2.1km |
21/12/2023 |
CONDITIONAL |
WOODFIELD , BIRR , CO. OFFALY |
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
3km |
06/10/2023 |
CONDITIONAL |
In the townlands of Townparks (Birr) Dovegrove , Woodfield or Tullynisk , and Clondallow Co. Offaly |
A ten year Planning Permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii) Reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) All associated site development works, ancillary works and apparatus considered necessary to facilitate the prop... login required. |
Details... |
3km |
22/09/2023 |
N/A |
in the townlands of Townparks Dovegrove , Woodfield or Tullynisk , and Clondallow Co. Offaly |
a ten-year planning permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii)reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) all associated site development works, ancillary works and apparatus considered necessary to facilitate the propos... login required. |
Details... |
940m |
29/08/2023 |
CONDITIONAL |
BOGDERRIES , BIRR , CO. OFFALY |
THE CONSTRUCTION OF AN EXTENSION AND RENOVATIONS TO AN EXISTING DERELICT DWELLING/STRUCTURE, INSTALLATION OF WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.2km |
22/08/2023 |
CONDITIONAL |
WOODFIELD , BIRR , CO. OFFALY |
BUILDING WHICH CONTAINS DRESSING ROOMS AND EQUIPMENT STORAGE AREA AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
940m |
31/05/2023 |
N/A |
BOGDERRIES , BIRR , CO. OFFALY |
THE CONSTRUCTION OF AN EXTENSION AND ALTERATIONS TO AN EXISTING DWELLING HOUSE, INSTALL WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.5km |
15/03/2023 |
CONDITIONAL |
BALLYNAGUILSHA , BIRR , CO. OFFALY |
AN EXTENSION AND ALTERATIONS TO AN EXISTING DWELLING HOUSE, NEW TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS. PERMISSION IS ALSO BEING SOUGHT FOR THE DEMOLITION OF AN EXISTING SHED... login required. |
Details... |
2.9km |
22/12/2022 |
CONDITIONAL |
TOWNPARKS , BIRR , CO. OFFALY |
A NEW PRIMARY SCHOOL FOR GAELSCOIL NA LAOCHRA. THE DEVELOPMENT WILL CONSIST OF THE CONSTRUCTION OF A NEW 4 CLASSROOM, 1 SEN BASE SCHOOL, GENERAL PURPOSE HALL, AND ALL ANCILLARY TEACHING SPACES A... login required. |
Details... |
2.9km |
07/11/2022 |
N/A |
CLONBRONE , BIRR , CO. OFFALY |
THE INFILLING OF LAND AND CONSTRUCTION OF A GRAVEL ROAD... login required. |
Details... |
1.6km |
21/10/2022 |
N/A |
BOOLINARIG BIG , BIRR , CO. OFFALY |
AN EXTENSION TO THE EXISTING DWELLING, ALTERATIONS TO THE EXISTING DWELLLING AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
30/09/2022 |
N/A |
CLONBRONE , BIRR , CO. OFFALY |
INFILLING OF LAND AND CONSTRUCTION OF A GRAVEL ROAD... login required. |
Details... |
2.9km |
08/09/2022 |
CONDITIONAL |
SYNGEFIELD CLONOGHIL UPPER , BIRR , CO. OFFALY |
THE CONSTRUCTION OF A REAR SINGLE STOREY EXTENSION TO THE EXISTING DWELLING, CONVERSION AND ALTERATIONS TO THE EXISTING 2 STOREY ADJOINING SIDE AND REAR DOMESTIC SHEDS TO FORM PART OF THE EXISTING DWELLING, PROPOSED NEW WINDOWS AND DOOR OPENINGS TO THE FRONT, SIDE ... login required. |
Details... |
2.9km |
18/08/2022 |
N/A |
SYNGEFIELD , CLONOGHILL UPPER , BIRR CO. OFFALY |
THE CONSTRUCTION OF A REAR SINGLE STOREY EXTENSION TO THE EXISTING DWELLING, CONVERSION AND ALTERATIONS TO THE EXISTING 2 STOREY ADJOINING SIDE AND REAR DOMESTIC SHEDS TO FORM PART OF THE EXISTING DWELLING, PROPOSED ... login required. |
Details... |
2.8km |
20/04/2022 |
CONDITIONAL |
CLONOGHILL LOWER , BIRR , CO. OFFALY |
AN EXTENSION AND ALTERATIONS TO AN EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.8km |
29/11/2021 |
CONDITIONAL |
WOODFIELD OR TULLYNISK , BIRR , CO. OFFALY |
INSTALLATION OF A REPLACEMENT EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.7km |
29/11/2021 |
CONDITIONAL |
WOODFIELD OR TULLYNISK , BIRR , CO. OFFALY |
INSTALLATION OF A NEW EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.8km |
08/11/2021 |
N/A |
WOODFIELD OR TULLYNISK , BIRR , CO OFFALY |
INSTALLATION OF A REPLACEMENT EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITEWORKS... login required. |
Details... |
2.7km |
20/10/2021 |
CONDITIONAL |
EGLISH FIVEALLEY , BIRR , CO. OFFALY |
CONSTRUCTION OF A NEW SINGLE STOREY DWELLING, NEW VEHICULAR ENTRANCE, DRIVEWAY, WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAYS, AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.8km |
26/04/2021 |
CONDITIONAL |
LISHEEN , BIRR , CO. OFFALY |
MOBILE HOME / TEMPORARY ACCOMMODATION. PERMISSION FOR CONSTRUCTION OF A PROPOSED TWO-STOREY DWELLING AND DOMESTIC GARAGE, A PROPOSED SEPTIC TANK WITH PERCOLATION AREA, ALL ASSOCIATED SITEWORKS, INCLUDING A PROPOSED SITE ENTRANCE... login required. |
Details... |