2.2km |
12/09/2024 |
CONDITIONAL |
Land c. 145m south of Seskin Road , Seskin , Co. Tipperary |
development which will consist of a 10-year planning permission to construct and complete a synchronous condenser and battery storage development with a total site area of c. 1.3 hectares comprising of 40 no. battery energy storage units, 5 no. twin skid structures, 1 no. synchronous condenser, 1 no. generator circuit breaker, 1 no. auxiliary transformer and bund, 1 no. step-up transformer and bund, 5 no. control ... login required. |
Details... |
1.7km |
23/08/2024 |
N/A |
Soloheadbeg (Solloghodbed townland) , Donohill , Co. Tipperary |
the partially constructed dwelling house on site (which was previously permitted under expired planning reference 08-726) together with hardcore areas to front of site and around the house. PERMISSION is also being sought... login required. |
Details... |
2.7km |
27/03/2024 |
CONDITIONAL |
Knockphelagh , Monard , Co. Tipperary |
the construction of a dwelling, site entrance, domestic garage, on-site effluent treatment system, and all associated site development works... login required. |
Details... |
1.8km |
29/02/2024 |
CONDITIONAL |
Acraboy , Monard , Co. Tipperary |
the extension and renovation of an existing dwelling and permission to demolish existing sun room and shed and for all associated site works... login required. |
Details... |
2.6km |
26/02/2024 |
CONDITIONAL |
Knockphelagh , Monard , Co. Tipperary |
change of layout of layout and house type previously granted under planning ref 20388 ... login required. |
Details... |
1.3km |
14/02/2024 |
CONDITIONAL |
Newtown , Donohill , Co. Tipperary |
the refurbishment and extension of existing derelict dwelling house to include the installation of effluent treatment system and associated site development works... login required. |
Details... |
2.6km |
12/02/2024 |
N/A |
Knockphelagh , Monard , Co. Tipperary |
the construction of a new dwelling house and domestic garage (change of layout and house design granted under planning ref 20388) ... login required. |
Details... |
600m |
05/01/2024 |
CONDITIONAL |
Kyle and Kyleagarry , Gortdrum , Co. Tipperary |
construction of an extension to the solar PV development permitted under planning application ref: PR 22/165 comprising the erection of photovoltaic panels laid out in arrays over a development area of ca. 17.44ha along with ancillary development including: 13 no. inverters (ca. 15.25m2 x 2.6m), 7 no. CCTV cameras mounted on 4m ... login required. |
Details... |
2.2km |
12/12/2023 |
CONDITIONAL |
Gotinstown , Tipperary , Co. Tipperary |
a dwelling extension to the side of an existing dwelling... login required. |
Details... |
2.3km |
13/09/2023 |
REFUSED |
Ballykisteen Hotel , Gotinstown , Limerick Junction |
1) to extend existing watermain network 2) Permission for Retention of a borehole/well, ancillary infrastructure and all associated site works... login required. |
Details... |
1.9km |
26/07/2023 |
CONDITIONAL |
Limerick Junction Railway Station , Limerick Junction , Co. Tipperary |
the removal of the existing metal storage containers, construction of a permanent single storey detached flat roofed modular building comprising of open plan and cellular offices with ancillary welfare facilities and... login required. |
Details... |
1.9km |
28/06/2023 |
N/A |
Limerick Junction Railway Station , Limerick Junction , Co. Tipperary |
the removal of the existing metal storage containers, construction of a permanent single storey detached flat roofed modular building comprising of open plan and cellular offices with ancillary welfare facilities and... login required. |
Details... |
1.8km |
03/05/2023 |
CONDITIONAL |
Limerick Junction , Co. Tipperary |
the upgrade of the Limerick Junction Wastewater Treatment Plant and will generally comprise the following: construction of a storm water holding tank complete with cleaning system and access stai... login required. |
Details... |
1.8km |
24/04/2023 |
N/A |
Limerick Junction , Co Tipperary |
construction of a storm water holding tank complete with cleaning system and access stairs and return pumping station; construction of a new sludge drying reed beds; sludge pump station; final effluent wash water pump station; control kiosk; and all ancillary site developments works... login required. |
Details... |
2.5km |
10/03/2023 |
CONDITIONAL |
Cauteen , Donohill , Co. Tipperary |
existing cattle shed with slatted tank as constructed and Permission for the construction of a storage barn to the rear of the site together with all associated site works... login required. |
Details... |
1.5km |
17/02/2023 |
CONDITIONAL |
Acraboy , Monard , Co. Tipperary |
(a) the construction of an all weather playing pitch (b) associated fencing and lighting (c) and including all associated site development works ... login required. |
Details... |
1.9km |
16/08/2022 |
CONDITIONAL |
Barnanalleen , Moanmore and , Seskin |
a solar PV development on a 92 ha site consisting of:
- The erection of solar panels on ground-mounted galvanised steel frames, 198 no. string inverters attached to selected ground-mounted galvanised steel frames, 8 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping;
- 3 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses;
- 1 no. on-site IPP switching substation and associated works a... login required. |
Details... |
1.5km |
08/08/2022 |
N/A |
Barnanalleen Moanmore Seskin , Seskin , Co Tipperary |
a solar PV development on a 92 ha site consisting of: (1) The erection of solar panels on ground-mounted galvanised steel frames, 198 no. string inverters attached to selected ground-mounted galvanised steel frames, 8 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping; (2) 3 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; (3) 1 no. on-site IPP switchi... login required. |
Details... |
1.9km |
05/07/2022 |
CONDITIONAL |
Ballykisteen , Gotinstown , Acraboy Knockaneduff |
an All-Weather Horse Race Track integrated around the existing turf track to include: new 2.2km long sand based track ranging in width from 14-18m including 3 furlong sprint chute extension, 3.2m wide Gallop inc. all assoc. site infrastructure such as railings, start locations and other ancillary infrastructure, new Underpass to All Weather and Turf Track, surface water drainage system to new track inc. storm water attenuation pond and storm water retention pond located inside the existing turf track, attenuation pond to the NW of the new all-weather track, modifications to existing turf track to facilitate new track, dedicated 3.0 to 3.5m wide circulation track to perimeter of new track for movement of emergency and service vehicles, new underpass for movement of vehicles from outer to inner track areas, treatment and upgrade to existing site boundaries, demolition of existing stable block (60 stables) and erection of new stable blocks comprising of 82 stables and assoc. works, demolition of Ancillary Building of 18m2, removal of existing parade ring (1,265m2) and construction of new parade ring (1,565m2) and assoc. works, demolition of maintenance shed of 180m2 and construction of new maintenance shed of 360m2, provision... login required. |
Details... |
990m |
23/06/2022 |
CONDITIONAL |
Kyle , Solohead , Co Tipperary |
demolished cottage and permission to erect in its place a dormer type bungalow with effluent treatment tank and percolation system and all associated ancillary works... login required. |
Details... |