2.5km |
30/10/2024 |
N/A |
Shean , Edenderry , Co. Offaly |
Permission to construct 1 no. agricultural hay storage shed (215.2sqm) and 1 no. stables (215.2sqm) consisting of 10 stable cubicles and tack room. Permission is also sought for a new agricultural entrance onto the public road and all associated site works at the above address.... login required. |
Details... |
2.4km |
30/10/2024 |
N/A |
Shean , Edenderry , Co. Offaly |
the existing apartments in the existing basement of the dwelling house. Permission is also sought to retain and complete for the existing outbuilding to the south boundary of the site and all associated site works... login required. |
Details... |
2.4km |
19/08/2024 |
CONDITIONAL |
Ballinrath , Edenderry , Co. Offaly |
NEW 77 SQ/M SINGLE STOREY EXTENSION TO REAR, SIDE AND FRONT OF EXISTING DWELLING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.3km |
12/08/2024 |
CONDITIONAL |
BALLINRATH , EDENDERRY , CO. OFFALY |
CONSTRUCTION OF A DWELLING AND A DOMESTIC GARAGE AND A WASTE WATER TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
2.3km |
07/08/2024 |
N/A |
BALLINRATH , EDENDERRY , CO. OFFALY |
CONSTRUCTION OF A DWELLING AND A DOMESTIC GARAGE AND A WASTE TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.8km |
19/06/2023 |
CONDITIONAL |
CLONMEL , CLONBULLOGUE , CO. OFFALY |
TO RENOVATE AND EXTEND EXISTING DWELLING HOUSE AND DOMESTIC SHED TOGETHER WITH ALL ANCILLARY WORKS... login required. |
Details... |
2.6km |
16/06/2023 |
CONDITIONAL |
BALLYKILLEEN , EDENDERRY , CO. OFFALY |
THE AS BUILT SIDE AND REAR SINGLE STOREY EXTENSION TO THE ORIGINAL COTTAGE INCLUDING ALL ANCILLARY SERVICES AND SITE WORKS... login required. |
Details... |
1.7km |
26/04/2023 |
CONDITIONAL |
SHEAN , EDENDERRY , CO. OFFALY R45 KN92 |
1) A SINGLE STOREY, MASONRY CONSTRUCTED, PITCHED ROOF BUILDING AND 2) A SINGLE STOREY, STEEL FRAMED, PITCHED ROOF, TIMBER CLAD OUTBUILDING TO THE REAR/SIDE (FOR ANCILLARY USE) TO THE EXISTING DWELLING... login required. |
Details... |
2.3km |
14/02/2023 |
CONDITIONAL |
BALLINRATH , EDENDERRY , CO. OFFALY |
CONSTRUCTION OF A SINGLE STOREY DWELLING (201.8 SQ.M.) DOMESTIC GARAGE (61.5 SQ.M.) AND A NEW DOMESTIC ENTRANCE ONTO PUBLIC ROADWAY. PERMISSION IS SOUGHT FOR THE INSTALLATION OF A SECONDARY TREATMENT SYSTEM AND SOIL POLISHING FILTER AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
23/09/2022 |
CONDITIONAL |
RATHVILLA HOUSE RATHVILLA EDENDERRY , CO. OFFALY , R45KP38 |
CONSTRUCTION OF A DETACHED HOME OFFICE/STUDIO. ALSO AN EXTENSION TO THE REAR AND SIDE, AND THE DEMOLITION OF THE FRONT PORCH OF EXISTING DWELLING, A NEW EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA TO REPLACE EXISTING SEPTIC TANK AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1km |
23/09/2022 |
CONDITIONAL |
BALLYKILLEEN SHEAN KILCUMBER AND BALLINOWLART NORTH , CO. OFFALY |
THE DEVELOPMENT OF (A) APPROXIMATELY 970M OF NEW INTERNAL ACCESS ROADS FOR THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/ 19/606 AND ABP 306924-20), (B) UPGRADE OF APPROXIMATELY 560M OF AN EXISTING BORD NA MONÁ BOG ACCESS ROAD, (C) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PE... login required. |
Details... |
1.1km |
12/08/2022 |
N/A |
THE TOWNLANDS OF BALLYKILLEEN SHEAN , KILCUMBER AND BALLINOWLART NORTH , CO. OFFALY |
(A) CONSTRUCTION OF A 1.5KM, 5M WIDE, UNPAVED, ACCESS ROAD FROM THE R401 INTO THE PERMITTED CUSHALING WIND FARM (PLANNING REF. PL2/19/606 AND ABP 306924-20), (B) CONSTRUCTION OF A 1.6KM DOUBLE CIRCUIT 33KV UNDERGROUND COLLECTOR CABLE FROM THE PERMITTED CUSHALING WIND FARM TO THE PERM... login required. |
Details... |
2.4km |
04/04/2022 |
CONDITIONAL |
BALLYNAKILL , EDENDERRY , CO. OFFALY |
THE CONSTRUCTION OF A TWO-STOREY DWELLING WITH AN INTEGRATED DOMESTIC GARAGE AND A WASTE WATER TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.7km |
11/03/2022 |
N/A |
SHEAN , EDENDERRY CO. OFFALY , R45 KN92 |
A SINGLE STOREY MASONRY CONSTRUCTED OUTBUILDING AND A SINGLE STOREY STEEL FRAMED, TIMBER CLAD OUTBUILDING TO THE REAR/SIDE OF THE PROPERTY ... login required. |
Details... |
1.7km |
11/02/2022 |
N/A |
SHEAN EDENDERRY , CO. OFFALY , R45 KN92 |
A SINGLE STOREY MASONRY CONSTRUCTED OUTBUILDING AND A SINGLE STOREY STEEL FRAMED, TIMBER CLAD OUTBUILDING TO THE REAR/SIDE OF THE PROPERTY... login required. |
Details... |
2.1km |
20/12/2021 |
CONDITIONAL |
ESKER MORE , CO. OFFALY |
CONTINUED USE OF AN EXISTING GUYED WIND MONITORING MAST, WITH INSTRUMENTS, 100M IN HEIGHT ON ITS LANDS AT ESKER MORE, CO. OFFALY FOR A FURTHER PERIOD OF TWO YEARS. THE PURP... login required. |
Details... |
970m |
30/09/2021 |
CONDITIONAL |
BALLINOWLART NORTH BALLYKILLEN KILCUMBER CLONCANT AND CUSHALING , EDENDERRY , CO. OFFALY |
A PERIOD OF 10 YEARS TO CONSTRUCT AND COMPLETE A SOLAR PV DEVELOPMENT WITH A TOTAL SITE AREA OF CIRCA 117.47 HECTARES, TO INCLUDE PV PANELS MOUNTED ON METAL FRAMES, NEW ACCESS TRACKS, UNDERGROUND CABLING, ... login required. |
Details... |
1.7km |
20/09/2021 |
CONDITIONAL |
BALLYKILLEEN , EDENDERRY , CO. OFFALY |
CONSTRUCTION OF A TWO-STOREY DWELLING AND A DOMESTIC GARAGE AND A WASTE WATER TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.5km |
20/05/2021 |
CONDITIONAL |
BALLINRATH , EDENDERRY , CO. OFFALY |
(A) 1 NO. NEW STOREY AND HALF TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
730m |
10/05/2021 |
CONDITIONAL |
BALLYKILLEEN , EDENDERRY , CO. OFFALY |
DEVELOPMENT AT EDENDERRY POWER PLANT. EDENDERRY POWER LIMITED CURRENTLY HAS PLANNING PERMISSION TO OPERATE EDENDERRY POWER PLANT AS A PEAT AND BIOMASS CO-FIRED POWER PLANT UNDER GRANT OF PLANNING PERMISSION (OFFALY COUNTY COUNCIL REGISTER REFERENCE - PL2/15/129, AN BORD PLEANÁLA REGISTER REFERENCE - PL 19.245295). THE PROPOSED DEVELOPMENT WILL CONSIST OF THE CONTINUED OPERATION OF EDENDERRY POWER PLANT FROM THE BEGINNING OF 2024 TO THE END OF 2030 EXCLUSIVELY USING SUSTAINABLE BIOMASS FUEL. THE APPLICANT PROPOSES TO INCREASE THE VOLUME OF BIOMASS CONSUMED AT THE FACILITY FROM A CURRENT MAXIMUM OF 300,000 TO 530,000 TONNES PER ANNUM. IT IS PROPOSED TO UTILISE THE EXISTING PERMITTED ELECTRICITY GENERATION STATION AND INFRASTRUCTURE, INCLUDING FUEL HANDLING SYS... login required. |
Details... |