1.2km |
08/11/2024 |
N/A |
FRIARY , LOUGH ESKE , DONEGAL PO |
(1) CONSTRUCTION OF TWO DORMER WINDOWS TO FRONT (SOUTH) ROOF AND TWO DORMERS TO REAR (NORTH) ROOF AND OTHER MINOR ELEVATIONAL CHANGES, (2) REMOVAL OF EXISTING SUNROOM AND CONSTRUCTION OF A NEW WRAP AROUND ANNEX TO THE SOUTH-EAST SIDE OF THE HOUSE, (3) PROVISION OF A NEW PORCH CANOPY TO THE REAR, (4... login required. |
Details... |
1.2km |
10/10/2024 |
N/A |
FRIARY , LOUGH ESKE , DONEGAL PO |
(1) CONSTRUCTION OF TWO DORMER WINDOWS TO FRONT (SOUTH) ROOF AND TWO DORMERS TO REAR (NORTH) ROOF AND SOME OTHER MINOR ELEVATIONAL CHANGES, (2) REMOVAL OF EXISTING SUNROOM AND CONSTRUCTION OF A NEW WRAP AROUND ANNEX TO THE SOUTH-EAST SIDE OF THE HOUSE, (3) PROVISION OF A NEW PORCH CANOPY TO THE REAR,... login required. |
Details... |
1.2km |
07/10/2024 |
N/A |
TAWNYVORGAL , BARNESMORE , DONEGAL PO |
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.8km |
03/10/2024 |
CONDITIONAL |
ST. FRANCIS NATIONAL SCHOOL , MULLANALAMPHRY , BARNESMORE DONEGAL PO |
CONSTRUCTION OF 1 NO. MAINSTREAM CLASSROOM AND 2 NO. SET ROOMS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.2km |
15/05/2024 |
N/A |
TAWNYVORGAL , BARNESMORE , CO DONEGAL |
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.1km |
10/05/2024 |
CONDITIONAL |
TAWNYVORGAL , BARNESMORE , CO. DONEGAL |
CHANGE OF HOUSE DESIGN AND MINOR REPOSITIONING OF DWELLING HOUSE AND DETACHED DOMESTIC GARAGE PREVIOUSLY APPROVED UNDER PLANNING REF. NO. 20/51044 AND ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.2km |
12/04/2024 |
CONDITIONAL |
LOUGH ESKE CASTLE , DONEGAL TOWN , CO DONEGAL |
CONSTRUCTION OF A NEW SUBSTATION. THIS IS A PROTECTED STRUCTURE RPS REG. NO. 40909401... login required. |
Details... |
2.2km |
27/03/2024 |
N/A |
LOUGH ESKE CASTLE , DONEGAL TOWN , CO DONEGAL |
CONSTRUCTION OF A NEW SUBSTATION. THIS IS A PROTECTED STRUCTURE RPS REG. NO. 40909401... login required. |
Details... |
1km |
14/03/2024 |
CONDITIONAL |
HARVEY'S POINT HOTEL , FRIARY , LOUGH ESKE ROAD |
(1) CONSTRUCTION OF A NEW SPA AND WELLNESS FACILITY CONSISTING OF A SINGLE STOREY BUILDING CONTAINING A GYM, STUDIO, SAUNA, STEAM ROOM, CHANGING ROOMS AND SUPPORT AREAS ALONG WITH AN EXTERNAL DECK INCORPORATING A HYDRO... login required. |
Details... |
1km |
06/03/2024 |
N/A |
HARVEY'S POINT HOTEL , FRIARY , LOUGH ESKE ROAD |
(1) CONSTRUCTION OF (A) A NEW SPA AND WELLNESS FACILITY CONSISTING OF A SINGLE STOREY BUILDING CONTAINING A GYM, STUDIO, SAUNA, STEAM ROOM, CHANGING ROOMS AND SUPPORT AREAS, ALON... login required. |
Details... |
1km |
29/01/2024 |
CONDITIONAL |
HARVEY'S POINT , FRIARY LOUGH ESKE ROAD , DONEGAL TOWN |
(1) CONSTRUCTION OF AN ADDITIONAL THREE NEW BEDROOMS IN LIEU OF EXISTING ADMINISTRATION AREAS AT FIRST FLOOR DORMER LEVEL WITHIN THE EXISTING HOTEL RECEPTION BLOCK, ALONG WITH ASSOCIATED MODIFICATIONS AT GROUND FLOOR LEVEL TO FACILITATE ACCESS AND CONSTRUCTION OF 3 NEW DORMER WINDOWS, (2) CONVERSION OF EXISTING STORE AREAS WITHIN THE LOWER GROUND FLOOR LEVEL IN THE MAIN BEDROOM BLOCK TO ADMINISTRATIVE OFFICES AND BACK OF HOUSE SUPPORT... login required. |
Details... |
2.4km |
02/01/2024 |
CONDITIONAL |
TAWNAWULLY MOUNTAIN , BARNESMORE , CO DONEGAL |
RESTORATION AND CONVERSION OF EXISTING STONE OUTHOUSES TO ANCILLARY ACCOMMODATION CONSISTING OF 2 NO. BEDROOMS AND A SHOWER ROOM FOR THE EXISTING DWELLING HOUSE... login required. |
Details... |
1.2km |
30/11/2023 |
N/A |
TAWNYVORGAL , LOUGH ESKE , DONEGAL TOWN |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.7km |
10/10/2023 |
CONDITIONAL |
GREENAN , LOUGH ESKE , DONEGAL TOWN PO |
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ... login required. |
Details... |
2km |
23/06/2023 |
CONDITIONAL |
LOUGH EASK DEMESNE , DONEGAL TOWN , CO. DONEGAL |
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.4km |
25/04/2023 |
CONDITIONAL |
ALTILOW , BARNESMORE , DONEGAL PO |
CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE FRONT OF EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.6km |
14/04/2023 |
CONDITIONAL |
GARVAGH , BARNESMORE , DONEGAL PO |
CONSTRUCTION OF A NEW DWELLING HOUSE WITH A WASTEWATER TREATMENT SYSTEM AND SOIL POLISHING FILTER, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.1km |
06/01/2023 |
CONDITIONAL |
LOUGH ESKE CASTLE HOTEL , BARNESMORE , CO. DONEGAL |
CONSTRUCTION OF A TWO-STOREY EXTENSION TO THE LOUGH ESKE CASTLE HOTEL CONSISTING OF AN ADDITIONAL 24 NO. SUITES AND 4 NO. BEDROOMS. THIS IS A PROTECTED STRUCTURE RPS REG. NO. 40909401... login required. |
Details... |
2.1km |
20/12/2022 |
N/A |
LOUGH ESKE CASTLE HOTEL , DONEGAL PO , CO. DONEGAL |
CONSTRUCTION OF A TWO-STOREY EXTENSION TO PROVIDE AN ADDITIONAL 24 SUITES AND 4 BEDROOMS... login required. |
Details... |