  Barnanalleen and Lisheennamalausa , Co. Tipperary

Jul 28 2021

Application Received

Sep 17 2021

Further Info. Requested

Nov 15 2021

Further Info. Received

Jan 17 2022

Decision

Jan 18 2022

Decision Due

Feb 20 2022

Granted

Feb 19 2027

Expiry (if required)
  • Submitted to Tipperary County Council, 28 / 07 / 2021
  • Application Type: PERMISSION
  • Current Status: APPLICATION FINALISED
  • Decision Text: CONDITIONAL
  • Decision Summary: Granted
-- View Live Map (full screen map - includes planning application boundaries, zonings & other planning-related mapped content)

-- Signup Now to link to Commencement Notice details
Development:
a 10 year planning permission for a solar development on a 39 ha site consisting of: Three site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; Upgrading of existing laneway to permit access to a proposed substation site (the proposed substation and associated works are currently the subject of a Strategic Infrastructure Development Pre- Application Consultation with An Bord Pleanala); Security fencing around the proposed su... Signup to read full development description
An Bord Pleanála Information:
Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

  • Distance: Received: Decision: Development Address: Development Description:
    1.7km 27/03/2024 N/A Knockphelagh , Monard , Co. Tipperary the construction of a dwelling, site entrance, domestic garage, on-site effluent treatment system, and all associated site development works... login required. Details...
    1.7km 26/02/2024 CONDITIONAL Knockphelagh , Monard , Co. Tipperary change of layout of layout and house type previously granted under planning ref 20388 ... login required. Details...
    2.1km 14/02/2024 N/A Newtown , Donohill , Co. Tipperary the refurbishment and extension of existing derelict dwelling house to include the installation of effluent treatment system and associated site development works... login required. Details...
    1.7km 12/02/2024 N/A Knockphelagh , Monard , Co. Tipperary the construction of a new dwelling house and domestic garage (change of layout and house design granted under planning ref 20388) ... login required. Details...
    1.7km 05/01/2024 N/A Kyle and Kyleagarry , Gortdrum , Co. Tipperary construction of an extension to the solar PV development permitted under planning application ref: PR 22/165 comprising the erection of photovoltaic panels laid out in arrays over a development area of ca. 17.44ha along with ancillary development including: 13 no. inverters (ca. 15.25m2 x 2.6m), 7 no. CCTV cameras mounted on 4m ... login required. Details...
    2.9km 03/05/2023 CONDITIONAL Limerick Junction , Co. Tipperary the upgrade of the Limerick Junction Wastewater Treatment Plant and will generally comprise the following: construction of a storm water holding tank complete with cleaning system and access stai... login required. Details...
    2.9km 24/04/2023 N/A Limerick Junction , Co Tipperary construction of a storm water holding tank complete with cleaning system and access stairs and return pumping station; construction of a new sludge drying reed beds; sludge pump station; final effluent wash water pump station; control kiosk; and all ancillary site developments works... login required. Details...
    1.5km 10/03/2023 CONDITIONAL Cauteen , Donohill , Co. Tipperary existing cattle shed with slatted tank as constructed and Permission for the construction of a storage barn to the rear of the site together with all associated site works... login required. Details...
    2.2km 17/02/2023 CONDITIONAL Acraboy , Monard , Co. Tipperary (a) the construction of an all weather playing pitch (b) associated fencing and lighting (c) and including all associated site development works ... login required. Details...
    2km 21/12/2022 CONDITIONAL Seskin , Co. Tipperary (i) alterations to site entrance, (ii) the boundary wall and piers to the south and west of the site, (iii) the internal wall to facilitate the ESB services, (iv) the hardcore gravel area, (v) the shed and storage container on site and associated site works ... login required. Details...
    760m 16/08/2022 CONDITIONAL Barnanalleen , Moanmore and , Seskin a solar PV development on a 92 ha site consisting of: - The erection of solar panels on ground-mounted galvanised steel frames, 198 no. string inverters attached to selected ground-mounted galvanised steel frames, 8 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping; - 3 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; - 1 no. on-site IPP switching substation and associated works a... login required. Details...
    460m 08/08/2022 N/A Barnanalleen Moanmore Seskin , Seskin , Co Tipperary a solar PV development on a 92 ha site consisting of: (1) The erection of solar panels on ground-mounted galvanised steel frames, 198 no. string inverters attached to selected ground-mounted galvanised steel frames, 8 no. transformer units, underground cabling, security fencing, CCTV system with pole mounted cameras and landscaping; (2) 3 no. site entrances with access gates utilizing existing farm field entrances which will be upgraded and internal accesses; (3) 1 no. on-site IPP switchi... login required. Details...
    2.9km 05/07/2022 CONDITIONAL Ballykisteen , Gotinstown , Acraboy Knockaneduff an All-Weather Horse Race Track integrated around the existing turf track to include: new 2.2km long sand based track ranging in width from 14-18m including 3 furlong sprint chute extension, 3.2m wide Gallop inc. all assoc. site infrastructure such as railings, start locations and other ancillary infrastructure, new Underpass to All Weather and Turf Track, surface water drainage system to new track inc. storm water attenuation pond and storm water retention pond located inside the existing turf track, attenuation pond to the NW of the new all-weather track, modifications to existing turf track to facilitate new track, dedicated 3.0 to 3.5m wide circulation track to perimeter of new track for movement of emergency and service vehicles, new underpass for movement of vehicles from outer to inner track areas, treatment and upgrade to existing site boundaries, demolition of existing stable block (60 stables) and erection of new stable blocks comprising of 82 stables and assoc. works, demolition of Ancillary Building of 18m2, removal of existing parade ring (1,265m2) and construction of new parade ring (1,565m2) and assoc. works, demolition of maintenance shed of 180m2 and construction of new maintenance shed of 360m2, provision... login required. Details...
    2.1km 23/06/2022 CONDITIONAL Kyle , Solohead , Co Tipperary demolished cottage and permission to erect in its place a dormer type bungalow with effluent treatment tank and percolation system and all associated ancillary works... login required. Details...
    1.9km 08/06/2022 CONDITIONAL Monard Lower , Monard , Co Tipperary the demolition of some remaining old house walls and the construction of a dwelling house, wastewater treatment system, amendments to existing field entrance with all ancillary site works ... login required. Details...
    1.1km 25/02/2022 CONDITIONAL Kyleagarry Ballyryan East and Gortdrum , Donohill The development will consist of the construction of Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38KV substation (ca. 114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2) along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4) w... login required. Details...
    1.3km 17/02/2022 N/A Kyleagarry Ballyryan East and Gortdrum , Donohill The development will consist of the construction of Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38KV substation (ca. 114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2) along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4) w... login required. Details...
    2.8km 17/02/2022 CONDITIONAL Solloghodbeg , Donohill To demolish existing dwelling house and for permission to construct new dwelling house, waste water treatment system, soil polishing filter and associated site works ... login required. Details...
    1.2km 08/02/2022 N/A Kyleagarry Ballyryan East and Gortdrum , Co. Tipperary a 10 year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38kV substation (ca.114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca.55m2), along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.... login required. Details...
    1.2km 28/01/2022 N/A Kyleagarry Ballyryan East and Gortdrum , Co. Tipperary a10 year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38kV substation (ca.114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca.55m2), along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4... login required. Details...
  • Geology & Groundwater
    Creative Commons LicenseContains Irish Public Sector Data (Geological Survey) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence.

    Aquifer:
    • Category: Pl
    • Description: Poor Aquifer - Bedrock which is Generally Unproductive except for Local Zones

    Vulnerability:
    • Unit Name: Transition Beds
    • Description: Sandstone, limestone, calcareous shale
    • Labels: CDTRAB / TB

    Bedrock:
    • Low ( L)

    Planning & Development

    Zoning:
    Creative Commons LicenseZoning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
    • No Results...

    National Parks & Wildlife (NPWS)
    Creative Commons LicenseNPWS Data is published by National Parks and Wildlife Service, Department of Arts, Heritage and the Gaeltacht and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    Special Area of Conservation:
    • No Results...

    Special Protection Areas:
    • No Results...

    Natural Heritage Areas:
    • No Results...

    Proposed Natural Heritage Areas:
    • No Results...

    Heritage & Conservation
    Creative Commons LicenseMonument & NIAH Building Data is published by National Monuments Service, Department of Arts, Heritage, Regional, Rural and Gaeltacht Affairs and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    National Monuments:

    National Monuments within 100m of the mapped planning point

    • No Results...

    National Monument Zones of Notification:

    Is this Planning Point is within a National Monument Zones of Notification? (Section 12 National Monuments Acts 1930 to 2004)

    • No Results...
    National Inventory of Architectural Heritage:

    NIAH Locations within 100m of the mapped planning point

    Name NIAH Ref # Rating / Period Original Use Current Use Protected Structure
    No Results...

    Roads & Infrastructure

    National Roads & Motorways within 500m of mapped planning point


    National Roads (N) and Motorways (M):
    • No Results...