1.4km |
11/09/2024 |
N/A |
Drumartin , Tourlestrane , Sligo |
The development will consist of proposed dwelling house, garage, proprietary effluent treat-ment system and polishing filter, including hard and soft landscaping and all associated site works.... login required. |
Details... |
1.7km |
02/09/2024 |
N/A |
Cloonbarry , Aclare , Co Sligo |
1. The demolition of an existing derelict shed. 2. The construction of a car garage with storage area. 3. And all ancillary site works at this site... login required. |
Details... |
1.7km |
29/08/2024 |
N/A |
Cloonbarry , Aclare , Co Sligo |
permission for,
1. The demolition of an existing derelict shed.
2. The construction of a car garage with storage area.
3. And all ancillary site works at this site,... login required. |
Details... |
2.8km |
24/07/2024 |
CONDITIONAL |
Carns , Aclare , Co. Sligo |
change of house design from that previously granted planning permission under planning reference PL22/205 with all associated site works... login required. |
Details... |
1.8km |
30/01/2024 |
CONDITIONAL |
Cloonbarry , Aclare , Co Sligo |
the demolition of existing dwelling and construction of new dwelling complete with on-site foul effluent treatment system, driveway, landscaping and all other associated site works ... login required. |
Details... |
1.9km |
21/01/2024 |
CONDITIONAL |
Drummartin , Aclare , Co. Sligo |
1.The renovation and extension of the existing Ox Mountain Heritage
Centre and Joe Dan's Public House to create a single facility. This will
include a restaurant, bar, kitchen, toilet faci... login required. |
Details... |
2.1km |
19/01/2024 |
CONDITIONAL |
Gortermone , Tourlestrane , Co. Sligo |
a new 282m2 dwelling and a 55m2 garage, dwelling consisting of 4 bedrooms, 2 en-suite, a walk in wardrobe, plant room, play room, sitting room, open space living, dining and ... login required. |
Details... |
2km |
20/12/2023 |
CONDITIONAL |
Gortermone , Tourlestrane , Ballymote Co. Sligo. |
extension & alterations to existing dwelling house, upgrade the existing wastewater treatment system and to carry out all ancillary site works... login required. |
Details... |
3km |
15/12/2023 |
N/A |
Garda Station , Lislea , Aclare |
development consisting of the following: change of use to a residential dwelling, to include a small extension to the rear of the property with a floor area of 2.48 sq.m.... login required. |
Details... |
1.3km |
19/07/2023 |
CONDITIONAL |
Gortermone , Tourlestrane , Co Sligo |
the construction of a new wastewater treatment system and associated percolation area the formation of a new site entrance, new site boundaries, and all ancillary site works... login required. |
Details... |
1.7km |
30/11/2022 |
CONDITIONAL |
High Road , Corray Td. , Aclare |
Retention permission for the revised location of dwelling house and domestic garage to that as previously granted permission under ref PL21/124 at The High Road, Corrary Td., Aclare Co Sligo... login required. |
Details... |
2.1km |
18/11/2022 |
CONDITIONAL |
Curraghboy , Tourlestrane , Co. Sligo |
development consisting of permission and permission for retention of alterations and extension to existing dwelling house and for existing storage shed along with ancillary works... login required. |
Details... |
1.2km |
28/06/2022 |
CONDITIONAL |
Cloonydiveen , Aclare , Co Sligo |
development consisting of change of house type from that as previously granted under PL21/250... login required. |
Details... |
2.8km |
13/06/2022 |
CONDITIONAL |
Carns , Aclare , Co. Sligo |
development consisting of the construction of a new dwelling house complete with access onto public road, domestic garage, on-site sewage treatment system associated percolation area, hard and soft landscaping and all other associated site works... login required. |
Details... |
2.8km |
21/02/2022 |
N/A |
Carns , Aclare , Co Sligo |
Development consisting of the construction of a new dwelling house complete with access onto public road, domestic garage, on-site sewage treatment system, associated percolation area, hard and soft landscaping all other associated site works... login required. |
Details... |
2.7km |
14/01/2022 |
CONDITIONAL |
Lislea , Aclare , Ballymote |
Development consisting of the proposed erection of an On-Farm Horticulture Building (consisting of Production Area, Cold Storage Area, Storage and Preparation Area, Laboratory, Kitchen Servery and farm Office/meetin... login required. |
Details... |
2.7km |
24/09/2021 |
N/A |
Lislea , Aclare , Ballymote |
Development consisting of the proposed erection of an On-Farm Horticulture Building (consisting of Production Area, Cold Storage Area, Storage and Preparation Area, Laboratory, K... login required. |
Details... |
2.6km |
04/08/2021 |
CONDITIONAL |
Castlerock , Aclare , Co Sligo |
Development consisting of; (a) demolition of existing dwelling house and outbuildings on site, (b) construction of a dwelling house with attached garage, proprietary effluent treatment unit and soil polishing filter on site together with all ancillary site works and services
... login required. |
Details... |
1.2km |
28/06/2021 |
CONDITIONAL |
Cloonydiveen , Aclare , Co. Sligo |
Development consisting of construction of a proposed dwelling house, garage, septic tank system and percolation area, complete with all associated works... login required. |
Details... |