2.7km |
14/11/2024 |
N/A |
Killoran , Thurles , Co. Tipperary |
a state-of-the-art healthcare waste treatment and recycling facility and a waste transfer station. The development will include the construction of 3 no. buildings; Building 1 (total gross floor area of circa (ca.) 2,242m2 and ca. 9m tall), Building 2 (total gross floor area of ca. 229m2 and ca. 6m tall) and Building 3 (total gross floor area of ca. 68m2 and ca. 4m tall) along with associated ancillary development including rooftop solar photovoltaic panels, 1no. battery energy storage system (total gross floor area of ca. 34m2 x 2m tall) and inverter, onsite tank with bunding, vehicle parking, rainwater harvesting tank, surface wat... login required. |
Details... |
2.6km |
08/11/2024 |
N/A |
Killoran , Thurles , Co. Tipperary |
proposed state-of-the-art waste treatment unit and recycling facility and waste transfer station - the proposed development will disinfect and recycle healthcare waste, in addition, the other hazardous waste will be consolidated onsite for export... login required. |
Details... |
2.4km |
13/08/2024 |
CONDITIONAL |
Cooleeney , Moyne , Thurles Co. Tipperary |
the construction of an agricultural shed to consist of 6 no. robotic milking units, ancillary rooms, underground slatted slurry and soiled water storage tanks and all associated siteworks... login required. |
Details... |
2.6km |
15/04/2024 |
N/A |
Crosspatrick , Johnstown , Co. Kilkenny |
PERMISSION to retain indefinitely the following structures as constructed on site:- (A) 4 bay extension constructed to the rear of the existing workshop, including rear canopy (B) Roadmaster Ready-Built Unit erected on site (C) Store extension constructed to the East side of the existing workshop (D) Sanding hut constructed to the West side of the workshop extension (E) Cement... login required. |
Details... |
2.8km |
28/08/2023 |
CONDITIONAL |
Scared Heart Nursing Home , Crosspatrick , Co. Kilkenny |
for the construction of a single story extension to existing nursing home, to include 25 no. additional bedrooms, associated bathroom facilities and ancillary areas to include sitting rooms, sluice ro... login required. |
Details... |
2.8km |
28/04/2023 |
CONDITIONAL |
Killoran , Thurles , Co. Tipperary |
development consisting of Workshop Building (1242m2), Truck Washout Building (64m2), commercial yard area, new boundary fence and entrance gates, an on-site Wastewater Treatment System and associated polishing filter bed perc... login required. |
Details... |
240m |
25/02/2022 |
CONDITIONAL |
Clonsaul , Johnstown , Co Kilkenny |
for a single-storey dwellinghouse, garage, septic tank with percolation area, entrance and all associated site works... login required. |
Details... |
1.9km |
10/12/2021 |
CONDITIONAL |
Baunmore , Johnstown , Co. Kilkenny |
to build new single storey dwelling, garage, septic tank with effluent treatment system, site entrance and associated site works on lands at ... login required. |
Details... |
2.8km |
22/11/2021 |
CONDITIONAL |
The Islands , Urlingford , Co Kilkenny |
to construct a livestock underpass, effluent holding tank and all associated site works... login required. |
Details... |
2.8km |
13/08/2021 |
CONDITIONAL |
Inchirourke , Urlingford , Thurles |
build a dwelling, domestic garage, entrance, bore well, install waste water treatment system including associated site works... login required. |
Details... |
2.7km |
11/08/2021 |
CONDITIONAL |
Cooleeney , Moyne , Thurles Co. Tipperary |
construction of 2 no. livestock underpasses and effluent holding tanks and all associated siteworks... login required. |
Details... |
2km |
30/07/2021 |
CONDITIONAL |
Cooleeny , Derryfadda and Killoran , Co. Tipperary |
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 ... login required. |
Details... |
2.8km |
21/07/2021 |
N/A |
Inchirourke , Urlingford , Thurles |
a dwelling, domestic garage, entrance, bore well, install waste water treatment system including associated site works... login required. |
Details... |
2km |
21/07/2021 |
N/A |
DerryFadda , Cooleeny , Killoran |
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x... login required. |
Details... |
2.1km |
19/05/2021 |
CONDITIONAL |
Cooleeney and Derryfadda , Moyne , Thurles Co. Tipperary |
building (3657 sq m) with a car park and access road, commercial yard area and access road, truck prep building (110 sq m), 2 m high boundary architectural fence, signage, public lighting, solar panels to the building roof, an on-site waste water... login required. |
Details... |
2.7km |
27/04/2021 |
N/A |
Killoran near Templetuohy , Co. Tipperary |
alterations to previously permitted wind farm development (planning register refs 14/510138 and 15/600924 (Tipperary), 14/202, 15/629, 19/787 and 20/459 (Kilkenny) and 14/139, 19/597 and 20/386 (Laois)) where the permitted development also extends into the townland of Bruckana, Baunmore and Rathpatrick in Co. Kilkenny and Graigueadrisly in Co.... login required. |
Details... |
2.7km |
15/03/2021 |
CONDITIONAL |
Bayswell , Johnstown , via Thurles |
for the erection of: a new milking parlour, dairy, plant room, collection yard & dairy washings / slurry storage tank and any ancillary concrete works on our lands... login required. |
Details... |