2km |
14/10/2024 |
N/A |
Clonganhue , Cappawhite , Co. Tipperary |
proposed construction of an extension, consisting of bedroom to the west gable of existing dwelling and all associated site works... login required. |
Details... |
2km |
23/09/2024 |
N/A |
Clonganhue , Cappawhite , Co. Tipperary |
the construction of an extension consisting on a bedroom to the west gable of the existing dwelling and all associated site works ... login required. |
Details... |
2.4km |
23/08/2024 |
N/A |
Soloheadbeg (Solloghodbed townland) , Donohill , Co. Tipperary |
the partially constructed dwelling house on site (which was previously permitted under expired planning reference 08-726) together with hardcore areas to front of site and around the house. PERMISSION is also being sought... login required. |
Details... |
1.6km |
19/07/2024 |
CONDITIONAL |
Clonbrick , Monard , Co. Tipperary |
for the following: Provision of first floor accommodation; Site entrance as constructed and Planning Permission for construction of a sand polishing filter to serve the existing wastewater treatment unit and all associated site and ancillary works... login required. |
Details... |
2.6km |
11/04/2024 |
CONDITIONAL |
Capparattin , Donohill , Co.Tipperary |
the previously constructed development including extensions and alterations to the house, a garden/storage shed and the installation of a waste water treatment system. W... login required. |
Details... |
1.2km |
27/03/2024 |
CONDITIONAL |
Knockphelagh , Monard , Co. Tipperary |
the construction of a dwelling, site entrance, domestic garage, on-site effluent treatment system, and all associated site development works... login required. |
Details... |
2.6km |
29/02/2024 |
N/A |
Capparattin , Donohill , Co. Tipperary |
for the previously constructed development including extensions and alterations to house, a garden/storage shed and the installation of a new waste water treatment system. We also seek Planning Permission to construct a new extension to the side of house with all associated site works... login required. |
Details... |
1.4km |
26/02/2024 |
CONDITIONAL |
Knockphelagh , Monard , Co. Tipperary |
change of layout of layout and house type previously granted under planning ref 20388 ... login required. |
Details... |
1.4km |
12/02/2024 |
N/A |
Knockphelagh , Monard , Co. Tipperary |
the construction of a new dwelling house and domestic garage (change of layout and house design granted under planning ref 20388) ... login required. |
Details... |
2.6km |
25/01/2024 |
CONDITIONAL |
Monahalla (Monahilla) , Oola , Co. Limerick. |
the construction of an extension to the side and rear of our dwelling house, to include a privacy/screen wall attached to the front of the dwelling house and all ancillary site works... login required. |
Details... |
2.7km |
05/01/2024 |
CONDITIONAL |
Kyle and Kyleagarry , Gortdrum , Co. Tipperary |
construction of an extension to the solar PV development permitted under planning application ref: PR 22/165 comprising the erection of photovoltaic panels laid out in arrays over a development area of ca. 17.44ha along with ancillary development including: 13 no. inverters (ca. 15.25m2 x 2.6m), 7 no. CCTV cameras mounted on 4m ... login required. |
Details... |
2.6km |
27/09/2023 |
CONDITIONAL |
Moanahila , Oola , Co. Limerick |
the construction of a single storey extension to existing dwelling house, installation of a new upgraded domestic wastewater treatment system with polishing filter, erection of recessed wing walls to improve existing vehicular entrance, together with all associated site works... login required. |
Details... |
850m |
10/03/2023 |
CONDITIONAL |
Cauteen , Donohill , Co. Tipperary |
existing cattle shed with slatted tank as constructed and Permission for the construction of a storage barn to the rear of the site together with all associated site works... login required. |
Details... |
1.3km |
21/12/2022 |
CONDITIONAL |
Seskin , Co. Tipperary |
(i) alterations to site entrance, (ii) the boundary wall and piers to the south and west of the site, (iii) the internal wall to facilitate the ESB services, (iv) the hardcore gravel area, (v) the shed and storage container on site and associated site works ... login required. |
Details... |
420m |
16/08/2022 |
CONDITIONAL |
Barnanalleen , Moanmore and , Seskin |
a solar PV development on a 92 ha site consisting of:
- The erection of solar panels on ground-mounted galvanised steel frames, 198 no. string inverters attached to selected ground-mounted galvanised steel frames, 8 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping;
- 3 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses;
- 1 no. on-site IPP switching substation and associated works a... login required. |
Details... |
810m |
08/08/2022 |
N/A |
Barnanalleen Moanmore Seskin , Seskin , Co Tipperary |
a solar PV development on a 92 ha site consisting of: (1) The erection of solar panels on ground-mounted galvanised steel frames, 198 no. string inverters attached to selected ground-mounted galvanised steel frames, 8 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping; (2) 3 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; (3) 1 no. on-site IPP switchi... login required. |
Details... |
2.9km |
08/06/2022 |
CONDITIONAL |
Monard Lower , Monard , Co Tipperary |
the demolition of some remaining old house walls and the construction of a dwelling house, wastewater treatment system, amendments to existing field entrance with all ancillary site works ... login required. |
Details... |
2.2km |
13/05/2022 |
CONDITIONAL |
Ayle , Monard , Co. Tipperary |
the removal of an existing storage shed to facilitate the construction of a Pre-School & School Aged child care facility, use of existing hardcore stand & connection to the existing treatment plant together with all associated site works ... login required. |
Details... |
2.2km |
25/02/2022 |
CONDITIONAL |
Kyleagarry Ballyryan East and Gortdrum , Donohill |
The development will consist of the construction of Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38KV substation (ca. 114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2) along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4) w... login required. |
Details... |