0m |
26/02/2024 |
N/A |
Drum House , Drumederalena Ballygawley , Collooney |
Construction of a single storey garage and all associated site works... login required. |
Details... |
2.8km |
19/01/2024 |
CONDITIONAL |
Markree Castle , Collooney , Co Sligo |
Retain existing storage shed and install biomass fueled heating system consisting of, 6 metre diameter woodchip storage tank, new boiler and water storage tank to be located in exist... login required. |
Details... |
2.4km |
04/10/2023 |
CONDITIONAL |
Coolbock Td. , Riverstown , Co. Sligo. |
construct a dwelling house, domestic garage, install an effluent treatment unit with soil polishing filter, upgrade existing field entrance for domestic use entrance and carry out ancillary site works... login required. |
Details... |
730m |
07/09/2023 |
CONDITIONAL |
Sooey Td. , Sooey , County Sligo |
(a) retain the location of dwelling house, domestic garage and driveway on an enlarged site which differs from previous grant of planning permission ref. PL 03/618, (b) retain c... login required. |
Details... |
2.4km |
29/06/2023 |
CONDITIONAL |
Lisconny , Drumfin , Co. Sligo |
construction of A bungalow type dwelling house, detached garage, entrance, boundary fence/wall, onsite suitable treatment system with polishing filter and all ancillary site works... login required. |
Details... |
10m |
14/04/2023 |
CONDITIONAL |
Drum House , Drumederalena Ballygawley , Collooney |
Demolition of existing garage/store, Construction of a single storey extension to the side of the existing dwelling, alterations to existing porch and all associated site works... login required. |
Details... |
90m |
14/04/2023 |
CONDITIONAL |
Drum Lodge , Drumederalena Ballygawley , Collooney |
alterations to the existing dwelling including new windows, cladding, removal of chimney stacks and all associated site works... login required. |
Details... |
2.8km |
26/10/2022 |
CONDITIONAL |
Ballysumaghan , Co. Sligo |
development consisting of: The 10 year permission for the construction and operation of a synchronous condenser facility. The facility will be a fenced compound ca. 1.196ha in size. The development will have a 30 year operational lifetime and will consist of a synchronous condenser, which will include the following elements: generator and flywheel building (ca. 600 sq.m., ca. 12.5m high) to house the equipment including the generator, flywheel, lube oil skid, vacumn skid, TEWAC pump skid, reverse switch cubicle and star point cubicle; SFC start-up equipment room (ca. 43.650 sq.m., ca. 4.20m high); AC/DC room (ca. 81.480 sq.m., ca. 4.20m high); C&P room (ca. 70.685 sq.m., ca. 4.20m high); battery room (ca. 28.130 sq.m., ca. 4.20m high); storage room (ca. 49.200 sq.m., ca. 4.20m high); supporting components of plant within the compound th... login required. |
Details... |
2.9km |
30/09/2022 |
CONDITIONAL |
Doorly , Collooney , County Sligo |
development consisting of construction of a new dwelling house, new garage, effluent treatment system, percolation area, formation of a new site entrance and all associated site works... login required. |
Details... |
1.7km |
11/07/2022 |
N/A |
Knockrawer , Collooney , Co. Sligo |
development consisting of the following: to construct a storey and a half extension to the side and rear of the existing dwelling. Construct and install a new PET system with associ... login required. |
Details... |
2.2km |
15/03/2022 |
CONDITIONAL |
Lisbanagher , Riverstown , Co. Sligo |
development consisting of construction of a two storey detached dwelling house and install a waster water treatment system with associated percolation area. The application is accompanied by a Natura Impact Statement... login required. |
Details... |
2.1km |
28/01/2022 |
CONDITIONAL |
Doonally , Ballygawley , Co. Sligo |
Development consisting of the carrying out of alteration works to dwelling house. The works will include the following: The conversion of existing storage sheds with a floor area of 36 sq. metres to residential usage. The construction of an extension of approx. 64 sq. metres that will connect the... login required. |
Details... |
2.7km |
16/09/2021 |
CONDITIONAL |
Ballysumaghan , Ballintogher , Co Sligo |
Development consisting of upgrading treatment system at existing house by installing new waste water treatment system and Ter 3 Packaged Tertiary unit
... login required. |
Details... |
1.8km |
12/07/2021 |
REFUSED |
Knockrawer , Collooney , Co Sligo |
Development consisting of construction of a two storey dwelling house, on-site PET system with tertiary treatment modules and carrying out of all associated site development works deemed necessary
... login required. |
Details... |
2.7km |
23/06/2021 |
CONDITIONAL |
Clooskirt , Sooey , Co. Sligo |
Development consisting of the following, To retain and complete an existing Agricultural entrance... login required. |
Details... |
2.1km |
06/05/2021 |
CONDITIONAL |
Doonally , Ballygawley , Co. Sligo |
Development consisting of the retention of two number existing domestic garages and all associated ancillary works.... login required. |
Details... |
2.3km |
06/04/2021 |
CONDITIONAL |
Doonally , Ballygawley , Co. Sligo |
development consisting of the proposed alterations to existing dwelling and rear extension to provide additional living accommodation, associated site works including demolition of 2 no. outbuildings and realignment of existing driveway, gates and pillars... login required. |
Details... |
2.8km |
01/04/2021 |
CONDITIONAL |
Clooskirt Td , Co. Sligo |
development consisting of the retention of an extension as constructed on the side of dwelling house which differs from that previoulsy granted under PL84/13138. Retain revised application site boundaries which differs from that previously granted... login required. |
Details... |
2.9km |
23/03/2021 |
CONDITIONAL |
Lackagh , Drumfin , County Sligo |
development consisting of the construction of a new dwelling house, new garage, effluent treatment system, percolation area, formation of a new site entrance and all associated site works
... login required. |
Details... |