghan Fannybrook , Quarry Lane Co. Sligo , Ireland |
A 10 year planning permission for the construction of a: 1. enclosed battery energy storage system compound on a total of up to c. 5.05 hectare site, to include:
• 150 battery units set inside storage blocks on concrete support structures containing Heating, ventilation and air conditioning unit (HVAC units);
• Transformer and inverter units on concrete support structures;
• 1 no. two storey customer 220kV Gas Insulated Substation (GIS) (See Drawing 23553-201 and 23552-202);
• 1No. Customer Control Building and 220kV Transformer with associated Switchgear;
• 3No. Containing Back-up Generators, Auxiliary Transformers, Switchgear containers, LV and Control Containers;
• 1No. Lightning Pole;
• 2No. Firewater reservoir ponds with Pumping station and 1No. detention basin with associated drainage systems (as per Drawing 23553-102);
• Security gates, 2.6m pa... login required. |
Details... |
2.3km |
15/08/2023 |
CONDITIONAL |
Ballygrania , Collooney , Co. Sligo |
construction of a new dwelling house, domestic garage, sewage treatment system, percolation area and all associated site works and services ... login required. |
Details... |
2.1km |
14/04/2023 |
CONDITIONAL |
Drum House , Drumederalena Ballygawley , Collooney |
Demolition of existing garage/store, Construction of a single storey extension to the side of the existing dwelling, alterations to existing porch and all associated site works... login required. |
Details... |
2.2km |
14/04/2023 |
CONDITIONAL |
Drum Lodge , Drumederalena Ballygawley , Collooney |
alterations to the existing dwelling including new windows, cladding, removal of chimney stacks and all associated site works... login required. |
Details... |
2.6km |
09/11/2022 |
N/A |
Townland of Ballysumaghan , Fannybrook , Quarry Lane |
development consisting of the development of a battery energy storage system. The development will consist of a 10 year planning permission for the construction of a: (1) enclosed battery energy storage system compound on a total of up to c. 1.7 hectare site, to include: 1 no. single storey customer substation and 1 no. TSO substation (c. 182m2), control and switch rooms, up to 174 battery units set inside storage blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units), transfo... login required. |
Details... |