3km |
25/04/2024 |
N/A |
Ardnageehy, Charleville, Co.Cork, |
Permission for a) a wind turbine with a maximum hub height of 85m, a maximum rotor diameter of 71m and a maximum overall blade tip height of 120.5m, b) a transformer building, c) associated site works, including temporary construction access, for energy self-supply on-lands adjacent to its existing plant. The turb... login required. |
Details... |
2km |
19/02/2024 |
Conditional Permission |
Cherry Hill, Killabraher North, North Dromina, Charleville, Co. Cork |
Permission for retention of a dormer style dwelling and wastewater treatment system and permission for an entrance and all associated site works.... login required. |
Details... |
1.9km |
20/12/2023 |
Conditional Permission |
Milltown, Charleville, Co.Cork, |
Permission to construct a new agricultural entrance & associated site works... login required. |
Details... |
2.1km |
19/12/2023 |
N/A |
Prochóg Cait, Ballynoran, Ballyhea, Co Cork |
Permission to construct a barbican wooden foot bridge entrance to a holiday home and garden shed. Landscaped fruit bushes, vegetable garden and a hawe, apple and plum tree boundary with low environment impact.... login required. |
Details... |
3km |
15/09/2023 |
N/A |
Curraghcloonabro East, Newton, Co. Cork, |
Permission to construct a new dwelling house and detached domestic garage.... login required. |
Details... |
2.4km |
04/09/2023 |
Conditional Permission |
Killabraher South, Dromina, Co.Cork, |
Retention permission for a) 1 and 1/2 storey existing farm dwelling comprising of kitchen, dining, living, 2 no. bedrooms and a bathroom. Permission for the b) the demolition of part single storey & part 2 storey extension. c) Reconfiguration of the internal layout of the existing dwelling & proposed increased roof height,... login required. |
Details... |
2.4km |
08/08/2023 |
N/A |
Killabraher South, Dromina, Co Cork, |
Retention of a) 1 and 1/2 storey existing farm dwelling comprising kitchen, dining, living, 2 no. bedrooms and a bathroom. Permission for b) demolition of part single storey & part 2 storey extension, c) re-configuration of the internal layout of the existing dwelling & proposed increased roof height, d) The con... login required. |
Details... |
3km |
26/05/2023 |
N/A |
Ardnageehy, Charleville, Co.Cork, |
Permission for; a) a wind turbine with a maximum height of 85m, a maximum rotor diameter of 71 m and a maximum overall blade tip height of 120.5m; b) a transformer building; c) associated site works, including temporary construction access, for energy self-supply on lands adjacent to its plant Ardnageehy, Charleville, Co.Cork. T... login required. |
Details... |
2km |
23/12/2022 |
Conditional Permission |
Coolcaum, Churchtown, Mallow, Co.Cork |
Retention of (i) conversion of attic of existing dwelling to storage area including roof lights and gable window and (ii) elevational alterations to existing dwelling... login required. |
Details... |
2km |
11/10/2022 |
Conditional Permission |
Coolcaum, Churchtown, Mallow, Co.Cork |
Permission for retention of unauthorised developments consisting of the following : (a) dwelling and entrances as constructed including ancillary works, (b)... login required. |
Details... |
2.1km |
23/08/2022 |
Conditional Permission |
The Townlands of Fiddane, Cooliney, Ballynoran, , Coolcaum & Ballyroe,, Charleville, Co.Cork., |
The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of over head line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and 4 transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (pl.ref 17/05799 & ABP-308846-20) to the consented but not built Ballyr... login required. |
Details... |
2.3km |
11/08/2022 |
Conditional Permission |
Killabraher North, Newtown, Co.Cork, |
Dwelling house, detached domestic garage/store, waste water treatment system, entrance and bored well... login required. |
Details... |
1.6km |
28/07/2022 |
N/A |
Fiddane, Cooliney, Ballynoran, Coolcaum, Ballyroe, Charleville, Co. Cork, |
The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of overhead line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and two transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (Pl. R... login required. |
Details... |
2.6km |
20/07/2022 |
Conditional Permission |
Clyderragh, Newtown, Charleville, Co. Cork |
Permission to demolish two existing sheds and construct an extension to an existing cubicle house. ... login required. |
Details... |
2.1km |
18/07/2022 |
Conditional Permission |
Coolcaum, Churchtown, Mallow, Co.Cork |
A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation enclo... login required. |
Details... |
2.1km |
21/06/2022 |
N/A |
Coolcaum, Churchtown, Mallow, Co. Cork |
A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation encl... login required. |
Details... |
2.4km |
23/05/2022 |
Refused |
Rathnacally, Ballyhea, Charleville, Co.Cork |
Permission for dwelling house, entrance, septic tank and percolation area and all associated site works... login required. |
Details... |
2.3km |
26/01/2022 |
Conditional Permission |
Killabraher North, Newtown, Co .Cork, |
Construction of a dwelling house, detached domestic garage/store, wastewater treatment system, entrance and bored well.... login required. |
Details... |
770m |
02/12/2021 |
Refused |
Annagh North, Coolcaum, Fiddane, Cooliney, Rathnacally, Farranshonikeen, Ardnageehy and Clashganniv, Co. Cork |
The development will consist of: . Construction of 6 no. wind turbines with a blade tip height of 175m, rotor diameter of 150m and a hub height of 100m; . Construction of turbine foundations and crane pad hardstanding areas; . Construction of new site tracks and associated drainage infrastructure; . Upgrading of existing tracks and associated drainage infrastructure where necessary; . Upgrade of entrance onto local road L1322; . All associated drainage and sediment control including the installation of new watercourse or drain crossing and the re-use or upgrading of existing internal watercourse and drain crossings; . Construction of 1 no. permanent onsite 38kV electrical substation to ESBN specifications including: - Control building with welfare facilities; - Electrical infrastructure; - Parking; - Wastewater holding tank; - Rainwater harvesting; - Security fencing; - All associated infrastructure, services and site works. . 1 no temporary construction site compound and associated ancillary infrastructure including parking; . Tr... login required. |
Details... |