2km |
06/11/2024 |
N/A |
Cooleen , Birdhill , Co Tipperary |
a new single storey house complete with a domesitc garage, effluent treatment system and a new site entrance... login required. |
Details... |
2.8km |
17/10/2024 |
N/A |
Shower , Newport , Co Tipperary |
a new two storey house complete with a domestic garage, effluent treatment system and a new site entrance... login required. |
Details... |
2.7km |
03/10/2024 |
N/A |
Birdhill , Tipperary , Co. Tipperary |
the erection of a 24m lattice telecommunications support structure on a 1.2 metre high raised foundation (providing an overall height of 25.2 metres) together with assoc... login required. |
Details... |
1.8km |
05/08/2024 |
CONDITIONAL |
Barna , Newport , Co. Tipperary |
the construction of a new dwelling, garage, wastewater treatment system, polishing filter, entrance and all associated site works... login required. |
Details... |
2.4km |
23/07/2024 |
CONDITIONAL |
Thornhill Stables , Thornhill , Birdhill |
a new farm building and an underground effluent storage tank... login required. |
Details... |
1.2km |
09/06/2024 |
CONDITIONAL |
Annaholty , Birdhill , Co. Tipperary |
alterations to existing dwelling house to include the fenestration and windows and front and rear porches, provision of external wall insulation and the rep... login required. |
Details... |
1.2km |
25/05/2024 |
N/A |
Annaholty , Birdhill , Co. Tipperary |
alterations to existing dwelling house to include the fenestration and windows and front and rear porches, provision of external wall insulation and the rep... login required. |
Details... |
1.8km |
01/02/2024 |
N/A |
Coole , Newport , Co. Tipperary |
works already carried out to now existing hard surface area and all associated works... login required. |
Details... |
2.8km |
25/01/2024 |
CONDITIONAL |
Shower , Newport , Co. Tipperary |
the demolition of existing porch, construction of a single storey extension to both sides of existing house, installation of a new upgraded domestic waste water treatment system with polishing filter, new splayed walls to improve existing vehicular entrance together with all associated site works ... login required. |
Details... |
2.8km |
25/01/2024 |
CONDITIONAL |
Cregough , Birdhill , Co. Tipperary |
a detached domestic garage/storage building, access driveway and hard standing together with all associated site and incidental works... login required. |
Details... |
2.7km |
22/12/2023 |
N/A |
Cregough , Birdhil , Co. Tipperary |
completion of detached domestic garage/storage building, access driveway and hard standing together with all associated site and incidental works... login required. |
Details... |
1.8km |
16/11/2023 |
CONDITIONAL |
Foildarrig , Newport , Co. Tipperary |
a change of house design, change of garage design, change of site boundary and site layout plan from that granted in planning ref 20-759 ... login required. |
Details... |
3km |
03/11/2023 |
CONDITIONAL |
Gortybrigane , Birdhill , Co. Tipperary |
change of house type from that permitted under file reference 2325... login required. |
Details... |
1.8km |
26/09/2023 |
N/A |
Coole , Newport , Co. Tipperary |
works already carried out to now existing hard surface area and all associated works... login required. |
Details... |
2.8km |
01/08/2023 |
CONDITIONAL |
Gortshane , Newport , Co. Tipperary |
slatted loose shed with underground effluent tank and Permission to construct slatted loose shed with underground effluent tank, roofed manure stead area and all associated site works... login required. |
Details... |
1.9km |
09/05/2023 |
N/A |
Coole , Newport , Co. Tipperary |
(a) completion of dwelling house previously built to all plate level, (b) extension to the rear of the dwelling, (c) septic tank and percolation area, (d) entrance gate and fence to the front, (e) boundary fencing to divide/separate sites and all associated works... login required. |
Details... |
2.9km |
04/04/2023 |
CONDITIONAL |
Shower , Newport , Co. Tipperary |
demolition of derelict cottage and timber shed and construction of a new single storey replacement house complete with domestic garage, effluent treatment system, an improved site entrance and also mobile home on site as living accommodation for applicants for duration of construction of the house... login required. |
Details... |
1.6km |
21/02/2023 |
CONDITIONAL |
Coole , Newport , Co.Tipperary |
part demolition of existing single storey cottage and construction of a new single storey extension and re-modelling to the entire structure to include new pitched and flat roofs an... login required. |
Details... |
3km |
03/02/2023 |
CONDITIONAL |
Gortybrigane , Birdhill , Co Tipperary |
construction of a traditional style single storey dwellinghouse, onsite wastewater treatment system and site entrance, together with associated siteworks ... login required. |
Details... |