1.1km |
06/11/2024 |
N/A |
Cooleen , Birdhill , Co Tipperary |
a new single storey house complete with a domesitc garage, effluent treatment system and a new site entrance... login required. |
Details... |
1.1km |
05/11/2024 |
N/A |
The Old Barracks , Birdhill , Co. Tipperary |
a garden seating area and all ancillary site works. The works are in the curtilage of a protected structure (Ref. no. TRPS 711)... login required. |
Details... |
1.2km |
03/10/2024 |
N/A |
Birdhill , Tipperary , Co. Tipperary |
the erection of a 24m lattice telecommunications support structure on a 1.2 metre high raised foundation (providing an overall height of 25.2 metres) together with assoc... login required. |
Details... |
1.9km |
23/07/2024 |
CONDITIONAL |
Thornhill Stables , Thornhill , Birdhill |
a new farm building and an underground effluent storage tank... login required. |
Details... |
2.3km |
14/07/2024 |
CONDITIONAL |
Coosane , Birdhill , Co. Tipperary |
(1) the conversion of the existing farm building to a two bedroom short term holiday rental cottage which will include extending the width and raising the height of the building; (2) the demol... login required. |
Details... |
2.2km |
09/06/2024 |
CONDITIONAL |
Annaholty , Birdhill , Co. Tipperary |
alterations to existing dwelling house to include the fenestration and windows and front and rear porches, provision of external wall insulation and the rep... login required. |
Details... |
2.1km |
25/05/2024 |
N/A |
Annaholty , Birdhill , Co. Tipperary |
alterations to existing dwelling house to include the fenestration and windows and front and rear porches, provision of external wall insulation and the rep... login required. |
Details... |
2.1km |
21/03/2024 |
REFUSED |
Lackenavea (Egremont) , Birdhill , Co Tipperary |
a dwelling house, entrance, wastewater treatment system and percolation area and all ancillary site works... login required. |
Details... |
2.7km |
16/03/2024 |
CONDITIONAL |
Gortnavarnogue , Newport , Tipperary |
the construction of a detached dormer dwelling, detached domestic garage, onsite wastewater treatment system, entrance from existing dwelling access, connection to necessary services together with all associated site and incidental works... login required. |
Details... |
30m |
25/01/2024 |
CONDITIONAL |
Cregough , Birdhill , Co. Tipperary |
a detached domestic garage/storage building, access driveway and hard standing together with all associated site and incidental works... login required. |
Details... |
1.1km |
21/01/2024 |
CONDITIONAL |
Birdhill , Co. Tipperary |
the construction of detached single storey dwelling, detached domestic garage, onsite wastewater treatment system, connection to necessary services together with all associated site and incidental works... login required. |
Details... |
1.1km |
17/01/2024 |
CONDITIONAL |
Main St. , Birdhill , Co. Tipperary |
change of house design and re-location of entrance, which were previously granted under PPRR 2360268... login required. |
Details... |
2.1km |
05/12/2023 |
CONDITIONAL |
Coosane , Birdhill , Tipperary |
a single storey dwelling, detached domestic garage, new access from existing farm roadway, advanced wastewater treatment system and polishing filter, connection to necessary services together with all associated site and incidental works... login required. |
Details... |
930m |
03/11/2023 |
CONDITIONAL |
Gortybrigane , Birdhill , Co. Tipperary |
change of house type from that permitted under file reference 2325... login required. |
Details... |
1.9km |
13/06/2023 |
CONDITIONAL |
Clare View Coosane , Birdhill , Co. Tipperary |
(a)proposed Part 1.5 storey/ part single storey dwelling, (b) proposed single storey garage ancillary to proposed dwelling, (c) proposed new treatment system, percolation area, (d) proposed new entrances from lane accessing onto public road and all associated site works and ancillary services... login required. |
Details... |
1.1km |
25/04/2023 |
CONDITIONAL |
Main Street , Birdhill , Co.Tipperary |
a single storey dwelling house, a new single storey garage, new hard and soft landscaping, provision of a new foul water treatment system and percolation area, new site entrance from N7 roadway, connection to existing services, boundary walls and all ancillary site works... login required. |
Details... |
1.1km |
21/04/2023 |
N/A |
Main Street , Birdhill , Co.Tipperary |
(1) the construction of a single storey dwelling house (2) a new single storey garage (3) new hard and soft landscaping (4) provision of a new foul water treatme... login required. |
Details... |
1km |
17/02/2023 |
CONDITIONAL |
Birdhill , Co. Tipperary |
to demolish existing dwelling house & shed and replace with a new dwelling house & garage, upgrade existing waste water treatment system & construct a new entrance along with all ancillary site works... login required. |
Details... |
930m |
03/02/2023 |
CONDITIONAL |
Gortybrigane , Birdhill , Co Tipperary |
construction of a traditional style single storey dwellinghouse, onsite wastewater treatment system and site entrance, together with associated siteworks ... login required. |
Details... |