1.8km |
11/10/2024 |
N/A |
Clongarret , Clonbulloge , Co. Offaly |
Permission is being sought for the development which will consist of 1 single storey dwelling comprising of 2 bedrooms, 1 bathroom, entry lobby/utility, open plan kitchen/living/dining room and covered ‘car port’, having a gro... login required. |
Details... |
1.8km |
09/10/2024 |
N/A |
Clongarret , Clonbulloge , Co. Offaly |
Permission is being sought for the development which will consist of 1 single storey dwelling comprising of 2 bedrooms, 1 bathroom, entry lobby/utility, open plan kitchen/living/dining room and covered ‘car port’, having a gro... login required. |
Details... |
1.8km |
26/09/2024 |
N/A |
Clongarret , Clonbulloge , Co. Offaly |
1 single story dwelling comprising of 2 bedrooms, 1 bathroom, entry lobby/utility, open plan kitchen/living/dining room and covered 'car port' having a gross floor area ... login required. |
Details... |
1.8km |
31/08/2024 |
N/A |
Clongarret , Clonbulloge , Co. Offaly |
1 single story dwelling comprising of 2 bedrooms, 1 bathroom, entry lobby/utility, open plan kitchen/living/dining room and covered 'car port' having a gross floor area of 105m2 and associated on-site wastewater treatment plant and percolation area.... login required. |
Details... |
1.9km |
29/08/2024 |
N/A |
CLONGARRET , CLONBULLOGUE , CO. OFFALY |
A NEW SINGLE STOREY DWELLING WITH CONNECTION TO A NEW EFFLUENT WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA, THE ERECTION OF A NEW DOMESTIC GARAGE AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
1.8km |
01/08/2024 |
N/A |
Clongarrett , Clonbullogue , Co. Offaly |
1 single story dwelling comprising of 2 bedrooms, 1 bathroom, entry lobby, open plan kitchen/living/dining room and covered 'car port' having a gross floor area of 105m2... login required. |
Details... |
2.5km |
19/06/2023 |
CONDITIONAL |
CLONMEL , CLONBULLOGUE , CO. OFFALY |
TO RENOVATE AND EXTEND EXISTING DWELLING HOUSE AND DOMESTIC SHED TOGETHER WITH ALL ANCILLARY WORKS... login required. |
Details... |
2.4km |
30/05/2023 |
CONDITIONAL |
CLONBULLOGE , TULLAMORE , CO OFFALY |
THE CONSTRUCTION OF A TWO STOREY DWELLING HOUSE, VEHICULAR ENTRANCE, INSTALLATION OF AN EFFLUENT TREATMENT SYSTEM/POLISHING FILTER AND ANY OTHER ASSOCIATED SITE WORKS ... login required. |
Details... |
2.9km |
23/09/2022 |
CONDITIONAL |
RATHVILLA HOUSE RATHVILLA EDENDERRY , CO. OFFALY , R45KP38 |
CONSTRUCTION OF A DETACHED HOME OFFICE/STUDIO. ALSO AN EXTENSION TO THE REAR AND SIDE, AND THE DEMOLITION OF THE FRONT PORCH OF EXISTING DWELLING, A NEW EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA TO REPLACE EXISTING SEPTIC TANK AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
3km |
23/09/2022 |
CONDITIONAL |
BALLYKILLEEN SHEAN KILCUMBER AND BALLINOWLART NORTH , CO. OFFALY |
THE DEVELOPMENT OF (A) APPROXIMATELY 970M OF NEW INTERNAL ACCESS ROADS FOR THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/ 19/606 AND ABP 306924-20), (B) UPGRADE OF APPROXIMATELY 560M OF AN EXISTING BORD NA MONÁ BOG ACCESS ROAD, (C) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PE... login required. |
Details... |
3km |
12/08/2022 |
N/A |
THE TOWNLANDS OF BALLYKILLEEN SHEAN , KILCUMBER AND BALLINOWLART NORTH , CO. OFFALY |
(A) CONSTRUCTION OF A 1.5KM, 5M WIDE, UNPAVED, ACCESS ROAD FROM THE R401 INTO THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/19/606 AND ABP 306924-20), (B) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERM... login required. |
Details... |
1.4km |
20/12/2021 |
CONDITIONAL |
ESKER MORE , CO. OFFALY |
CONTINUED USE OF AN EXISTING GUYED WIND MONITORING MAST, WITH INSTRUMENTS, 100M IN HEIGHT ON ITS LANDS AT ESKER MORE, CO. OFFALY FOR A FURTHER PERIOD OF TWO YEARS. THE PURP... login required. |
Details... |
2.6km |
30/09/2021 |
CONDITIONAL |
BALLINOWLART NORTH BALLYKILLEN KILCUMBER CLONCANT AND CUSHALING , EDENDERRY , CO. OFFALY |
A PERIOD OF 10 YEARS TO CONSTRUCT AND COMPLETE A SOLAR PV DEVELOPMENT WITH A TOTAL SITE AREA OF CIRCA 117.47 HECTARES, TO INCLUDE PV PANELS MOUNTED ON METAL FRAMES, NEW ACCESS TRACKS, UNDERGROUND CABLING, ... login required. |
Details... |
2.7km |
10/05/2021 |
CONDITIONAL |
BALLYKILLEEN , EDENDERRY , CO. OFFALY |
DEVELOPMENT AT EDENDERRY POWER PLANT. EDENDERRY POWER LIMITED CURRENTLY HAS PLANNING PERMISSION TO OPERATE EDENDERRY POWER PLANT AS A PEAT AND BIOMASS CO-FIRED POWER PLANT UNDER GRANT OF PLANNING PERMISSION (OFFALY COUNTY COUNCIL REGISTER REFERENCE - PL2/15/129, AN BORD PLEANÁLA REGISTER REFERENCE - PL 19.245295). THE PROPOSED DEVELOPMENT WILL CONSIST OF THE CONTINUED OPERATION OF EDENDERRY POWER PLANT FROM THE BEGINNING OF 2024 TO THE END OF 2030 EXCLUSIVELY USING SUSTAINABLE BIOMASS FUEL. THE APPLICANT PROPOSES TO INCREASE THE VOLUME OF BIOMASS CONSUMED AT THE FACILITY FROM A CURRENT MAXIMUM OF 300,000 TO 530,000 TONNES PER ANNUM. IT IS PROPOSED TO UTILISE THE EXISTING PERMITTED ELECTRICITY GENERATION STATION AND INFRASTRUCTURE, INCLUDING FUEL HANDLING SYS... login required. |
Details... |
2km |
09/02/2021 |
CONDITIONAL |
BALLYKILLEEN TOWNLAND , CO. OFFALY , (WITHIN THE PREVIOUSLY CONSENTED CLONCREEN WIND FARM - ABP REF PL19.PA0047) |
A MODULAR BATTERY ENERGY STORAGE SYSTEM (BESS) FACILITY WITHIN THE FOOTPRINT OF A PREVIOUSLY CONSENTED CONSTRUCTION COMPOUND (ABP REF. PL19.PA0047). PLANNING PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS. THE FACILITY WILL CONSIST OF UP TO 28 NO. BATTERY STORAGE MODULES (UP TO 13M IN LENGTH, 3M IN WIDTH AND 3M IN HEIGHT) AND ANCILLARY EQUIPMENT INCLUDING UP TO: 28 NO. STEP-UP TRANSFORMERS, 28 NO. AIR-HANDLING UNITS AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS AND SERVICES, INCLUDING LIGHTNING PROTECTION MONOPOLES; COLUMN LIGHTING AND... login required. |
Details... |
2km |
12/01/2021 |
N/A |
BALLYKILLEEN TOWNLAND , CO. OFFALY , (WITHIN THE PREVIOUSLY CONSENTED CLONCREEN WIND FARM - ABP REF PL19.PA0047) |
THE CONTINUED USE OF A CONSENTED CONSTRUCTION COMPOUND (PL19.PA0047) AS A MODULAR BATTERY ENERGY STORAGE SYSTEM (BESS) FACILITY. PLANNING PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS. THE FACILITY WILL CONSIST OF: UP TO 28 NO. BATTERY STORAGE MODULES (UP TO 13M IN LENGTH, 3M IN WIDTH AND 3M IN HEIGHT) AND ANCILLARY EQUIPMENT INCLUDING UP TO: 28 NO. STEP-UP TRANSFORMERS, 28 NO. AIR HANDLING UNITS AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS AND SERVICES, INCLUDING LIGHTNING PROTECTION MON... login required. |
Details... |