1.3km |
27/03/2024 |
N/A |
Knockphelagh , Monard , Co. Tipperary |
the construction of a dwelling, site entrance, domestic garage, on-site effluent treatment system, and all associated site development works... login required. |
Details... |
1.3km |
26/02/2024 |
CONDITIONAL |
Knockphelagh , Monard , Co. Tipperary |
change of layout of layout and house type previously granted under planning ref 20388 ... login required. |
Details... |
2.6km |
14/02/2024 |
N/A |
Newtown , Donohill , Co. Tipperary |
the refurbishment and extension of existing derelict dwelling house to include the installation of effluent treatment system and associated site development works... login required. |
Details... |
1.3km |
12/02/2024 |
N/A |
Knockphelagh , Monard , Co. Tipperary |
the construction of a new dwelling house and domestic garage (change of layout and house design granted under planning ref 20388) ... login required. |
Details... |
2.7km |
25/01/2024 |
N/A |
Monahalla (Monahilla) , Oola , Co. Limerick. |
the construction of an extension to the side and rear of our dwelling house, to include a privacy/screen wall attached to the front of the dwelling house and all ancillary site works... login required. |
Details... |
2.1km |
05/01/2024 |
N/A |
Kyle and Kyleagarry , Gortdrum , Co. Tipperary |
construction of an extension to the solar PV development permitted under planning application ref: PR 22/165 comprising the erection of photovoltaic panels laid out in arrays over a development area of ca. 17.44ha along with ancillary development including: 13 no. inverters (ca. 15.25m2 x 2.6m), 7 no. CCTV cameras mounted on 4m ... login required. |
Details... |
2.6km |
27/09/2023 |
CONDITIONAL |
Moanahila , Oola , Co. Limerick |
the construction of a single storey extension to existing dwelling house, installation of a new upgraded domestic wastewater treatment system with polishing filter, erection of recessed wing walls to improve existing vehicular entrance, together with all associated site works... login required. |
Details... |
1.4km |
10/03/2023 |
CONDITIONAL |
Cauteen , Donohill , Co. Tipperary |
existing cattle shed with slatted tank as constructed and Permission for the construction of a storage barn to the rear of the site together with all associated site works... login required. |
Details... |
2.5km |
17/02/2023 |
CONDITIONAL |
Acraboy , Monard , Co. Tipperary |
(a) the construction of an all weather playing pitch (b) associated fencing and lighting (c) and including all associated site development works ... login required. |
Details... |
1.6km |
21/12/2022 |
CONDITIONAL |
Seskin , Co. Tipperary |
(i) alterations to site entrance, (ii) the boundary wall and piers to the south and west of the site, (iii) the internal wall to facilitate the ESB services, (iv) the hardcore gravel area, (v) the shed and storage container on site and associated site works ... login required. |
Details... |
390m |
16/08/2022 |
CONDITIONAL |
Barnanalleen , Moanmore and , Seskin |
a solar PV development on a 92 ha site consisting of:
- The erection of solar panels on ground-mounted galvanised steel frames, 198 no. string inverters attached to selected ground-mounted galvanised steel frames, 8 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping;
- 3 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses;
- 1 no. on-site IPP switching substation and associated works a... login required. |
Details... |
2.5km |
23/06/2022 |
CONDITIONAL |
Kyle , Solohead , Co Tipperary |
demolished cottage and permission to erect in its place a dormer type bungalow with effluent treatment tank and percolation system and all associated ancillary works... login required. |
Details... |
2.1km |
08/06/2022 |
CONDITIONAL |
Monard Lower , Monard , Co Tipperary |
the demolition of some remaining old house walls and the construction of a dwelling house, wastewater treatment system, amendments to existing field entrance with all ancillary site works ... login required. |
Details... |
2.8km |
13/05/2022 |
CONDITIONAL |
Ayle , Monard , Co. Tipperary |
the removal of an existing storage shed to facilitate the construction of a Pre-School & School Aged child care facility, use of existing hardcore stand & connection to the existing treatment plant together with all associated site works ... login required. |
Details... |
1.5km |
25/02/2022 |
CONDITIONAL |
Kyleagarry Ballyryan East and Gortdrum , Donohill |
The development will consist of the construction of Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38KV substation (ca. 114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2) along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4) w... login required. |
Details... |
1.6km |
17/02/2022 |
N/A |
Kyleagarry Ballyryan East and Gortdrum , Donohill |
The development will consist of the construction of Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38KV substation (ca. 114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2) along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4) w... login required. |
Details... |
1.6km |
08/02/2022 |
N/A |
Kyleagarry Ballyryan East and Gortdrum , Co. Tipperary |
a 10 year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38kV substation (ca.114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca.55m2), along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.... login required. |
Details... |
1.6km |
28/01/2022 |
N/A |
Kyleagarry Ballyryan East and Gortdrum , Co. Tipperary |
a10 year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38kV substation (ca.114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca.55m2), along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4... login required. |
Details... |
2.8km |
21/01/2022 |
CONDITIONAL |
Solohead Farm , Knockaneduff , Donohill |
(a) Decommission 2 no. existing slurry lagoons and a dungstead, (b) Construct an extension to the side of existing cubicle shed with new underground slatted slurry storage tanks, (c) Demolish existing straw bedded shed and constr... login required. |
Details... |