1.7km |
30/01/2024 |
N/A |
Cloonbarry , Aclare , Co Sligo |
Permission for the demolition of existing dwelling and construction of new dwelling complete with on-site foul effluent treatment system, driveway, landscaping and all other associated site works ... login required. |
Details... |
1.7km |
21/01/2024 |
N/A |
Drummartin , Aclare , Co. Sligo |
1.The renovation and extension of the existing Ox Mountain Heritage
Centre and Joe Dan's Public House to create a single facility. This will
include a restaurant, bar, kitchen, toilet faci... login required. |
Details... |
2.7km |
17/01/2024 |
CONDITIONAL |
Gortersluin Td , Aclare , Co. Sligo |
Decommission existing percolation area serving existing dwelling house and modification location of Ter 3 Packaged Tertiary as granted under planning Ref:PL 22/36... login required. |
Details... |
940m |
07/06/2023 |
CONDITIONAL |
Gortersluin , Aclare , Co. Sligo |
to refurbish an existing derelict dwelling and construct a 37 sq.m extension to the West of the dwelling along with installation of a new effluent treatment system with soil percolation area and associated site works... login required. |
Details... |
2.7km |
07/11/2022 |
CONDITIONAL |
Gortersluin Td , Aclare , Co. Sligo |
development consisting of decommissioning of existing wastewater percolation area and install a new tertiary polishing filter and attenuation area. A Natura Impact Statement is also submitted with this application.... login required. |
Details... |
390m |
08/07/2022 |
CONDITIONAL |
Glenavoo , Aclare , Co. Sligo |
development consisting of construction of a dwelling house and domestic garage with proprietary effluent treatment system and for all associated site works... login required. |
Details... |
2.1km |
28/06/2022 |
CONDITIONAL |
Cloonydiveen , Aclare , Co Sligo |
development consisting of change of house type from that as previously granted under PL21/250... login required. |
Details... |
2.8km |
14/01/2022 |
CONDITIONAL |
Lislea , Aclare , Ballymote |
Development consisting of the proposed erection of an On-Farm Horticulture Building (consisting of Production Area, Cold Storage Area, Storage and Preparation Area, Laboratory, Kitchen Servery and farm Office/meetin... login required. |
Details... |
160m |
07/10/2021 |
N/A |
Glenavoo , Aclare , Co. Sligo |
development consisting of the construction of a new dwelling house, garage, wastewater treatment system and all associated site works... login required. |
Details... |
2.8km |
24/09/2021 |
N/A |
Lislea , Aclare , Ballymote |
Development consisting of the proposed erection of an On-Farm Horticulture Building (consisting of Production Area, Cold Storage Area, Storage and Preparation Area, Laboratory, K... login required. |
Details... |
160m |
06/09/2021 |
N/A |
Glenavoo , Aclare , Co Sligo |
Development consisting of construction of a new dwelling house, garage, waste water treatment system and all associated site works
... login required. |
Details... |
2.7km |
04/08/2021 |
CONDITIONAL |
Castlerock , Aclare , Co Sligo |
Development consisting of; (a) demolition of existing dwelling house and outbuildings on site, (b) construction of a dwelling house with attached garage, proprietary effluent treatment unit and soil polishing filter on site together with all ancillary site works and services
... login required. |
Details... |
2.1km |
28/06/2021 |
CONDITIONAL |
Cloonydiveen , Aclare , Co. Sligo |
Development consisting of construction of a proposed dwelling house, garage, septic tank system and percolation area, complete with all associated works... login required. |
Details... |