  Prochóg Cait, Ballynoran, Ballyhea, Co Cork

Dec 19 2023

Application Received

Feb 21 2024

Decision Due
  • Submitted to Cork County Council, 19 / 12 / 2023
  • Application Type: Permission
  • Current Status: Application Invalid
  • Decision Text: N/A
  • Decision Summary: No Decision
-- View Live Map (full screen map - includes planning application boundaries, zonings & other planning-related mapped content)

-- Signup Now to link to Commencement Notice details
Development:
Permission to construct a barbican wooden foot bridge entrance to a holiday home and garden shed. Landsca... Signup to read full development description
An Bord Pleanála Information:
Creative Commons LicensePlanning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

  • Distance: Received: Decision: Development Address: Development Description:
    2.8km 04/07/2024 N/A Castleharrison, Ballyhea, Co. Cork, Permission to construct a new dwelling house.... login required. Details...
    2.8km 14/06/2024 N/A Castleharrison, Ballyhea, Co.Cork, Permission to construct a new dwelling house... login required. Details...
    860m 25/04/2024 N/A Ardnageehy, Charleville, Co.Cork, Permission for a) a wind turbine with a maximum hub height of 85m, a maximum rotor diameter of 71m and a maximum overall blade tip height of 120.5m, b) a transformer building, c) associated site works, including temporary construction access, for energy self-supply on-lands adjacent to its existing plant. The turb... login required. Details...
    1.5km 20/12/2023 Conditional Permission Milltown, Charleville, Co.Cork, Permission to construct a new agricultural entrance & associated site works... login required. Details...
    1.2km 17/10/2023 Conditional Permission Fiddane, Cooliney, Coolcaum, Ballynoran, Ballynadrideen, Ardnageehy, Charleville, Co. Cork The development will consist of an application for a 10-year planning permission for the construction of, and 40-year operation and subsequent decommissioning of, a development consisting of a 92.75-hectare solar farm and underground grid connection route (red line boundary). The underground grid connection route will run underneath private lands and L5527, L5528 and L5529 public roads for 1km where it will connect the proposed development to the previously consented electricity grid interconnector (Cork County Council Pl. Ref 22/5933). The solar farm comprises of four separate land parcels divided by local roads. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures an... login required. Details...
    2.4km 16/10/2023 Conditional Permission Clashganniv, Springfort, Charleville, Co. Cork Permission for alterations to entrance as constructed and use of same.... login required. Details...
    2.4km 06/09/2023 N/A Clashganniv, Springfort, Charleville, Co.Cork Permission for retention of alterations to entrance as constructed... login required. Details...
    2.8km 11/08/2023 Refused Castleharrison, Ballyhea, Co Cork, Permission to construct a new dwelling house.... login required. Details...
    860m 26/05/2023 N/A Ardnageehy, Charleville, Co.Cork, Permission for; a) a wind turbine with a maximum height of 85m, a maximum rotor diameter of 71 m and a maximum overall blade tip height of 120.5m; b) a transformer building; c) associated site works, including temporary construction access, for energy self-supply on lands adjacent to its plant Ardnageehy, Charleville, Co.Cork. T... login required. Details...
    1.4km 31/01/2023 Conditional Permission Ballynadrideen, Ballyhea, Co. Cork, Permission to demolish existing dwelling and to construct new dwelling, detached domestic garage, wastewater treatment system and all associated site works. ... login required. Details...
    1km 23/12/2022 Conditional Permission Coolcaum, Churchtown, Mallow, Co.Cork Retention of (i) conversion of attic of existing dwelling to storage area including roof lights and gable window and (ii) elevational alterations to existing dwelling... login required. Details...
    1.7km 23/12/2022 Refused Ballyroe & Dromin, Ballyhea, Charleville, Co.Cork Permission to amend the design of the previously approved development (pl. ref. no 20/4041) which comprises consent for a solar PV energy development . The proposed amendments include: (1) increase in number of transformers, (2) increase in size of transformers, (3) reduction in the spacing of solar PV rows (strings), (4)increase in size of solar panels, (5) reduction ... login required. Details...
    2.1km 14/11/2022 Conditional Permission Fiddane, Ballyhea, Charleville, Co.Cork Permission to amend the design of the previously approved development (planning reference: Cork County Council 17/5799 & an Bord Pleanála ABP-306915-20)which comprises consent for a 67.8 hectare Solar PV farm at Fiddane, Ballyhea Charleville, Co.Cork. The proposed amendments include; (1) increase in number of transformers, (2) reduction in the spacing of Solar PV row... login required. Details...
    2km 27/10/2022 Conditional Permission Ballyhay, Charleville, Co. Cork, (a) Attic conversion which includes 2 no. bedrooms, bathroom and study to existing dwelling, (b) existing workshop/garage and store for private use only.... login required. Details...
    1.1km 11/10/2022 Conditional Permission Coolcaum, Churchtown, Mallow, Co.Cork Permission for retention of unauthorised developments consisting of the following : (a) dwelling and entrances as constructed including ancillary works, (b)... login required. Details...
    1.7km 23/08/2022 Conditional Permission The Townlands of Fiddane, Cooliney, Ballynoran, , Coolcaum & Ballyroe,, Charleville, Co.Cork., The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of over head line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and 4 transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (pl.ref 17/05799 & ABP-308846-20) to the consented but not built Ballyr... login required. Details...
    1.3km 29/07/2022 Conditional Permission Ardnageehy, Charleville, Co Cork, (a) single storey tray store and fresh product dispatch building (b) two storey packaging room and packaging store (c) to demolish and relocate the existing single storey pallet store (d) to relocate... login required. Details...
    920m 28/07/2022 N/A Fiddane, Cooliney, Ballynoran, Coolcaum, Ballyroe, Charleville, Co. Cork, The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of overhead line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and two transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (Pl. R... login required. Details...
    1.7km 18/07/2022 Conditional Permission Coolcaum, Churchtown, Mallow, Co.Cork A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation enclo... login required. Details...
  • Geology & Groundwater
    Creative Commons LicenseContains Irish Public Sector Data (Geological Survey) licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence.

    Aquifer:
    • Category: Rkd
    • Description: Regionally Important Aquifer - Karstified (diffuse)

    Vulnerability:
    • Unit Name: Liscarroll Limestone Formation
    • Description: Grey, cherty bioclastic limestone
    • Labels: CVLISC / LL

    Bedrock:
    • Low ( L)

    Planning & Development

    Zoning:
    Creative Commons LicenseZoning Data is published by Department of Housing, Planning and Local Government and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.
    • No Results...

    National Parks & Wildlife (NPWS)
    Creative Commons LicenseNPWS Data is published by National Parks and Wildlife Service, Department of Arts, Heritage and the Gaeltacht and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    Special Area of Conservation:
    • No Results...

    Special Protection Areas:
    • No Results...

    Natural Heritage Areas:
    • No Results...

    Proposed Natural Heritage Areas:
    • No Results...

    Heritage & Conservation
    Creative Commons LicenseMonument & NIAH Building Data is published by National Monuments Service, Department of Arts, Heritage, Regional, Rural and Gaeltacht Affairs and is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.

    National Monuments:

    National Monuments within 100m of the mapped planning point

    • No Results...

    National Monument Zones of Notification:

    Is this Planning Point is within a National Monument Zones of Notification? (Section 12 National Monuments Acts 1930 to 2004)

    • No Results...
    National Inventory of Architectural Heritage:

    NIAH Locations within 100m of the mapped planning point

    Name NIAH Ref # Rating / Period Original Use Current Use Protected Structure
    Ballynoran House 20900713 (Survey ID: SURV022) Regional, 1770 - 1810 house Same as Original N/A

    Roads & Infrastructure

    National Roads & Motorways within 500m of mapped planning point


    National Roads (N) and Motorways (M):
    • No Results...