2.2km |
25/10/2024 |
N/A |
BALLINTRA , ARRANMORE ISLAND , CO. DONEGAL |
REPLACEMENT OF AN EXISTING 30M-HIGH RADIO MAST AND CABLE STAY SUPPORTS WITH A PROPOSED 30M-HIGH LATTICE TOWER TO SUPPORT 4NO. RADIO-LINK DISHES, TOGETHER WITH EQUIPMENT CABINET AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS INCLUDING UPGRADING OF ACCESS TRACK AT EXISTING RADIO MAST SITE. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND ... login required. |
Details... |
2.4km |
02/07/2024 |
N/A |
BAILE AN TSRATHA , AR OILEÁN ÁRAINN MHÓR , CO. DHÚN NA NGALL |
(1) COINNEÁIL AGUS CRÍOCHNÚ DEN SÍNEADH DON TEACH CÓNAITHE AGUS MÉADÚ AIRDE, (2) COINNEÁIL TEACH SOGHLUAISTE GO DTÍ GO BHFUIL AN OBAIR FOIRGNÍOCHA CRÍOCHNATHE AGUS (3) AGUS CEAD FA CHOINNE UASGHRÁDÚ AN CÓRAS SÉARCHAIS AR AN SUÍOMH CHOMH MAITH LEIS AN UILIG A BHAINEANN LEIS... login required. |
Details... |
2.1km |
07/05/2024 |
CONDITIONAL |
LEABGARROW , ARRANMORE ISLAND , CO. DONEGAL |
CONSTRUCTION OF A DOMESTIC GARAGE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.5km |
22/04/2024 |
N/A |
ILLION , ARRANMORE ISLAND , CO DONEGAL |
ERECTION OF 6 NO. GLAMPING PODS WITH ASSOCIATED PARKING AND CONNECTION TO A WASTEWATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.2km |
07/02/2024 |
CONDITIONAL |
LEABGARROW , ARRANMORE ISLAND , CO. DONEGAL |
DEVELOPMENT OF LANDS ADJOINING THE FORESHORE AREA AS A PUBLIC GARDEN AMENITY AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.7km |
28/12/2023 |
CONDITIONAL |
BALLINTRA , ARRANMORE ISLAND , CO DONEGAL |
INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM, A SAND POLISHING FILTER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ... login required. |
Details... |
1.1km |
18/12/2023 |
CONDITIONAL |
LEABGARROW , ARRANMORE ISLAND , CO DONEGAL |
ERECTION OF A NEW DWELLING HOUSE AND GARAGE WITH SEPTIC TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.6km |
06/11/2023 |
CONDITIONAL |
ILLION , ARRANMORE ISLAND , DONEGAL PO |
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK SYSTEM AND ALL OTHER SITE DEVELOPMENT WORKS... login required. |
Details... |
1.4km |
31/10/2023 |
CONDITIONAL |
LOUGH SHORE , ARRANMORE ISLAND , LETTERKENNY PO |
CONSTRUCTION OF A NEW DAM/SPILLWAY AND ASSOCIATED CUT OFF PROVISIONS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND... login required. |
Details... |
0m |
25/10/2023 |
CONDITIONAL |
BALLINTRA , ARRANMORE ISLAND , CO. DONEGAL |
CHANGE OF HOUSE TYPE TO THAT PREVIOUSLY GRANTED UNDER PLANNING REF. NO. 23/50288 AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
0m |
13/09/2023 |
N/A |
BALLINTRA , ARRANMORE ISLAND , LETTERKENNY PO |
CHANGE OF HOUSE TYPE TO THAT PREVIOUSLY GRANTED UNDER PLANNING REF: 23/50207 AND ALL ASSOCIATED SITE DEVELOPMENT WORKS ... login required. |
Details... |
2.4km |
16/08/2023 |
CONDITIONAL |
ILLION , ARRANMORE ISLAND , CO. DONEGAL |
CONSTRUCTION OF A DWELLING HOUSE WITH ON-SITE SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
16/08/2023 |
CONDITIONAL |
ILLION , ARRANMORE ISLAND , CO. DONEGAL |
CONSTRUCTION OF A DWELLING HOUSE WITH ON-SITE SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
450m |
26/07/2023 |
N/A |
BALLINTRA , ARRANMORE , LETTERKENNY PO |
(1) EXTENSION AND REFURBISHMENT OF EXISTING DERELICT DWELLING HOUSE WITH (2) INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM AND (3) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
450m |
27/06/2023 |
N/A |
BALLINTRA , ARRANMORE ISLAND , CO. DONEGAL |
(A) CONVERSION AND EXTENSION OF AN EXISTING SHED INTO A NEW DWELLING HOUSE, (B) THE INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM AND (C) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.8km |
20/06/2023 |
CONDITIONAL |
PLUGHOGE , ARANMORE ISLAND , LETTERKENNY PO |
REMOVAL OF EXISTING WALL-STADES AND CONSTRUCTION OF A DRY-GOODS STORE WITH ALL ASSOCIATED DRAINAGE AND SITE WORKS... login required. |
Details... |
2.8km |
23/05/2023 |
N/A |
APHORT , ARANMORE ISLAND , LETTERKENNY PO |
CONSTRUCTION OF A DRY-GOODS STORE WITH ALL ASSOCIATED DRAINAGE AND SITE WORKS... login required. |
Details... |
2.8km |
02/05/2023 |
N/A |
APHORT , ARANMORE ISLAND , LETTERKENNY PO |
CONSTRUCTION OF A DRY-GOODS STORE WITH ALL ASSOCIATED DRAINAGE AND SITE WORKS... login required. |
Details... |
2.6km |
08/03/2023 |
CONDITIONAL |
ILLION , ARRANMORE ISLAND , LETTERKENNY PO |
EXISTING SITE DEVELOPMENT WORKS AND RETAINING WALL AND PERMISSION FOR ERECTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH SEPTIC TANK SYSTEM AND ALL OTHER SITE DEVELOPMENT WORKS... login required. |
Details... |