2.8km |
21/12/2023 |
CONDITIONAL |
WOODFIELD , BIRR , CO. OFFALY |
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.1km |
29/08/2023 |
CONDITIONAL |
BOGDERRIES , BIRR , CO. OFFALY |
THE CONSTRUCTION OF AN EXTENSION AND RENOVATIONS TO AN EXISTING DERELICT DWELLING/STRUCTURE, INSTALLATION OF WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
22/08/2023 |
CONDITIONAL |
WOODFIELD , BIRR , CO. OFFALY |
BUILDING WHICH CONTAINS DRESSING ROOMS AND EQUIPMENT STORAGE AREA AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
2.1km |
31/05/2023 |
N/A |
BOGDERRIES , BIRR , CO. OFFALY |
THE CONSTRUCTION OF AN EXTENSION AND ALTERATIONS TO AN EXISTING DWELLING HOUSE, INSTALL WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.2km |
15/03/2023 |
CONDITIONAL |
BALLYNAGUILSHA , BIRR , CO. OFFALY |
AN EXTENSION AND ALTERATIONS TO AN EXISTING DWELLING HOUSE, NEW TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS. PERMISSION IS ALSO BEING SOUGHT FOR THE DEMOLITION OF AN EXISTING SHED... login required. |
Details... |
1.8km |
29/08/2022 |
CONDITIONAL |
GALROS WEST FIVEALLEY , BIRR , CO. OFFALY |
(I) THE EXISTING 80 METRE METEOROLOGICAL MAST, WHICH WAS ERECTED AS EXEMPTED DEVELOPMENT IN ACCORDANCE WITH CLASS 20A, SCHEDULE 2, OF THE PLANNING AND DEVELOPMENT REGULATIONS 2001 (AS AMENDED), AND ALL ANCILLARY INFRASTRUCTURE AND ASSOCIATED SITE DEVELOPMENT AND REINSTATEMENT WORKS; A... login required. |
Details... |
1.8km |
10/08/2022 |
N/A |
GALROS WEST , COUNTY OFFALY |
(I) THE CONTINUED OPERATION OF THE EXISTING 80 METRE METEOROLOGICAL MAST, WHICH WAS ERECTED AS EXEMPTED DEVELOPMENT IN ACCORDANCE WITH CLASS 20A, SCHEDULE 2, OF THE PLANNING AND DEVELOPMENT REGULATIONS 2001 (AS AMENDED), AND ALL ANCILLARY INFRASTRUCTURE AND ASSOCIATED SITE DEVELOPMENT AND REI... login required. |
Details... |
2.7km |
29/11/2021 |
CONDITIONAL |
WOODFIELD OR TULLYNISK , BIRR , CO. OFFALY |
INSTALLATION OF A REPLACEMENT EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.6km |
29/11/2021 |
CONDITIONAL |
WOODFIELD OR TULLYNISK , BIRR , CO. OFFALY |
INSTALLATION OF A NEW EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.7km |
08/11/2021 |
N/A |
WOODFIELD OR TULLYNISK , BIRR , CO OFFALY |
INSTALLATION OF A REPLACEMENT EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITEWORKS... login required. |
Details... |
2.3km |
20/10/2021 |
CONDITIONAL |
EGLISH FIVEALLEY , BIRR , CO. OFFALY |
CONSTRUCTION OF A NEW SINGLE STOREY DWELLING, NEW VEHICULAR ENTRANCE, DRIVEWAY, WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAYS, AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
26/04/2021 |
CONDITIONAL |
LISHEEN , BIRR , CO. OFFALY |
MOBILE HOME / TEMPORARY ACCOMMODATION. PERMISSION FOR CONSTRUCTION OF A PROPOSED TWO-STOREY DWELLING AND DOMESTIC GARAGE, A PROPOSED SEPTIC TANK WITH PERCOLATION AREA, ALL ASSOCIATED SITEWORKS, INCLUDING A PROPOSED SITE ENTRANCE... login required. |
Details... |
1.6km |
20/04/2021 |
CONDITIONAL |
BALLINDOWN BOGDERRIES , BALLYWILLIAM AND BALLYNAGUILSHA , CO. OFFALY |
A 10 YEAR PERMISSION FOR THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 40MW COMPRISING ON CA. 122,904 NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, THE CONSTRUCTION OF A 38KV SUBSTATION (CA. 144.4M2 X 4.75M TALL), A TRANSFORMER UNIT (CA. 18M2 X 4M TALL) AND ASSOCIATED BUND, ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 16 NO. POWER HUBS (CA. 15.25M2 X 2.4M), WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. ... login required. |
Details... |