2.2km |
30/10/2024 |
N/A |
Shean , Edenderry , Co. Offaly |
Permission to construct 1 no. agricultural hay storage shed (215.2sqm) and 1 no. stables (215.2sqm) consisting of 10 stable cubicles and tack room. Permission is also sought for a new agricultural entrance onto the public road and all associated site works at the above address.... login required. |
Details... |
2.1km |
30/10/2024 |
N/A |
Shean , Edenderry , Co. Offaly |
the existing apartments in the existing basement of the dwelling house. Permission is also sought to retain and complete for the existing outbuilding to the south boundary of the site and all associated site works... login required. |
Details... |
2.4km |
19/06/2023 |
CONDITIONAL |
CLONMEL , CLONBULLOGUE , CO. OFFALY |
TO RENOVATE AND EXTEND EXISTING DWELLING HOUSE AND DOMESTIC SHED TOGETHER WITH ALL ANCILLARY WORKS... login required. |
Details... |
1.5km |
26/04/2023 |
CONDITIONAL |
SHEAN , EDENDERRY , CO. OFFALY R45 KN92 |
1) A SINGLE STOREY, MASONRY CONSTRUCTED, PITCHED ROOF BUILDING AND 2) A SINGLE STOREY, STEEL FRAMED, PITCHED ROOF, TIMBER CLAD OUTBUILDING TO THE REAR/SIDE (FOR ANCILLARY USE) TO THE EXISTING DWELLING... login required. |
Details... |
630m |
23/09/2022 |
CONDITIONAL |
BALLYKILLEEN SHEAN KILCUMBER AND BALLINOWLART NORTH , CO. OFFALY |
THE DEVELOPMENT OF (A) APPROXIMATELY 970M OF NEW INTERNAL ACCESS ROADS FOR THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/ 19/606 AND ABP 306924-20), (B) UPGRADE OF APPROXIMATELY 560M OF AN EXISTING BORD NA MONÁ BOG ACCESS ROAD, (C) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PE... login required. |
Details... |
640m |
12/08/2022 |
N/A |
THE TOWNLANDS OF BALLYKILLEEN SHEAN , KILCUMBER AND BALLINOWLART NORTH , CO. OFFALY |
(A) CONSTRUCTION OF A 1.5KM, 5M WIDE, UNPAVED, ACCESS ROAD FROM THE R401 INTO THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/19/606 AND ABP 306924-20), (B) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERM... login required. |
Details... |
1.5km |
11/03/2022 |
N/A |
SHEAN , EDENDERRY CO. OFFALY , R45 KN92 |
A SINGLE STOREY MASONRY CONSTRUCTED OUTBUILDING AND A SINGLE STOREY STEEL FRAMED, TIMBER CLAD OUTBUILDING TO THE REAR/SIDE OF THE PROPERTY ... login required. |
Details... |
1.5km |
11/02/2022 |
N/A |
SHEAN EDENDERRY , CO. OFFALY , R45 KN92 |
A SINGLE STOREY MASONRY CONSTRUCTED OUTBUILDING AND A SINGLE STOREY STEEL FRAMED, TIMBER CLAD OUTBUILDING TO THE REAR/SIDE OF THE PROPERTY... login required. |
Details... |
2km |
20/09/2021 |
CONDITIONAL |
BALLYKILLEEN , EDENDERRY , CO. OFFALY |
CONSTRUCTION OF A TWO-STOREY DWELLING AND A DOMESTIC GARAGE AND A WASTE WATER TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
580m |
10/05/2021 |
CONDITIONAL |
BALLYKILLEEN , EDENDERRY , CO. OFFALY |
DEVELOPMENT AT EDENDERRY POWER PLANT. EDENDERRY POWER LIMITED CURRENTLY HAS PLANNING PERMISSION TO OPERATE EDENDERRY POWER PLANT AS A PEAT AND BIOMASS CO-FIRED POWER PLANT UNDER GRANT OF PLANNING PERMISSION (OFFALY COUNTY COUNCIL REGISTER REFERENCE - PL2/15/129, AN BORD PLEANÁLA REGISTER REFERENCE - PL 19.245295). THE PROPOSED DEVELOPMENT WILL CONSIST OF THE CONTINUED OPERATION OF EDENDERRY POWER PLANT FROM THE BEGINNING OF 2024 TO THE END OF 2030 EXCLUSIVELY USING SUSTAINABLE BIOMASS FUEL. THE APPLICANT PROPOSES TO INCREASE THE VOLUME OF BIOMASS CONSUMED AT THE FACILITY FROM A CURRENT MAXIMUM OF 300,000 TO 530,000 TONNES PER ANNUM. IT IS PROPOSED TO UTILISE THE EXISTING PERMITTED ELECTRICITY GENERATION STATION AND INFRASTRUCTURE, INCLUDING FUEL HANDLING SYS... login required. |
Details... |
2.6km |
10/05/2021 |
CONDITIONAL |
CLONCREEN , CLONBULLOGUE , CO. OFFALY |
INTENTION TO EXTEND THE LIFETIME OF CLONBULLOGUE ASH REPOSITORY TO THE END OF 2031. THE DEVELOPMENT WILL CONSIST OF: (1.) THE CONTINUED OPERATION OF THE EXISTING ASH REPOSITORY FROM THE BEGINNING OF 2024 UNTIL THE END OF 2031, INCLUDING THE USE OF ALL ASSOCIATED INFRASTRUCTURE; (2.) THE DEPOSITION OF UP TO 13,000 TONNES PER ANNUM OF BIOMASS ASH FROM EDENDERRY POWER PLANT BETWEEN THE BEGINNING OF 2024 UNTIL THE END OF 2030; (3.) AN AMENDMENT TO THE PLANNING BOUNDARY TO INCORPORATE THE EXISTING SITE ENTRANCE; (4.) THE COMPLETION OF THE CONSTRUCTION OF CELL 6 (UP TO AN AREA OF 23,752 M2); (5.) THE COMPLETION OF THE CAPPING OF CELLS 5 OVER AN AREA OF 24,009 M2 AND CELL 6 OVER AN AREA OF 23,75... login required. |
Details... |
980m |
09/02/2021 |
CONDITIONAL |
BALLYKILLEEN TOWNLAND , CO. OFFALY , (WITHIN THE PREVIOUSLY CONSENTED CLONCREEN WIND FARM - ABP REF PL19.PA0047) |
A MODULAR BATTERY ENERGY STORAGE SYSTEM (BESS) FACILITY WITHIN THE FOOTPRINT OF A PREVIOUSLY CONSENTED CONSTRUCTION COMPOUND (ABP REF. PL19.PA0047). PLANNING PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS. THE FACILITY WILL CONSIST OF UP TO 28 NO. BATTERY STORAGE MODULES (UP TO 13M IN LENGTH, 3M IN WIDTH AND 3M IN HEIGHT) AND ANCILLARY EQUIPMENT INCLUDING UP TO: 28 NO. STEP-UP TRANSFORMERS, 28 NO. AIR-HANDLING UNITS AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS AND SERVICES, INCLUDING LIGHTNING PROTECTION MONOPOLES; COLUMN LIGHTING AND... login required. |
Details... |
970m |
12/01/2021 |
N/A |
BALLYKILLEEN TOWNLAND , CO. OFFALY , (WITHIN THE PREVIOUSLY CONSENTED CLONCREEN WIND FARM - ABP REF PL19.PA0047) |
THE CONTINUED USE OF A CONSENTED CONSTRUCTION COMPOUND (PL19.PA0047) AS A MODULAR BATTERY ENERGY STORAGE SYSTEM (BESS) FACILITY. PLANNING PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS. THE FACILITY WILL CONSIST OF: UP TO 28 NO. BATTERY STORAGE MODULES (UP TO 13M IN LENGTH, 3M IN WIDTH AND 3M IN HEIGHT) AND ANCILLARY EQUIPMENT INCLUDING UP TO: 28 NO. STEP-UP TRANSFORMERS, 28 NO. AIR HANDLING UNITS AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS AND SERVICES, INCLUDING LIGHTNING PROTECTION MON... login required. |
Details... |