1.2km |
06/11/2024 |
N/A |
RANAFAST , ANNAGRY , CO. DONEGAL |
CONSTRUCTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
2.7km |
30/10/2024 |
N/A |
MEENADUFF , BUNBEG , CO. DONEGAL |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
... login required. |
Details... |
480m |
15/09/2024 |
CONDITIONAL |
MEENALECKY , ANNAGRY , LETTERKENNY PO |
ERECTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
14/08/2024 |
CONDITIONAL |
KNOCKASTOLLER , MAGHERACLOGHER , CO. DONEGAL |
EXTENSION AND ALTERATIONS TO EXISTING DWELLING INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.2km |
07/08/2024 |
CONDITIONAL |
DORE , BUNBEG , LETTERKENNY PO |
(1) REFURBISHMENT OF EXISTING DWELLING HOUSE, TO INCLUDE PARTIAL DEMOLITION OF EXISTING DWELLING AND ALTERATIONS TO EXISTING ELEVATIONS, (2) CONSTRUCTION OF FRONT AND SIDE EXTENSIONS TO EXISTING D... login required. |
Details... |
2.5km |
24/07/2024 |
N/A |
KNOCKASTOLLER , BUNBEG , LETTERKENNY PO |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.4km |
10/07/2024 |
CONDITIONAL |
ANAGAIRE , LEITIR CEANAINN , CO. DHÚN NA NGALL |
CONSTRUCTION OF A DWELLING HOUSE AND GARAGE TOGETHER WITH THE INSTALLATION OF A NEW WASTE-WATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKS... login required. |
Details... |
2.5km |
28/06/2024 |
CONDITIONAL |
DORE , MAGHERACLOGHER , CO DONEGAL |
CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.5km |
26/06/2024 |
CONDITIONAL |
KNOCKASTOLLER , DERRYBEG , LETTERKENNY PO |
DWELLING HOUSE AND DOMESTIC GARAGE AS BUILT... login required. |
Details... |
2.4km |
24/06/2024 |
CONDITIONAL |
DOBHAIR , NA DOIRÍ BEAGA , LEITIR CEANAINN |
MEADÚ A CHUIR AR CHÚL AN IONAD LE ÁIT BREISE STÓRÁILE AGUS LEITHRIS... login required. |
Details... |
0m |
27/05/2024 |
N/A |
MEENALECKY , ANNAGRY , CO DONEGAL |
IS É ATÁ SAN FHORBAIRT NÁ (1) TEACH CÓNAITHE A THÓGÁIL CHOMH MAITH LE CÓRAS CÓIREÁLA FUÍOLLUISCE AGUS OIBREACHA BREISE SUÍOMH A DHÉANAMH AGUS (2) AN BEALACH CHUIG AN SUÍOMH A CHOINNEÁIL... login required. |
Details... |
2.6km |
27/05/2024 |
CONDITIONAL |
CROLLY , CROLLY PO , CO. DONEGAL |
EXTENSION AND RENOVATION OF AN EXISTING DERELICT COTTAGE WITH PROPOSED SEWAGE TREATMENT SYSTEM, DOMESTIC SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
990m |
29/02/2024 |
CONDITIONAL |
MEENALECKY , CROLLY , LETTERKENNY PO |
INSTALLATION OF A NEW TREATMENT SYSTEM AND POLISHING FILTER IN LIEU OF EXISTING SEPTIC TANK SYSTEM... login required. |
Details... |
2.1km |
29/02/2024 |
CONDITIONAL |
ANNAGRY , LETTERKENNY , CO DONEGAL |
CONSTRUCTION OF EXTENSION AND ALTERATIONS TO EXISTING DWELLING INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.6km |
26/02/2024 |
REFUSED |
RINNAFARSET , ANNAGRY , CO. DONEGAL |
CONSTRUCTION OF A NEW COFFEE SHOP WITH ADDITIONAL CAR PARKING AND CONNECTION TO EXISTING SEWAGE TREATMENT SYSTEM... login required. |
Details... |
2.7km |
14/11/2023 |
CONDITIONAL |
LOUGHANURE , ANNAGRY , LETTERKENNY PO |
EXTENSION OF A DERELICT DWELLING AND PERMISSION FOR THE REFURBISHMENT OF THE SAME DERELICT DWELLING WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS... login required. |
Details... |
60m |
14/11/2023 |
REFUSED |
MÍN NA LEICE , ANAGAIRE , CO. DHÚN NA NGALL |
AN BEALACH CHUIG AN SUÍOMH A CHOINNEÁIL AGUS CEAD PLEANÁLA FA CHOINNE TEACH CÓNAITHE A THÓGÁIL CHOMH MAITH LE CÓRAS CÓIREÁLA FUÍOLLUISCE AGUS OIBREACHA BREISE SUÍOMH A DHÉANAMH ... login required. |
Details... |
2.8km |
07/11/2023 |
CONDITIONAL |
KNOCKASTOLLER , BUNBEG , LETTERKENNY PO |
(1) CONSTRUCTION OF EXTENSION TO THE FRONT AND SIDE ELEVATION OF EXISTING DWELLING HOUSE, (2) INSTALLATION OF ONE ROOF LIGHT TO THE REAR ELEVATION AND SOLAR PANELS TO THE SOUTH ELEVATION ROOF AND (3) REPLACEMENT OF EXISTING TILE ROOF WITH SLATE FINISH AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.9km |
24/10/2023 |
CONDITIONAL |
KNOCKASTOLLER , BUNBEG , DONEGAL PO |
AS-CONSTRUCTED DWELLING HOUSE WITH GARAGE, SEPTIC TANK AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |