2.9km |
14/11/2024 |
N/A |
Garrykennedy , Portroe , Nenagh Co. Tipperary |
the extension and conversion of existing stables to a two bedroom short term holiday rental house, including constructing a waste water treatment system, percolation area and all other ancillary site works... login required. |
Details... |
2.9km |
11/11/2024 |
N/A |
Garrykennedy , Portroe , Nenagh Co. Tipperary |
to extend and convert existing Stables to a two bedroom short term holiday rental house and it will include constructing a waste water treatment system, percolation area and all other ancillary site works... login required. |
Details... |
1.3km |
03/10/2024 |
N/A |
Cooneen , Portroe , Co Tipperary |
single storey dwelling, treatment plant, entrance and all ancillary works... login required. |
Details... |
2.9km |
30/09/2024 |
N/A |
Garrykennedy , Portroe , Nenagh Co. Tipperary |
the extension and conversion of the existing stables to a two bedroom short term holiday rental house including construction of a waste water treatment system, percolation area and all other ancillary site works... login required. |
Details... |
1.2km |
30/08/2024 |
N/A |
Castletown Glebe , Castetown , Portroe |
1. ) Existing main house (371 sq.m) reconfiguration of rooms on all three levels including moving kitchen to entrance level. New bathrooms on basement and entrance levels. Existing 1990's extension to have a new window, new rooflight and enlarged gable window with new access to a new terrace (10 sq.m) 2.) Existing outb... login required. |
Details... |
1.9km |
31/07/2024 |
CONDITIONAL |
Landsdown Portroe , Nenagh , Co. Tipperary |
hobby room and external patio to the rear of the property along with all ancillary works... login required. |
Details... |
1km |
04/07/2024 |
N/A |
Castletown , Portroe Nenagh , Co. Tipperary |
the construction of a storage shed with hobby space along with all ancillary site works... login required. |
Details... |
1.3km |
22/05/2024 |
N/A |
Castletown , Portroe Nenagh , Co. Tipperary |
New dwelling house, access driveway, wastewater treatment system and associated site works and services... login required. |
Details... |
1km |
27/03/2024 |
N/A |
Castlelough/Castletown , Portroe , Nenagh |
domestic garage with loft and domestic store as constructed... login required. |
Details... |
1.5km |
22/03/2024 |
CONDITIONAL |
Laghtea , Ballina , Co. Tipperary |
a side extension, extension to front porch and alterations to existing dwelling and all ancillary works... login required. |
Details... |
1.4km |
12/02/2024 |
CONDITIONAL |
Laghtea , Portroe , Nenagh |
domestic car port and stores as constructed... login required. |
Details... |
2.9km |
29/12/2023 |
CONDITIONAL |
Shesharoe House , Portroe , Co. Tipperary |
i) reconfiguration of internal rooms of the rear extension, ii) the provision of a small porch extension to the rear only, iii) the enlarging of a window ope on the south gable elevation to allow for a new side door, ... login required. |
Details... |
2.1km |
22/12/2023 |
CONDITIONAL |
Laghtea , Portroe , Nenagh |
to renovate and extend existing cottage, construct a domestic storage shed, install a new waste water treatment system along with all ancillary site works... login required. |
Details... |
2.9km |
19/12/2023 |
N/A |
Shesharoe House , Portroe , Co. Tipperary |
i) reconfiguration of internal rooms of the rear extension, ii) the provision of a small porch extension to the rear only, iii) the enlarging of a window ope on the south gable elevation to allow for a new side door, ... login required. |
Details... |
1km |
22/11/2023 |
N/A |
Castletown/Castlelough , Portroe , Nenagh |
domestic store as constructed... login required. |
Details... |
990m |
29/09/2023 |
N/A |
Castletown/Castlelough , Portroe , Nenagh |
domestic store as constructed... login required. |
Details... |
1.5km |
14/09/2023 |
CONDITIONAL |
Ballingeer , Portroe , Co. Tipperary |
a dwelling, entrance, garage, sewage treatment system and all ancillary works... login required. |
Details... |
1.1km |
22/08/2023 |
CONDITIONAL |
Castlelough , Portroe , Nenagh Co. Tipperary |
revised site boundaries complete with all ancillary site works associated with the development and PERMISSION to refurbish and extend existing dwelling house by adding a two-bedroom extension to the east side, an extended dining area to the west side and an extended kitchen area to the front south side, a... login required. |
Details... |
1.9km |
21/08/2023 |
CONDITIONAL |
Townlough Lower , Ballina , Co. Tipperary |
extension of existing dwelling house along with all ancillary site works... login required. |
Details... |
1.1km |
04/08/2023 |
N/A |
Castlelough , Portroe , Nenagh Co. Tipperary |
revised site boundaries complete with all ancillary site works associated with the development and PERMISSION to refurbish and extend existing dwelling house by adding a two-bedroom extension to the east side, an extended dining area to the west side and an extended kitchen area to the front south side, a... login required. |
Details... |