520m |
25/10/2024 |
N/A |
BALLINTRA , ARRANMORE ISLAND , CO. DONEGAL |
REPLACEMENT OF AN EXISTING 30M-HIGH RADIO MAST AND CABLE STAY SUPPORTS WITH A PROPOSED 30M-HIGH LATTICE TOWER TO SUPPORT 4NO. RADIO-LINK DISHES, TOGETHER WITH EQUIPMENT CABINET AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS INCLUDING UPGRADING OF ACCESS TRACK AT EXISTING RADIO MAST SITE. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND ... login required. |
Details... |
1.8km |
23/10/2024 |
N/A |
CLOGHCOR , ARRANMORE ISLAND , LETTERKENNY PO |
(1) REMOVAL OF EXISTING SEPTIC TANK AND (2) CONSTRUCTION OF A DWELLING HOUSE, SEWAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.2km |
11/09/2024 |
N/A |
APHORT , ARRANMORE , CO. DONEGAL |
CONSTRUCTION OF A DWELLING HOUSE, SEWAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.2km |
08/08/2024 |
CONDITIONAL |
GORTGARRA , ARRANMORE ISLAND , LETTERKENNY PO |
(1) EXTENSION AND RENOVATION TO AN EXISTING DERELICT DWELLING HOUSE AND (2) DECOMMISSION OF THE EXISTING SEPTIC TANK AND TO INSTALL A NEW SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
790m |
16/07/2024 |
REFUSED |
PLUGHOGE , ARRANMORE ISLAND , LETTERKENNY PO |
(1) REFURBISHMENT OF EXISTING DWELLING HOUSE, (2) ERECTION OF EXTENSION ONTO EXISTING DWELLING HOUSE WITH (3) INSTALLATION OF NEW WASTEWATER TREATMENT SYSTEM AND (4) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING THE PROPOSED DIVERSION OF THE EXISTING PRIVATE ACCESS ROAD... login required. |
Details... |
950m |
11/06/2024 |
N/A |
LEABRANNAGH , ARRANMORE ISLAND , CO DONEGAL |
(1) DEMOLITION OF AN EXISTING DWELLING HOUSE, (2) ERECTION OF A REPLACEMENT DWELLING HOUSE WITH NEW CONNECTION TO EXISTING SEPTIC TANK AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
940m |
04/06/2024 |
N/A |
LEABRANNAGH , ARRANMORE ISLAND , CO. DONEGAL |
DEMOLITION OF EXISTING DWELLING HOUSE AND ERECTION OF A REPLACEMENT DWELLING HOUSE WITH NEW CONNECTION TO EXISTING SEPTIC TANK AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.3km |
07/05/2024 |
CONDITIONAL |
LEABGARROW , ARRANMORE ISLAND , CO. DONEGAL |
CONSTRUCTION OF A DOMESTIC GARAGE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.3km |
24/04/2024 |
N/A |
GORTGARRA , ARRANMORE ISLAND , CO DONEGAL |
REFURBISHMENT OF A DILAPIDATED COTTAGE AND EXTENSION TO THE SOUTHEAST AND SOUTHWEST INCLUDING A NEW GABLED RETURN WITH PITCHED ROOF TO PROVIDE INCREASED LIVING SPACE AND ADDITIONAL BEDROOM ACCOMMODATION WITH ON-SITE WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITEWORKS... login required. |
Details... |
430m |
22/04/2024 |
N/A |
ILLION , ARRANMORE ISLAND , CO DONEGAL |
ERECTION OF 6 NO. GLAMPING PODS WITH ASSOCIATED PARKING AND CONNECTION TO A WASTEWATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.9km |
29/02/2024 |
REFUSED |
APHORT , ARRANMORE ISLAND , CO DONEGAL |
ERECTION OF A NEW AGRICULTURAL SHED AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.9km |
08/02/2024 |
CONDITIONAL |
APHORT , ARRANMORE ISLAND , CO. DONEGAL |
CHANGE OF HOUSE DESIGN PREVIOUSLY PERMITTED UNDER REF 21/51172... login required. |
Details... |
1.3km |
07/02/2024 |
CONDITIONAL |
LEABGARROW , ARRANMORE ISLAND , CO. DONEGAL |
DEVELOPMENT OF LANDS ADJOINING THE FORESHORE AREA AS A PUBLIC GARDEN AMENITY AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
650m |
28/12/2023 |
CONDITIONAL |
BALLINTRA , ARRANMORE ISLAND , CO DONEGAL |
INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM, A SAND POLISHING FILTER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ... login required. |
Details... |
1.8km |
18/12/2023 |
CONDITIONAL |
LEABGARROW , ARRANMORE ISLAND , CO DONEGAL |
ERECTION OF A NEW DWELLING HOUSE AND GARAGE WITH SEPTIC TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
970m |
01/12/2023 |
CONDITIONAL |
LEABRANNAGH , ARRANMORE ISLAND , CO DONEGAL |
CONSTRUCTION OF EXTENSION TO THE EAST SIDE OF THE EXISTING DWELLING HOUSE WITH REQUIRED SITE WORKS... login required. |
Details... |
1.9km |
24/11/2023 |
N/A |
APHORT , ARRANMORE , LETTERKENNY PO |
ERECTION OF A NEW AGRICULTURAL SHED AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
390m |
06/11/2023 |
CONDITIONAL |
ILLION , ARRANMORE ISLAND , DONEGAL PO |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK SYSTEM AND ALL OTHER SITE DEVELOPMENT WORKS... login required. |
Details... |
2.7km |
31/10/2023 |
CONDITIONAL |
LOUGH SHORE , ARRANMORE ISLAND , LETTERKENNY PO |
CONSTRUCTION OF A NEW DAM/SPILLWAY AND ASSOCIATED CUT OFF PROVISIONS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND... login required. |
Details... |