2.7km |
15/09/2024 |
CONDITIONAL |
MEENALECKY , ANNAGRY , LETTERKENNY PO |
ERECTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
02/09/2024 |
REFUSED |
ARD NA G-CEAPAIRÍ , NA DOIRÍ BEAGA , LEITIR CEANAINN |
DHÁ POD GLAMPÁLA AGUS CORÁS EISILTEACH LE SCAGAIRE SNASCAIREACHT ITHREACH A THÓGAIL ... login required. |
Details... |
460m |
07/08/2024 |
CONDITIONAL |
DORE , BUNBEG , LETTERKENNY PO |
(1) REFURBISHMENT OF EXISTING DWELLING HOUSE, TO INCLUDE PARTIAL DEMOLITION OF EXISTING DWELLING AND ALTERATIONS TO EXISTING ELEVATIONS, (2) CONSTRUCTION OF FRONT AND SIDE EXTENSIONS TO EXISTING D... login required. |
Details... |
2km |
24/07/2024 |
N/A |
KNOCKASTOLLER , BUNBEG , LETTERKENNY PO |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.4km |
03/07/2024 |
CONDITIONAL |
FÁISC MIOTAIL ÉIREANN , AONAD 27 ARD NA GCEAPPARI , AN BUN BEG |
CHUN FORBAIRT AG ÁR MONARCHAN DE SÍNEADH D'AON STÓR AR PRÍOMHFHOIRGNEAMH AN MHONARCHAN... login required. |
Details... |
2.3km |
26/06/2024 |
CONDITIONAL |
KNOCKASTOLLER , DERRYBEG , LETTERKENNY PO |
DWELLING HOUSE AND DOMESTIC GARAGE AS BUILT... login required. |
Details... |
290m |
24/06/2024 |
CONDITIONAL |
DOBHAIR , NA DOIRÍ BEAGA , LEITIR CEANAINN |
MEADÚ A CHUIR AR CHÚL AN IONAD LE ÁIT BREISE STÓRÁILE AGUS LEITHRIS... login required. |
Details... |
2.5km |
30/05/2024 |
CONDITIONAL |
MEENALECKY , ANNAGRY , CO. DONEGAL |
TEACH CÓNAITHE A THÓGÁIL CHOMH MAITH LE CÓRAS CÓIREÁLA FUÍOLLUISCE AGUS OIBREACHA BREISE SUÍOMH A DHÉANAMH... login required. |
Details... |
3km |
27/05/2024 |
CONDITIONAL |
CROLLY , CROLLY PO , CO. DONEGAL |
EXTENSION AND RENOVATION OF AN EXISTING DERELICT COTTAGE WITH PROPOSED SEWAGE TREATMENT SYSTEM, DOMESTIC SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.5km |
27/05/2024 |
N/A |
MEENALECKY , ANNAGRY , CO DONEGAL |
IS É ATÁ SAN FHORBAIRT NÁ (1) TEACH CÓNAITHE A THÓGÁIL CHOMH MAITH LE CÓRAS CÓIREÁLA FUÍOLLUISCE AGUS OIBREACHA BREISE SUÍOMH A DHÉANAMH AGUS (2) AN BEALACH CHUIG AN SUÍOMH A CHOINNEÁIL... login required. |
Details... |
2.4km |
11/03/2024 |
CONDITIONAL |
AONAD 27 PÁIRC GHNÓ GHAOTH DOBHAIR , ARD NA NCEAPAIRÍ , DOIRÍ BEAGA |
(1) ATHRUITHE INGEARCHLÓ ÓN MÉID A BHÍ CEADAITHE ROIMHE SEO FAOI TAGAIRT D'IARRATAS PLEANÁLA 19/51691, 20/51071 AGUS 22/51786, (2) SPÁS URLÁIR COIMHDEACH INMHEÁNACH BREISE, (3) LEASUITHE AR LEAGAN AMACH AN GCARRCHLÓS ÓN MÉID A BHÍ CEADAITHE ROIMHE SEO FAOI TAGAIRT D'IARRATAS PLEANÁLA 20/51071... login required. |
Details... |
1.7km |
29/02/2024 |
CONDITIONAL |
MEENALECKY , CROLLY , LETTERKENNY PO |
INSTALLATION OF A NEW TREATMENT SYSTEM AND POLISHING FILTER IN LIEU OF EXISTING SEPTIC TANK SYSTEM... login required. |
Details... |
2.2km |
16/01/2024 |
CONDITIONAL |
ARDNAGAPPERY , MAGHERACLOGHER , BUNBEG |
EXISTING SITEWORKS CARRIED OUT UNDER PLANNING REFERENCE NO. 18/51182 AND PERMISSION FOR CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK AND ALL ASSOCIATED SITEWORKS
... login required. |
Details... |
2.3km |
29/11/2023 |
N/A |
ARDNAGAPPERY , MAGHERACLOGHER BUNBEG , LETTERKENNY |
EXISTING SITEWORKS CARRIED OUT UNDER PLANNING REFERENCE NO. 18/51182. PERMISSION FOR CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK AND ALL ASSOCIATED SITEWORKS... login required. |
Details... |
2.4km |
14/11/2023 |
REFUSED |
MÍN NA LEICE , ANAGAIRE , CO. DHÚN NA NGALL |
AN BEALACH CHUIG AN SUÍOMH A CHOINNEÁIL AGUS CEAD PLEANÁLA FA CHOINNE TEACH CÓNAITHE A THÓGÁIL CHOMH MAITH LE CÓRAS CÓIREÁLA FUÍOLLUISCE AGUS OIBREACHA BREISE SUÍOMH A DHÉANAMH ... login required. |
Details... |
2km |
07/11/2023 |
CONDITIONAL |
KNOCKASTOLLER , BUNBEG , LETTERKENNY PO |
(1) CONSTRUCTION OF EXTENSION TO THE FRONT AND SIDE ELEVATION OF EXISTING DWELLING HOUSE, (2) INSTALLATION OF ONE ROOF LIGHT TO THE REAR ELEVATION AND SOLAR PANELS TO THE SOUTH ELEVATION ROOF AND (3) REPLACEMENT OF EXISTING TILE ROOF WITH SLATE FINISH AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.6km |
27/10/2023 |
CONDITIONAL |
ARDUNS , BUNBEG , LETTERKENNY PO |
(A) GROUND FLOOR AND FIRST FLOOR EXTENSIONS BUILT TO ORIGINAL DWELLING HOUSE, (B) DOMESTIC GARAGE BUILT AT THE REAR OF THE DWELLING HOUSE AND PERMISSION T... login required. |
Details... |
2.3km |
24/10/2023 |
CONDITIONAL |
KNOCKASTOLLER , BUNBEG , DONEGAL PO |
AS-CONSTRUCTED DWELLING HOUSE WITH GARAGE, SEPTIC TANK AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.1km |
17/10/2023 |
CONDITIONAL |
CROLLY , LETTERKENNY PO , CO. DONEGAL |
CONSTRUCTION OF A FRONT PORCH TO EXISTING DWELLING HOUSE... login required. |
Details... |