1.3km |
20/06/2024 |
CONDITIONAL |
St. Brendan’s Community School , Cappaneale Townparks Birr , Co. Offaly |
The development will consist of the Construction of a new single-storey extension to the southwest of the existing school building, which comprises six Classrooms and two Science Laboratories, including related accommodation and linking works to the existing school building.
Refurbishment of existing Mainstream Classrooms to form a new two-classroom Special Needs Unit and the construction of a new single-storey extension to the northeast of the ex... login required. |
Details... |
1.3km |
12/06/2024 |
N/A |
St. Brendan’s Community School , Cappaneale Townparks Birr , Co. Offaly |
The development will consist of the Construction of a new single-storey extension to the southwest of the existing school building, which comprises six Classrooms and two Science Laboratories, including related accommodation and linking works to the existing school building.
Refurbishment of existing Mainstream Classrooms to form a new two-classroom Special Needs Unit and the construction of a new single-storey extension to the northeast of the ex... login required. |
Details... |
2km |
20/03/2024 |
N/A |
Townsend Street , Birr , Co.Offaly |
the alterations to the existing 2-storey, detached, derelict dwelling to include; Removal of 2no. chimneys. Internal alterations to rooms at Ground and First floor level, modification of existing ridge and eaves level by adding an ... login required. |
Details... |
1.3km |
01/03/2024 |
N/A |
Clondallow , Birr , Co. Offaly |
100MW Battery Energy Storage Station with 53 battery containers and associated equipment, with a control room container, site entrance, and all associated works... login required. |
Details... |
1.4km |
21/12/2023 |
CONDITIONAL |
WOODFIELD , BIRR , CO. OFFALY |
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
510m |
06/10/2023 |
CONDITIONAL |
In the townlands of Townparks (Birr) Dovegrove , Woodfield or Tullynisk , and Clondallow Co. Offaly |
A ten year Planning Permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii) Reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) All associated site development works, ancillary works and apparatus considered necessary to facilitate the prop... login required. |
Details... |
600m |
22/09/2023 |
N/A |
in the townlands of Townparks Dovegrove , Woodfield or Tullynisk , and Clondallow Co. Offaly |
a ten-year planning permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii)reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) all associated site development works, ancillary works and apparatus considered necessary to facilitate the propos... login required. |
Details... |
2km |
12/09/2023 |
CONDITIONAL |
Townsend Street , Birr , Co Offaly |
Construction of three bedroom dwelling and associated site works... login required. |
Details... |
2km |
02/09/2023 |
N/A |
Townsend Street , Birr , Co Offaly |
Construction of three bedroom dwelling and associated site works... login required. |
Details... |
1.5km |
22/08/2023 |
CONDITIONAL |
WOODFIELD , BIRR , CO. OFFALY |
BUILDING WHICH CONTAINS DRESSING ROOMS AND EQUIPMENT STORAGE AREA AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
2km |
18/08/2023 |
N/A |
Townsend Street , Birr , Co Offaly |
Construction of three bed dwelling and associated site works.... login required. |
Details... |
1.9km |
24/07/2023 |
CONDITIONAL |
BURKE'S HILL (TOWNPARKS T.D.) , BIRR , CO. OFFALY |
PARTIAL DEMOLITION OF THE EXISTING SINGLE STOREY OUTBUILDING AND THE CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE SOUTH-EAST OF THE EXISTING DWELLING, ALL ASSOCIATED INTERNAL MODIFICATIONS AND SITE WORKS INCLUDING THE REPOSITIONING OF THE SITE ENTRANCE... login required. |
Details... |
2.2km |
05/05/2023 |
CONDITIONAL |
Croghan , Birr , Co. Tipperary |
an extension and alterations to an existing dwelling and all associated site works... login required. |
Details... |
2.4km |
27/01/2023 |
N/A |
BIRR CASTLE DEMESNE TOWNPARKS , BIRR , CO. OFFALY |
1. PROPOSED MICRO-HYDROPOWER GENERATOR AND ASSOCIATED CONCRETE BUILT SUPPORTING BASE, TO BE LOCATED APPROXIMATELY 9 METERS SOUTHEAST OF THE EXISTING DISUSED HYDROPOWER SYSTEM. THIS PROPOSED RENEWABLE ENERGY WILL POWER THE CASTLE, THE VISITOR CENTRE AND SITE OFFICES. 2. CONSTRUCTION OF BOTH UP-GRADIENT AND DOWN-GRADIENT CHANNELS TO CONNECT THE PROPOSED MICRO-HYDROPOWER UNIT TO EXISTING WATER RACES. 3. CONSTRUCTION OF PROPOSED WOODEN SLUICE GATES WITHIN THE HEAD RACE, APPROXIMATELY 9 METERS UPSTREAM OF... login required. |
Details... |
2.4km |
22/12/2022 |
N/A |
BIRR CASTLE DEMESNE , BIRR , CO. OFFALY |
1. PROPOSED MICRO-HYDROPOWER GENERATOR AND ASSOCIATED CONCRETE BUILT SUPPORTING BASE, TO BE LOCATED APPROXIMATELY 9 METERS SOUTHEAST OF THE EXISTING DISUSED HYDROPOWER. THIS PROPOSED RENEWABLE ENERGY WILL POWER THE CASTLE, THE VISITOR CENTRE AND SITE OFFICES. 2. CONSTRUCTION OF BOTH UP-GRADIENT AND DOWN-GRADIENT CHANNELS TO CONNECT THE PROPOSED MICRO-HYDROPOWER UNIT TO EXISTING WATER RACES. 3. CONSTRUCTION OF PROPOSED WOODEN SLUICE GATES WITHIN THE HEAD RACE, APPROXIMATELY 9 METERS UPSTREAM OF TH... login required. |
Details... |
1.3km |
22/12/2022 |
CONDITIONAL |
TOWNPARKS , BIRR , CO. OFFALY |
A NEW PRIMARY SCHOOL FOR GAELSCOIL NA LAOCHRA. THE DEVELOPMENT WILL CONSIST OF THE CONSTRUCTION OF A NEW 4 CLASSROOM, 1 SEN BASE SCHOOL, GENERAL PURPOSE HALL, AND ALL ANCILLARY TEACHING SPACES A... login required. |
Details... |
2km |
16/11/2022 |
N/A |
TOWNSEND STREET , BIRR , CO. OFFALY |
CONSTRUCTION OF THREE BEDROOM DWELLING AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.7km |
21/10/2022 |
N/A |
BOOLINARIG BIG , BIRR , CO. OFFALY |
AN EXTENSION TO THE EXISTING DWELLING, ALTERATIONS TO THE EXISTING DWELLLING AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2km |
12/09/2022 |
CONDITIONAL |
GLEBE STREET , BIRR , CO. OFFALY |
GRANT PERMISSION(1) A SUB-DIVIDED RETAIL UNIT AND RETENTION PERMISSION FOR CHANGE OF USE OF THE SUB-DIVIDED RETAIL UNIT TO USE AS AN OFFICE AND ANCILLARY WORKS REFUSE PERMISSION (2) REVISIONS TO SITE BOUNDARIES. PREVIOUS PLANNING REFERENCES 17/454, BR1243 & BR1342... login required. |
Details... |
2.9km |
08/09/2022 |
CONDITIONAL |
SYNGEFIELD CLONOGHIL UPPER , BIRR , CO. OFFALY |
THE CONSTRUCTION OF A REAR SINGLE STOREY EXTENSION TO THE EXISTING DWELLING, CONVERSION AND ALTERATIONS TO THE EXISTING 2 STOREY ADJOINING SIDE AND REAR DOMESTIC SHEDS TO FORM PART OF THE EXISTING DWELLING, PROPOSED NEW WINDOWS AND DOOR OPENINGS TO THE FRONT, SIDE ... login required. |
Details... |