1.7km |
25/04/2024 |
N/A |
Ardnageehy, Charleville, Co.Cork, |
Permission for a) a wind turbine with a maximum hub height of 85m, a maximum rotor diameter of 71m and a maximum overall blade tip height of 120.5m, b) a transformer building, c) associated site works, including temporary construction access, for energy self-supply on-lands adjacent to its existing plant. The turb... login required. |
Details... |
1.9km |
20/12/2023 |
Conditional Permission |
Milltown, Charleville, Co.Cork, |
Permission to construct a new agricultural entrance & associated site works... login required. |
Details... |
920m |
19/12/2023 |
N/A |
Prochóg Cait, Ballynoran, Ballyhea, Co Cork |
Permission to construct a barbican wooden foot bridge entrance to a holiday home and garden shed. Landscaped fruit bushes, vegetable garden and a hawe, apple and plum tree boundary with low environment impact.... login required. |
Details... |
1.9km |
17/10/2023 |
Conditional Permission |
Fiddane, Cooliney, Coolcaum, Ballynoran, Ballynadrideen, Ardnageehy, Charleville, Co. Cork |
The development will consist of an application for a 10-year planning permission for the construction of, and 40-year operation and subsequent decommissioning of, a development consisting of a 92.75-hectare solar farm and underground grid connection route (red line boundary). The underground grid connection route will run underneath private lands and L5527, L5528 and L5529 public roads for 1km where it will connect the proposed development to the previously consented electricity grid interconnector (Cork County Council Pl. Ref 22/5933). The solar farm comprises of four separate land parcels divided by local roads. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures an... login required. |
Details... |
1.7km |
26/05/2023 |
N/A |
Ardnageehy, Charleville, Co.Cork, |
Permission for; a) a wind turbine with a maximum height of 85m, a maximum rotor diameter of 71 m and a maximum overall blade tip height of 120.5m; b) a transformer building; c) associated site works, including temporary construction access, for energy self-supply on lands adjacent to its plant Ardnageehy, Charleville, Co.Cork. T... login required. |
Details... |
1.7km |
31/01/2023 |
Conditional Permission |
Ballynadrideen, Ballyhea, Co. Cork, |
Permission to demolish existing dwelling and to construct new dwelling, detached domestic garage, wastewater treatment system and all associated site works. ... login required. |
Details... |
440m |
23/12/2022 |
Conditional Permission |
Coolcaum, Churchtown, Mallow, Co.Cork |
Retention of (i) conversion of attic of existing dwelling to storage area including roof lights and gable window and (ii) elevational alterations to existing dwelling... login required. |
Details... |
1.5km |
23/12/2022 |
Refused |
Ballyroe & Dromin, Ballyhea, Charleville, Co.Cork |
Permission to amend the design of the previously approved development (pl. ref. no 20/4041) which comprises consent for a solar PV energy development . The proposed amendments include: (1) increase in number of transformers, (2) increase in size of transformers, (3) reduction in the spacing of solar PV rows (strings), (4)increase in size of solar panels, (5) reduction ... login required. |
Details... |
1.6km |
14/11/2022 |
Conditional Permission |
Fiddane, Ballyhea, Charleville, Co.Cork |
Permission to amend the design of the previously approved development (planning reference: Cork County Council 17/5799 & an Bord Pleanála ABP-306915-20)which comprises consent for a 67.8 hectare Solar PV farm at Fiddane, Ballyhea Charleville, Co.Cork. The proposed amendments include; (1) increase in number of transformers, (2) reduction in the spacing of Solar PV row... login required. |
Details... |
2.8km |
27/10/2022 |
Conditional Permission |
Ballyhay, Charleville, Co. Cork, |
(a) Attic conversion which includes 2 no. bedrooms, bathroom and study to existing dwelling, (b) existing workshop/garage and store for private use only.... login required. |
Details... |
480m |
11/10/2022 |
Conditional Permission |
Coolcaum, Churchtown, Mallow, Co.Cork |
Permission for retention of unauthorised developments consisting of the following : (a) dwelling and entrances as constructed including ancillary works, (b)... login required. |
Details... |
900m |
23/08/2022 |
Conditional Permission |
The Townlands of Fiddane, Cooliney, Ballynoran, , Coolcaum & Ballyroe,, Charleville, Co.Cork., |
The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of over head line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and 4 transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (pl.ref 17/05799 & ABP-308846-20) to the consented but not built Ballyr... login required. |
Details... |
2.2km |
29/07/2022 |
Conditional Permission |
Ardnageehy, Charleville, Co Cork, |
(a) single storey tray store and fresh product dispatch building (b) two storey packaging room and packaging store (c) to demolish and relocate the existing single storey pallet store (d) to relocate... login required. |
Details... |
920m |
18/07/2022 |
Conditional Permission |
Coolcaum, Churchtown, Mallow, Co.Cork |
A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation enclo... login required. |
Details... |
910m |
21/06/2022 |
N/A |
Coolcaum, Churchtown, Mallow, Co. Cork |
A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation encl... login required. |
Details... |
1.6km |
23/05/2022 |
Refused |
Rathnacally, Ballyhea, Charleville, Co.Cork |
Permission for dwelling house, entrance, septic tank and percolation area and all associated site works... login required. |
Details... |
2.9km |
27/04/2022 |
Conditional Permission |
Ardnageehy, Ballyhea, Charleville, Co.Cork |
Permission for the retention of existing extension to side of dwelling, and for existing storage sheds. Permission for the construction of pitched roof in plac... login required. |
Details... |
1.2km |
02/12/2021 |
Refused |
Annagh North, Coolcaum, Fiddane, Cooliney, Rathnacally, Farranshonikeen, Ardnageehy and Clashganniv, Co. Cork |
The development will consist of: . Construction of 6 no. wind turbines with a blade tip height of 175m, rotor diameter of 150m and a hub height of 100m; . Construction of turbine foundations and crane pad hardstanding areas; . Construction of new site tracks and associated drainage infrastructure; . Upgrading of existing tracks and associated drainage infrastructure where necessary; . Upgrade of entrance onto local road L1322; . All associated drainage and sediment control including the installation of new watercourse or drain crossing and the re-use or upgrading of existing internal watercourse and drain crossings; . Construction of 1 no. permanent onsite 38kV electrical substation to ESBN specifications including: - Control building with welfare facilities; - Electrical infrastructure; - Parking; - Wastewater holding tank; - Rainwater harvesting; - Security fencing; - All associated infrastructure, services and site works. . 1 no temporary construction site compound and associated ancillary infrastructure including parking; . Tr... login required. |
Details... |
470m |
20/05/2021 |
Conditional Permission |
Coolcaum, Churchtown, Mallow, Co. Cork |
To construct a new garden equipment storage shed with all associated site and ancillary works.... login required. |
Details... |