2.5km |
04/10/2024 |
N/A |
Lisconny , Drumfin , Co. Sligo |
Retention of sunroom as constructed... login required. |
Details... |
2.3km |
14/07/2024 |
CONDITIONAL |
Lurgan , Ballintogher , Co. Sligo |
Permission to construct new detached dwelling house with onsite wastewater treatment system, detached domestic garage, connection to public services and all associated site works at Lurgan, Ballintogher, Co. Sligo.... login required. |
Details... |
2.3km |
23/03/2024 |
CONDITIONAL |
Srananagh , Sooey , Sligo |
Construct a Two-Storey Extension to the front of the House consisting of an Entry Vestibule on the Ground Floor and a small Storage Area on the First Floor adding a Total of 7 sq. Metres Internal Floor Area to the existing Dwelling... login required. |
Details... |
620m |
12/03/2024 |
CONDITIONAL |
Drum House , Drumederalena Ballygawley , Collooney |
Construction of a single storey domestic garage and all associated site works... login required. |
Details... |
620m |
26/02/2024 |
N/A |
Drum House , Drumederalena Ballygawley , Collooney |
Construction of a single storey garage and all associated site works... login required. |
Details... |
2.2km |
19/01/2024 |
CONDITIONAL |
Markree Castle , Collooney , Co Sligo |
Retain existing storage shed and install biomass fueled heating system consisting of, 6 metre diameter woodchip storage tank, new boiler and water storage tank to be located in exist... login required. |
Details... |
2.8km |
04/10/2023 |
CONDITIONAL |
Coolbock Td. , Riverstown , Co. Sligo. |
construct a dwelling house, domestic garage, install an effluent treatment unit with soil polishing filter, upgrade existing field entrance for domestic use entrance and carry out ancillary site works... login required. |
Details... |
1.2km |
07/09/2023 |
CONDITIONAL |
Sooey Td. , Sooey , County Sligo |
(a) retain the location of dwelling house, domestic garage and driveway on an enlarged site which differs from previous grant of planning permission ref. PL 03/618, (b) retain c... login required. |
Details... |
2.8km |
15/08/2023 |
CONDITIONAL |
Ballygrania , Collooney , Co. Sligo |
construction of a new dwelling house, domestic garage, sewage treatment system, percolation area and all associated site works and services ... login required. |
Details... |
2.3km |
29/06/2023 |
CONDITIONAL |
Lisconny , Drumfin , Co. Sligo |
construction of A bungalow type dwelling house, detached garage, entrance, boundary fence/wall, onsite suitable treatment system with polishing filter and all ancillary site works... login required. |
Details... |
560m |
14/04/2023 |
CONDITIONAL |
Drum Lodge , Drumederalena Ballygawley , Collooney |
alterations to the existing dwelling including new windows, cladding, removal of chimney stacks and all associated site works... login required. |
Details... |
620m |
14/04/2023 |
CONDITIONAL |
Drum House , Drumederalena Ballygawley , Collooney |
Demolition of existing garage/store, Construction of a single storey extension to the side of the existing dwelling, alterations to existing porch and all associated site works... login required. |
Details... |
2.9km |
26/10/2022 |
CONDITIONAL |
Ballysumaghan , Co. Sligo |
development consisting of: The 10 year permission for the construction and operation of a synchronous condenser facility. The facility will be a fenced compound ca. 1.196ha in size. The development will have a 30 year operational lifetime and will consist of a synchronous condenser, which will include the following elements: generator and flywheel building (ca. 600 sq.m., ca. 12.5m high) to house the equipment including the generator, flywheel, lube oil skid, vacumn skid, TEWAC pump skid, reverse switch cubicle and star point cubicle; SFC start-up equipment room (ca. 43.650 sq.m., ca. 4.20m high); AC/DC room (ca. 81.480 sq.m., ca. 4.20m high); C&P room (ca. 70.685 sq.m., ca. 4.20m high); battery room (ca. 28.130 sq.m., ca. 4.20m high); storage room (ca. 49.200 sq.m., ca. 4.20m high); supporting components of plant within the compound th... login required. |
Details... |
2.8km |
30/09/2022 |
CONDITIONAL |
Doorly , Collooney , County Sligo |
development consisting of construction of a new dwelling house, new garage, effluent treatment system, percolation area, formation of a new site entrance and all associated site works... login required. |
Details... |
2.9km |
29/07/2022 |
CONDITIONAL |
Ballygrania , Collooney , Co. Sligo |
development consisting of the construction of a new detached dwelling house with onsite wastewater treatment system, detached domestic garage, connection to public services and all associated site works... login required. |
Details... |
1.2km |
11/07/2022 |
N/A |
Knockrawer , Collooney , Co. Sligo |
development consisting of the following: to construct a storey and a half extension to the side and rear of the existing dwelling. Construct and install a new PET system with associ... login required. |
Details... |
2.8km |
22/03/2022 |
CONDITIONAL |
Ballygrania , Collooney , Co. Sligo |
development consisting of the following: to retain renovations and extensions to dwelling house as constructed and for permission to renovate and construct first floor extensions to detached dwelling house... login required. |
Details... |
2.7km |
15/03/2022 |
CONDITIONAL |
Lisbanagher , Riverstown , Co. Sligo |
development consisting of construction of a two storey detached dwelling house and install a waster water treatment system with associated percolation area. The application is accompanied by a Natura Impact Statement... login required. |
Details... |
1.8km |
28/01/2022 |
CONDITIONAL |
Doonally , Ballygawley , Co. Sligo |
Development consisting of the carrying out of alteration works to dwelling house. The works will include the following: The conversion of existing storage sheds with a floor area of 36 sq. metres to residential usage. The construction of an extension of approx. 64 sq. metres that will connect the... login required. |
Details... |