1.4km |
02/09/2024 |
N/A |
Cloonbarry , Aclare , Co Sligo |
1. The demolition of an existing derelict shed. 2. The construction of a car garage with storage area. 3. And all ancillary site works at this site... login required. |
Details... |
1.4km |
29/08/2024 |
N/A |
Cloonbarry , Aclare , Co Sligo |
permission for,
1. The demolition of an existing derelict shed.
2. The construction of a car garage with storage area.
3. And all ancillary site works at this site,... login required. |
Details... |
1.4km |
30/07/2024 |
N/A |
Knockahoney , Aclare , Co. Sligo |
to construct (1) a 340 sq.m slatted cattle shed with cattle handling crush, (2) 291 cubic meter capacity slurry storage tank under shed (3) Concrete apron slab around the shed (4) A 4m wide access road (5) A 268 sq.m round silage bale storage area along with associated site works... login required. |
Details... |
2km |
30/01/2024 |
CONDITIONAL |
Cloonbarry , Aclare , Co Sligo |
the demolition of existing dwelling and construction of new dwelling complete with on-site foul effluent treatment system, driveway, landscaping and all other associated site works ... login required. |
Details... |
800m |
21/01/2024 |
CONDITIONAL |
Drummartin , Aclare , Co. Sligo |
1.The renovation and extension of the existing Ox Mountain Heritage
Centre and Joe Dan's Public House to create a single facility. This will
include a restaurant, bar, kitchen, toilet faci... login required. |
Details... |
2.7km |
19/01/2024 |
CONDITIONAL |
Gortermone , Tourlestrane , Co. Sligo |
a new 282m2 dwelling and a 55m2 garage, dwelling consisting of 4 bedrooms, 2 en-suite, a walk in wardrobe, plant room, play room, sitting room, open space living, dining and ... login required. |
Details... |
2.5km |
20/12/2023 |
CONDITIONAL |
Gortermone , Tourlestrane , Ballymote Co. Sligo. |
extension & alterations to existing dwelling house, upgrade the existing wastewater treatment system and to carry out all ancillary site works... login required. |
Details... |
2.4km |
19/07/2023 |
CONDITIONAL |
Gortermone , Tourlestrane , Co Sligo |
the construction of a new wastewater treatment system and associated percolation area the formation of a new site entrance, new site boundaries, and all ancillary site works... login required. |
Details... |
2km |
07/06/2023 |
CONDITIONAL |
Gortersluin , Aclare , Co. Sligo |
to refurbish an existing derelict dwelling and construct a 37 sq.m extension to the West of the dwelling along with installation of a new effluent treatment system with soil percolation area and associated site works... login required. |
Details... |
2.6km |
28/04/2023 |
CONDITIONAL |
sessuegarry , cloonacool , Co. Sligo |
A renovation and extension project to involve the following:
• Demolition of existing extensions.
• Energy upgrades
• Extension to the rear of the building to extend the kitchen/living area
• Domestic waste water treatment system... login required. |
Details... |
2.5km |
12/04/2023 |
CONDITIONAL |
Glenavoo , Aclare , Co. Sligo |
development consisting of construction of a new dwelling house, waster water treatment system and all associated site works... login required. |
Details... |
2.9km |
30/11/2022 |
CONDITIONAL |
High Road , Corray Td. , Aclare |
Retention permission for the revised location of dwelling house and domestic garage to that as previously granted permission under ref PL21/124 at The High Road, Corrary Td., Aclare Co Sligo... login required. |
Details... |
2.9km |
08/07/2022 |
CONDITIONAL |
Glenavoo , Aclare , Co. Sligo |
development consisting of construction of a dwelling house and domestic garage with proprietary effluent treatment system and for all associated site works... login required. |
Details... |
720m |
28/06/2022 |
CONDITIONAL |
Cloonydiveen , Aclare , Co Sligo |
development consisting of change of house type from that as previously granted under PL21/250... login required. |
Details... |
2.6km |
07/10/2021 |
N/A |
Glenavoo , Aclare , Co. Sligo |
development consisting of the construction of a new dwelling house, garage, wastewater treatment system and all associated site works... login required. |
Details... |
2.6km |
06/09/2021 |
N/A |
Glenavoo , Aclare , Co Sligo |
Development consisting of construction of a new dwelling house, garage, waste water treatment system and all associated site works
... login required. |
Details... |
1.2km |
04/08/2021 |
CONDITIONAL |
Castlerock , Aclare , Co Sligo |
Development consisting of; (a) demolition of existing dwelling house and outbuildings on site, (b) construction of a dwelling house with attached garage, proprietary effluent treatment unit and soil polishing filter on site together with all ancillary site works and services
... login required. |
Details... |
720m |
28/06/2021 |
CONDITIONAL |
Cloonydiveen , Aclare , Co. Sligo |
Development consisting of construction of a proposed dwelling house, garage, septic tank system and percolation area, complete with all associated works... login required. |
Details... |
2.9km |
09/04/2021 |
CONDITIONAL |
The High Road , Corray Td. , Aclare |
development consisting of the changes to previously granted permission ref; PL17/198. The changes carried out are the following; (1) increase in ridge h... login required. |
Details... |