1.9km |
06/08/2024 |
N/A |
Church Street , Newport , Co. Tipperary |
the change of use from domestic use to office space and all associated site works... login required. |
Details... |
1.4km |
05/08/2024 |
CONDITIONAL |
Barna , Newport , Co. Tipperary |
the construction of a new dwelling, garage, wastewater treatment system, polishing filter, entrance and all associated site works... login required. |
Details... |
590m |
18/07/2024 |
N/A |
Ballymckeogh , Newport , Co. Tipperary |
(a) the elevational changes to existing dwelling house; (b) the sunroom; (c) the partly constructed two-storey rear extension; (d) the partly constructed domestic garage. PERMISSION for the completion of the domestic garage, two-storey rear extension to dwelling house and all associated site works... login required. |
Details... |
2.8km |
26/04/2024 |
CONDITIONAL |
Tullow/Cranavaneen , Newport , Co. Tipperary |
extensions to farmyard consisting of a cattle shed with an underground slurry storage tank and also a loose shed... login required. |
Details... |
1.8km |
28/03/2024 |
CONDITIONAL |
Newport , Co Tipperary |
an extension to the front of premises consisting of a kitchen extension and a new day room... login required. |
Details... |
2.8km |
16/03/2024 |
N/A |
Gortnavarnogue , Newport , Tipperary |
the construction of a detached dormer dwelling, detached domestic garage, onsite wastewater treatment system, entrance from existing dwelling access, connection to necessary services together with all associated site and incidental works... login required. |
Details... |
1.8km |
08/03/2024 |
REFUSED |
Foxhall , Newport , Co Tipperary |
the construction of a new a single storey dwelling house, entrance, domestic garage, connection to public sewer, and ancillary works... login required. |
Details... |
1.2km |
26/01/2024 |
CONDITIONAL |
Ballymackeogh , Newport , Co. Tipperary |
demolition of a farm building and the construction of a new farm building consisting of cattle pens, a calf house, a fodder and machinery shed and an underground slurry storage tank... login required. |
Details... |
590m |
25/01/2024 |
CONDITIONAL |
Shower , Newport , Co. Tipperary |
the demolition of existing porch, construction of a single storey extension to both sides of existing house, installation of a new upgraded domestic waste water treatment system with polishing filter, new splayed walls to improve existing vehicular entrance together with all associated site works ... login required. |
Details... |
1.7km |
18/12/2023 |
CONDITIONAL |
Garryteige , Newport , Co. Tipperary |
(i) slatted feeding area with soiled water tank and underground slurry tank, (ii) calf shed, (iii) demolition of open slurry tank and all associated site works and PERMISSION for RETENTION of (i) loose / storage shed and (ii) slatted shed... login required. |
Details... |
2.8km |
06/12/2023 |
CONDITIONAL |
Gardenhill , Castleconnell , Co. Limerick |
an extension to farmyard consisting of a slatted cattle shed with an underground slurry storage tank... login required. |
Details... |
2.9km |
16/11/2023 |
CONDITIONAL |
Foildarrig , Newport , Co. Tipperary |
a change of house design, change of garage design, change of site boundary and site layout plan from that granted in planning ref 20-759 ... login required. |
Details... |
2.7km |
11/09/2023 |
CONDITIONAL |
Garden Hill , Castleconnell , Castleconnell |
(1) The restoration work to the original house, including repairs of all internal and external walls and chimney stack, repair to all rainwater goods, and the existing roof structure with new sky lights within the existing roof structure to the rear, (2) The construction of a new extension to the rear of the original house, (3) The installation of a new wast... login required. |
Details... |
1.7km |
08/06/2023 |
N/A |
Ballymackeogh Td. , Newport , Co Tipperary |
existing area as filled with Class 5 and Class 6 material and Permission to fill the existing poor quality agricultural land with inert materials comprising of Class 5 and Class 6 material (topsoil, s... login required. |
Details... |
1.6km |
01/06/2023 |
CONDITIONAL |
Foxhall , Newport , Co. Tipperary |
new roadside walls, piers and gates... login required. |
Details... |
1.8km |
11/05/2023 |
N/A |
Ballymackeogh td. , Newport , Co. Tipperary |
to fill the existing poor quality agricultural land with inert materials comprising of topsoil, subsoil, soil and stone in order to raise the level of the ground utilising existing site entrance including all ancillary site works... login required. |
Details... |
850m |
06/04/2023 |
CONDITIONAL |
Ballmackeogh , Newport , Co. Tipperary |
the widening of the existing agricultural entrance, improve sightlines and ancillary site works... login required. |
Details... |
800m |
04/04/2023 |
N/A |
Ballymackeogh , Newport , Co. Tipperary |
a new single storey house complete with a domestic garage, effluent treatment system and a new site entrance... login required. |
Details... |
220m |
04/04/2023 |
CONDITIONAL |
Shower , Newport , Co. Tipperary |
demolition of derelict cottage and timber shed and construction of a new single storey replacement house complete with domestic garage, effluent treatment system, an improved site entrance and also mobile home on site as living accommodation for applicants for duration of construction of the house... login required. |
Details... |