1.9km |
28/04/2023 |
CONDITIONAL |
Killoran , Thurles , Co. Tipperary |
development consisting of Workshop Building (1242m2), Truck Washout Building (64m2), commercial yard area, new boundary fence and entrance gates, an on-site Wastewater Treatment System and associated polishing filter bed perc... login required. |
Details... |
1.7km |
18/10/2022 |
CONDITIONAL |
Bruckana Windfarm , Bruckana , Johnstown |
to construct a new building to incorporate offices, a store, toilet facilities and a canteen and all associated siteworks... login required. |
Details... |
840m |
28/07/2022 |
CONDITIONAL |
Derryville , Co. Tipperary , Tipperary |
a 10-year planning permission for development of a BioProducts Campus. The Bioproducts Campus development consists of an integrated Compost / Growing Media Facility and Anaerobic Digestion Facility as well as a Biorefinery. The Compost / Growing Media Facility comprises 1 No. composting building (incorporating feedstock intake area, storage area, in-vessel tunnels, workshop), solar panels at roof level, associated biofilter and liquid storage tanks, 1 No. maturation building and 1 No. office building. The Anaerobic Digestion Facility comprises 3 No. digester tanks, 2 No. digestate storage tanks, 2 No. biogas fuelled electricity generating gas engines, 3 No. biogas processing units, associated storage tanks, bunding, plant and 1 No. gas flare. The BioRefinery includes 1 No. building (incorporating a goods inward area, processing area, drying room, process control rooms, a laborato... login required. |
Details... |
1.7km |
10/08/2021 |
CONDITIONAL |
Former Maintenance Depot Former Lisheen Mine , Kiloran , Moyne Thurles Co. Tipperary |
1) Demolition of the existing loading bay canopy 2) Change of use from maintenance depot to an agri-food sector Research and Development Unit for light indutrial use with ancillary office space 3) Extension of the existing first floor accomodation by 169 sqm. 4) Construction of an external stair to the rear, additional win... login required. |
Details... |
2km |
30/07/2021 |
CONDITIONAL |
Cooleeny , Derryfadda and Killoran , Co. Tipperary |
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 ... login required. |
Details... |
2km |
21/07/2021 |
N/A |
DerryFadda , Cooleeny , Killoran |
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x... login required. |
Details... |
2.6km |
19/05/2021 |
CONDITIONAL |
Cooleeney and Derryfadda , Moyne , Thurles Co. Tipperary |
building (3657 sq m) with a car park and access road, commercial yard area and access road, truck prep building (110 sq m), 2 m high boundary architectural fence, signage, public lighting, solar panels to the building roof, an on-site waste water... login required. |
Details... |
1.3km |
27/04/2021 |
N/A |
Killoran near Templetuohy , Co. Tipperary |
alterations to previously permitted wind farm development (planning register refs 14/510138 and 15/600924 (Tipperary), 14/202, 15/629, 19/787 and 20/459 (Kilkenny) and 14/139, 19/597 and 20/386 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick in Co. Kilkenny and Graigueadrisly in Co.... login required. |
Details... |
2.8km |
25/02/2021 |
CONDITIONAL |
Killoran , Templetuohy , Thurles Co. Tipperary |
the as constructed extension to existing dwelling house and all associated site works and PERMISSION for new waste water treatment system... login required. |
Details... |