770m |
30/08/2024 |
N/A |
Castletown Glebe , Castetown , Portroe |
1. ) Existing main house (371 sq.m) reconfiguration of rooms on all three levels including moving kitchen to entrance level. New bathrooms on basement and entrance levels. Existing 1990's extension to have a new window, new rooflight and enlarged gable window with new access to a new terrace (10 sq.m) 2.) Existing outb... login required. |
Details... |
1.2km |
14/08/2024 |
N/A |
Curragh Portroe , Nenagh , Co. Tipperary |
a new entrance to serve two no. houses and to remove existing entrance... login required. |
Details... |
1.2km |
09/08/2024 |
N/A |
Curragh Portroe , Nenagh , Co. Tipperary |
a new entrance to serve two no. houses and remove the existing entrance... login required. |
Details... |
2.4km |
04/07/2024 |
N/A |
Castletown , Portroe Nenagh , Co. Tipperary |
the construction of a storage shed with hobby space along with all ancillary site works... login required. |
Details... |
2.9km |
21/06/2024 |
N/A |
Garrykennedy , Portroe , Co. Tipperary |
construction of (i) 4 no. detached houses in a cluster of 2 no. x single story dwellings , 2 no. part 2 story/ part dormer dwellings, (ii) 4 no. individual garage... login required. |
Details... |
2.9km |
12/06/2024 |
N/A |
Garrykennedy , Portroe , Co. Tipperary |
construction of (i) 4 no. detached houses in a cluster of 2 no. x single story dwellings, 2 no. part 2 story/part dormer dwellings, (ii) 4 no. individual garage ... login required. |
Details... |
2.3km |
22/05/2024 |
N/A |
Castletown , Portroe Nenagh , Co. Tipperary |
New dwelling house, access driveway, wastewater treatment system and associated site works and services... login required. |
Details... |
2.2km |
08/05/2024 |
CONDITIONAL |
No. 12 Glencrue , Portroe , Nenagh |
extensions to front, side and rear of existing dwelling, external finishes to existing dwelling and to retain 3 No. existing domestic sheds/stores at rear of site, all as constructed... login required. |
Details... |
1.6km |
30/03/2024 |
CONDITIONAL |
Garrykennedy , Portroe , Nenagh |
the erection of lighting to the walking track consisting of 6m high lighting standards with led lighting to same with all associated site works... login required. |
Details... |
2.9km |
27/03/2024 |
CONDITIONAL |
Garrykennedy , Portroe , Nenagh |
construction of garage along with all ancillary site works... login required. |
Details... |
1.2km |
27/03/2024 |
N/A |
Castlelough/Castletown , Portroe , Nenagh |
domestic garage with loft and domestic store as constructed... login required. |
Details... |
2.9km |
27/03/2024 |
N/A |
Garrykennedy , Portroe Nenagh , Co. Tipperary. |
a boathouse, access track, modification to existing gated entrance and roadside boundary fence and all associated site works. The planning application is accompanied by an NIS (Natura Impact Statement)... login required. |
Details... |
2.1km |
22/03/2024 |
CONDITIONAL |
Laghtea , Ballina , Co. Tipperary |
a side extension, extension to front porch and alterations to existing dwelling and all ancillary works... login required. |
Details... |
680m |
08/03/2024 |
REFUSED |
Landsdown , Portroe , Nenagh Co. Tipperary E45X462 |
to renovate existing dilapidated house including: reroofing, alterations, energy efficiency, rear extension, improvements to existing road entrance, decommissioning and replacement of existing wastewater treatment system together with all ancillary works... login required. |
Details... |
2km |
26/02/2024 |
CONDITIONAL |
No. 3 Glencrue , Portroe , Nenagh Co Tipperary |
an extension to the side of existing house along with all ancillary site works... login required. |
Details... |
670m |
21/02/2024 |
N/A |
Landsdown , Portroe , Nenagh |
renovation of existing dilapidated house including: reroofing, alterations, energy efficiency, rear extension, improvements to existing road entrance, decommissioning and replacement of existing wastewater treatment system together with all ancillary works... login required. |
Details... |
680m |
16/02/2024 |
N/A |
Landsdown , Portroe , Nenagh |
renovation of existing dilapidated house including: reroofing, alterations, energy efficiency, rear extension, improvements to existing road entrance, decommissioning and replacement of existing wastewater treatment system together with all ancillary works... login required. |
Details... |
2km |
12/02/2024 |
CONDITIONAL |
Laghtea , Portroe , Nenagh |
domestic car port and stores as constructed... login required. |
Details... |
1.3km |
29/12/2023 |
CONDITIONAL |
Shesharoe House , Portroe , Co. Tipperary |
i) reconfiguration of internal rooms of the rear extension, ii) the provision of a small porch extension to the rear only, iii) the enlarging of a window ope on the south gable elevation to allow for a new side door, ... login required. |
Details... |