140m |
14/11/2024 |
N/A |
Killoran , Thurles , Co. Tipperary |
a state-of-the-art healthcare waste treatment and recycling facility and a waste transfer station. The development will include the construction of 3 no. buildings; Building 1 (total gross floor area of circa (ca.) 2,242m2 and ca. 9m tall), Building 2 (total gross floor area of ca. 229m2 and ca. 6m tall) and Building 3 (total gross floor area of ca. 68m2 and ca. 4m tall) along with associated ancillary development including rooftop solar photovoltaic panels, 1no. battery energy storage system (total gross floor area of ca. 34m2 x 2m tall) and inverter, onsite tank with bunding, vehicle parking, rainwater harvesting tank, surface wat... login required. |
Details... |
110m |
08/11/2024 |
N/A |
Killoran , Thurles , Co. Tipperary |
proposed state-of-the-art waste treatment unit and recycling facility and waste transfer station - the proposed development will disinfect and recycle healthcare waste, in addition, the other hazardous waste will be consolidated onsite for export... login required. |
Details... |
810m |
02/11/2024 |
N/A |
Former Lisheen Mine Site , Killoran Moyne , Thurles Co. Tipperary |
construction of an anaerobic digestion plant comprising: 4 no. primary digester tanks (each measuring c. 7.6 m in height); 3 no. secondary digester tanks (each measuring c. 14.5 m in height); 4 no. feed hoppers; 4 no. technical rooms (ranging in size from c. 35 sq m to c. 95 sq m GFA); 2 no. biogas conditioning units; process, storage and buffer tanks (comprising: 1 no. buffer digestate storage tank (c. 7.5 m in height), 1 no. suspension buffer tank (c. 8 m in height), 1 no. process area runoff storage tank (c. 4.5 m in height); 1 no. buffer digestate process tank (c. 4.5 m in height), 1 no. treated digestate liquids recycle storage tank (c. 4.5 m in height); 1
no. roofed liquids feed-mix tank (c. 3 m in height)); these components will be located within a containment bund constructed c. 3 m below ground level.
The proposed development will also consist of: feedstock storage (comprising 3 no. storage clamps (c. 1,050 sq m in area each) and 2 no. storage sheds (c. 500 sq m GFA each)); a biomethane upgrading plant (including natural gas compression unit); a biomethane loading facility (comprising 4 no. loading bays with associated gates and safety features measuring c. 490 sq m in area); a biomass boiler with its associated pell... login required. |
Details... |
1.2km |
25/10/2024 |
N/A |
Killoran , Templetuohy Thurles , Co Tipperary |
extensions & alterations to existing farmhouse, relevant demolition works to structures attached to house to facilitate the extension and renovation of the house, permission for new septic tank & percolation area, a new vehicular entrance and to include all associated site works... login required. |
Details... |
1.2km |
14/10/2024 |
N/A |
Killoran , Templetuohy Thurles , Co. Tipperary |
extensions & alterations to existing farmhouse, permission for new septic tank & percolation area and a new vehicular entrance and to include all associated site works... login required. |
Details... |
1.8km |
13/08/2024 |
CONDITIONAL |
Cooleeney , Moyne , Thurles Co. Tipperary |
the construction of an agricultural shed to consist of 6 no. robotic milking units, ancillary rooms, underground slatted slurry and soiled water storage tanks and all associated siteworks... login required. |
Details... |
2.7km |
05/01/2024 |
CONDITIONAL |
Baunmore , Johnstown , Co. Kilkenny |
to construct (I) Milking parlour building incorporating dairy, plant, storage, Milk tank, Meal Bin, water tank, holding yard with crush/ drafting yard, underground effluent tank with flow channel and all associated site works... login required. |
Details... |
1.3km |
22/12/2023 |
CONDITIONAL |
Derryville Moyne , Thurles , Co. Tipperary |
the construction of an 1,800 sq.m sludge holding building of c. 60m in length, 30m in width and 13.5m in height, to incorporate an open faced biofilter to be installed at the western end of the facility building, for the acceptance and temporary storage of up to 12,000 tonnes per annum of sludges produced from wastewater treatment; internal site roads and parking; a 50 sq.m welfare/office facility of c. 10m in length, 5m in width and 5m in height;... login required. |
Details... |
2.3km |
17/11/2023 |
CONDITIONAL |
Cooleeney , Moyne , Co. Tipperary |
waste water treatment plant with overground tankage up to 6 metres high on a 0.06 hectare site, within the curtilage of protected structure - S778... login required. |
Details... |
2.3km |
01/11/2023 |
N/A |
Cooleeney , Moyne , Thurles |
wastewater treatment plant with overground tankage up to 5.5m high on 0.06 hectare site... login required. |
Details... |
630m |
28/04/2023 |
CONDITIONAL |
Killoran , Thurles , Co. Tipperary |
development consisting of Workshop Building (1242m2), Truck Washout Building (64m2), commercial yard area, new boundary fence and entrance gates, an on-site Wastewater Treatment System and associated polishing filter bed perc... login required. |
Details... |
2.3km |
12/01/2023 |
CONDITIONAL |
Cooleeney Cheese Cooleeney , Moyne Thurles , Co. Tipperary |
alterations from previous planning reference’s 16600460 and 211000: a) increased basement area and ground floor area, b) revised orientation of extension, c) alterations to elevations and d) all associated works (works are within the curtilage of a protected structure, S778)... login required. |
Details... |
2.3km |
22/12/2022 |
N/A |
Cooleeney Cheese Cooleeney , Moyne Thurles , Co. Tipperary |
the following alterations from previous planning reference’s 16600460 and 210000 (1) increased basement area and ground floor area (2) revised orientation of extension (3) alterations to elevations and all associated works. Works are within the curtilage of a protected structure, S778... login required. |
Details... |
2.8km |
18/10/2022 |
CONDITIONAL |
Bruckana Windfarm , Bruckana , Johnstown |
to construct a new building to incorporate offices, a store, toilet facilities and a canteen and all associated siteworks... login required. |
Details... |
2km |
28/07/2022 |
CONDITIONAL |
Derryville , Co. Tipperary , Tipperary |
a 10-year planning permission for development of a BioProducts Campus. The Bioproducts Campus development consists of an integrated Compost / Growing Media Facility and Anaerobic Digestion Facility as well as a Biorefinery. The Compost / Growing Media Facility comprises 1 No. composting building (incorporating feedstock intake area, storage area, in-vessel tunnels, workshop), solar panels at roof level, associated biofilter and liquid storage tanks, 1 No. maturation building and 1 No. office building. The Anaerobic Digestion Facility comprises 3 No. digester tanks, 2 No. digestate storage tanks, 2 No. biogas fuelled electricity generating gas engines, 3 No. biogas processing units, associated storage tanks, bunding, plant and 1 No. gas flare. The BioRefinery includes 1 No. building (incorporating a goods inward area, processing area, drying room, process control rooms, a laborato... login required. |
Details... |
2.5km |
25/02/2022 |
CONDITIONAL |
Clonsaul , Johnstown , Co Kilkenny |
for a single-storey dwellinghouse, garage, septic tank with percolation area, entrance and all associated site works... login required. |
Details... |
1.9km |
11/08/2021 |
CONDITIONAL |
Cooleeney , Moyne , Thurles Co. Tipperary |
construction of 2 no. livestock underpasses and effluent holding tanks and all associated siteworks... login required. |
Details... |
610m |
10/08/2021 |
CONDITIONAL |
Former Maintenance Depot Former Lisheen Mine , Kiloran , Moyne Thurles Co. Tipperary |
1) Demolition of the existing loading bay canopy 2) Change of use from maintenance depot to an agri-food sector Research and Development Unit for light indutrial use with ancillary office space 3) Extension of the existing first floor accomodation by 169 sqm. 4) Construction of an external stair to the rear, additional win... login required. |
Details... |
770m |
30/07/2021 |
CONDITIONAL |
Cooleeny , Derryfadda and Killoran , Co. Tipperary |
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 ... login required. |
Details... |
760m |
21/07/2021 |
N/A |
DerryFadda , Cooleeny , Killoran |
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x... login required. |
Details... |