2.8km |
14/03/2024 |
CONDITIONAL |
HARVEY'S POINT HOTEL , FRIARY , LOUGH ESKE ROAD |
(1) CONSTRUCTION OF A NEW SPA AND WELLNESS FACILITY CONSISTING OF A SINGLE STOREY BUILDING CONTAINING A GYM, STUDIO, SAUNA, STEAM ROOM, CHANGING ROOMS AND SUPPORT AREAS ALONG WITH AN EXTERNAL DECK INCORPORATING A HYDRO... login required. |
Details... |
2.8km |
06/03/2024 |
N/A |
HARVEY'S POINT HOTEL , FRIARY , LOUGH ESKE ROAD |
(1) CONSTRUCTION OF (A) A NEW SPA AND WELLNESS FACILITY CONSISTING OF A SINGLE STOREY BUILDING CONTAINING A GYM, STUDIO, SAUNA, STEAM ROOM, CHANGING ROOMS AND SUPPORT AREAS, ALON... login required. |
Details... |
1.8km |
07/02/2024 |
CONDITIONAL |
ARDNAWARK , BARNESMORE , CO DONEGAL |
(A) CONSTRUCTION OF AN EXTENSION TO THE SIDE AND REAR OF EXISTING DWELLING HOUSE, AND (B) DEMOLITION OF EXISTING STORAGE SHED ON SITE TO FACILITATE PROPOSED EXTENSION WORKS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.8km |
29/01/2024 |
CONDITIONAL |
HARVEY'S POINT , FRIARY LOUGH ESKE ROAD , DONEGAL TOWN |
(1) CONSTRUCTION OF AN ADDITIONAL THREE NEW BEDROOMS IN LIEU OF EXISTING ADMINISTRATION AREAS AT FIRST FLOOR DORMER LEVEL WITHIN THE EXISTING HOTEL RECEPTION BLOCK, ALONG WITH ASSOCIATED MODIFICATIONS AT GROUND FLOOR LEVEL TO FACILITATE ACCESS AND CONSTRUCTION OF 3 NEW DORMER WINDOWS, (2) CONVERSION OF EXISTING STORE AREAS WITHIN THE LOWER GROUND FLOOR LEVEL IN THE MAIN BEDROOM BLOCK TO ADMINISTRATIVE OFFICES AND BACK OF HOUSE SUPPORT... login required. |
Details... |
1.5km |
21/12/2023 |
CONDITIONAL |
TAWNAGHLAHAN , BARNESMORE , DONEGAL TOWN |
(1) DEVELOPMENT OF THE ROOF SPACE IN DWELLING HOUSE, (2) ALTERATIONS TO DWELLING HOUSE FENESTRATIONS, (3) DETACHED DOMESTIC GARAGE / FUEL STORE AND (4) ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.4km |
08/09/2023 |
CONDITIONAL |
FRIARY , LOUGH ESKE , BARNESMORE LIFFORD PO |
RETENTION AND COMPLETION OF A DWELLING HOUSE AND DETACHED DOMESTIC GARAGE (PLANNING PERMISSION REF. NO. 19/51103 REFERS) AND ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.8km |
08/05/2023 |
CONDITIONAL |
ARDNAWARK , BARNESMORE , DONEGEAL PO |
CONSTRUCTION OF A DWELLING HOUSE WITH WASTE WATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION... login required. |
Details... |
1.8km |
08/05/2023 |
CONDITIONAL |
ARDNAWARK , BARNESMORE , DONEGAL PO |
CONSTRUCTION OF A DWELLING HOUSE WITH WASTE WATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION... login required. |
Details... |
2.4km |
21/04/2023 |
CONDITIONAL |
KEADEW UPPER , BARNESMORE , DONEGAL PO |
CONSTRUCTION OF A DWELLING HOUSE WITH INTEGRAL GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1km |
14/04/2023 |
CONDITIONAL |
GARVAGH , BARNESMORE , DONEGAL PO |
CONSTRUCTION OF A NEW DWELLING HOUSE WITH A WASTEWATER TREATMENT SYSTEM AND SOIL POLISHING FILTER, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.5km |
16/12/2022 |
N/A |
KEADEW UPPER , BARNESMORE , DONEGAL PO |
CONSTRUCTION OF A DWELLING WITH INTEGRAL GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.9km |
16/12/2022 |
N/A |
CULLIONBOY , BARNESMORE , DONEGAL PO |
(1) ERECTION OF (A) UP TO 32 CONTAINERS TO HOUSE LITHIUM-ION BATTERIES OR SIMILAR TECHNOLOGY CIRCA 14.0M LENGTH, 2.44 WIDE AND 2.9 HIGH FOR ELECTRICITY STORAGE (B) A HARDSTAND COMPOUND AREA SURROUNDED BY A 2.6M HIGH PALISADE FENCE (C) BATTERY ENERGY STORAGE SYSTEM (BESS) CONTROL BUILDING (D) SYNCHRONOUS CONDENSER COMPOUND COMPRISING OF A HORIZONTAL SYNCHRONOUS GENERATOR POSITIO... login required. |
Details... |
1.4km |
05/10/2022 |
CONDITIONAL |
ARDATOWEL , DONEGAL TOWN , DONEGAL PO |
DEMOLITION OF EXISTING SUN ROOM AND CONSTRUCTION OF A SINGLE STOREY EXTENSION TO DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS ... login required. |
Details... |
1.8km |
26/07/2022 |
REFUSED |
ARDNAWARK , BARNESMORE , DONEGAL PO |
CONSTRUCTION OF A DWELLING HOUSE WITH WASTE WATER TREATMENT SYSTEM... login required. |
Details... |
1.8km |
26/07/2022 |
REFUSED |
ARDNAWARK , BARNESMORE , DONEGAL PO |
CONSTRUCTION OF DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM... login required. |
Details... |
2.8km |
24/05/2022 |
CONDITIONAL |
DRUMINNIN , DONEGAL PO , CO. DONEGAL |
CONSTRUCTION OF A SINGLE STOREY STEEL FRAMED WORKSHOP SHED, DEVELOPMENT OF STONED TURNING / PARKING AREA, WIDENING OF THE EXISTING ACCESS LANE AND ENTRANCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.2km |
06/05/2022 |
CONDITIONAL |
KEADEW UPPER , BARNESMORE , DONEGAL PO |
CHANGE OF USE OF THE EXISTING BARNESMORE COMMUNITY CENTRE TO A MONTESSORI SCHOOL AND COMMUNITY CENTRE... login required. |
Details... |
2.2km |
29/03/2022 |
N/A |
KEADEW UPPER , BARNESMORE , DONEGAL PO |
CHANGE OF USE OF THE EXISTING BARNESMORE COMMUNITY CENTER TO A MONTESSORI SCHOOL AND COMMUNITY CENTRE... login required. |
Details... |
2.1km |
24/02/2022 |
CONDITIONAL |
ARDEEVIN , BARNESMORE , DONEGAL PO |
ALTERATIONS AND RENOVATION OF EXISTING SINGLE-STOREY DWELLING, INCLUDING CHANGES TO ELEVATIONS, CONVERSION OF EXISTING ATTIC SPACE TO INCLUDE GUEST BEDROOMS, AND ERECTION OF A DETACHED DOMESTIC GARAGE INCORPORATING A WASTEWATER SEWAGE TREATMENT SYSTEM AND ALL ANCILLARY SITE DEVELOPMENT WORKS... login required. |
Details... |