2.5km |
14/11/2024 |
N/A |
Garrykennedy , Portroe , Nenagh Co. Tipperary |
the extension and conversion of existing stables to a two bedroom short term holiday rental house, including constructing a waste water treatment system, percolation area and all other ancillary site works... login required. |
Details... |
2.5km |
11/11/2024 |
N/A |
Garrykennedy , Portroe , Nenagh Co. Tipperary |
to extend and convert existing Stables to a two bedroom short term holiday rental house and it will include constructing a waste water treatment system, percolation area and all other ancillary site works... login required. |
Details... |
220m |
03/10/2024 |
N/A |
Cooneen , Portroe , Co Tipperary |
single storey dwelling, treatment plant, entrance and all ancillary works... login required. |
Details... |
2.5km |
30/09/2024 |
N/A |
Garrykennedy , Portroe , Nenagh Co. Tipperary |
the extension and conversion of the existing stables to a two bedroom short term holiday rental house including construction of a waste water treatment system, percolation area and all other ancillary site works... login required. |
Details... |
2km |
14/08/2024 |
CONDITIONAL |
Curragh Portroe , Nenagh , Co. Tipperary |
a new entrance to serve two no. houses and to remove existing entrance... login required. |
Details... |
1.9km |
09/08/2024 |
N/A |
Curragh Portroe , Nenagh , Co. Tipperary |
a new entrance to serve two no. houses and remove the existing entrance... login required. |
Details... |
770m |
31/07/2024 |
CONDITIONAL |
Landsdown Portroe , Nenagh , Co. Tipperary |
hobby room and external patio to the rear of the property along with all ancillary works... login required. |
Details... |
1.6km |
04/07/2024 |
N/A |
Castletown , Portroe Nenagh , Co. Tipperary |
the construction of a storage shed with hobby space along with all ancillary site works... login required. |
Details... |
1.6km |
22/05/2024 |
N/A |
Castletown , Portroe Nenagh , Co. Tipperary |
New dwelling house, access driveway, wastewater treatment system and associated site works and services... login required. |
Details... |
2.8km |
08/05/2024 |
CONDITIONAL |
No. 12 Glencrue , Portroe , Nenagh |
extensions to front, side and rear of existing dwelling, external finishes to existing dwelling and to retain 3 No. existing domestic sheds/stores at rear of site, all as constructed... login required. |
Details... |
780m |
27/03/2024 |
N/A |
Castlelough/Castletown , Portroe , Nenagh |
domestic garage with loft and domestic store as constructed... login required. |
Details... |
1.4km |
22/03/2024 |
CONDITIONAL |
Laghtea , Ballina , Co. Tipperary |
a side extension, extension to front porch and alterations to existing dwelling and all ancillary works... login required. |
Details... |
1.4km |
08/03/2024 |
REFUSED |
Landsdown , Portroe , Nenagh Co. Tipperary E45X462 |
to renovate existing dilapidated house including: reroofing, alterations, energy efficiency, rear extension, improvements to existing road entrance, decommissioning and replacement of existing wastewater treatment system together with all ancillary works... login required. |
Details... |
2.7km |
26/02/2024 |
CONDITIONAL |
No. 3 Glencrue , Portroe , Nenagh Co Tipperary |
an extension to the side of existing house along with all ancillary site works... login required. |
Details... |
1.4km |
21/02/2024 |
N/A |
Landsdown , Portroe , Nenagh |
renovation of existing dilapidated house including: reroofing, alterations, energy efficiency, rear extension, improvements to existing road entrance, decommissioning and replacement of existing wastewater treatment system together with all ancillary works... login required. |
Details... |
1.4km |
16/02/2024 |
N/A |
Landsdown , Portroe , Nenagh |
renovation of existing dilapidated house including: reroofing, alterations, energy efficiency, rear extension, improvements to existing road entrance, decommissioning and replacement of existing wastewater treatment system together with all ancillary works... login required. |
Details... |
1.3km |
12/02/2024 |
CONDITIONAL |
Laghtea , Portroe , Nenagh |
domestic car port and stores as constructed... login required. |
Details... |
2km |
29/12/2023 |
CONDITIONAL |
Shesharoe House , Portroe , Co. Tipperary |
i) reconfiguration of internal rooms of the rear extension, ii) the provision of a small porch extension to the rear only, iii) the enlarging of a window ope on the south gable elevation to allow for a new side door, ... login required. |
Details... |
2.3km |
22/12/2023 |
CONDITIONAL |
Laghtea , Portroe , Nenagh |
to renovate and extend existing cottage, construct a domestic storage shed, install a new waste water treatment system along with all ancillary site works... login required. |
Details... |