1.3km |
24/04/2024 |
N/A |
LOUGHFAD , PORTNOO , CO DONEGAL |
CONSTRUCTION OF A DWELLING HOUSE WITH DOMESTIC GARAGE, ASSOCIATED SEWAGE TREATMENT SYSTEM, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.9km |
12/02/2024 |
CONDITIONAL |
NARAN , PORTNOO , DONEGAL |
(1) EXTENSION AND RENOVATION OF EXISTING DWELLING HOUSE WITH CONNECTION TO EXISTING SEWERAGE TREATMENT SYSTEM, (2) ERECTION OF A DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.6km |
16/10/2023 |
REFUSED |
CLOONEY , PORTNOO , DONEGAL PO |
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE, (2) AN ACCESSWAY THROUGH THE BERMS, ON LAND FORMERLY PART OF THE CAR PARK, (3) WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE. THE WATER TANK WILL BE SUPPLIED PRIMARILY FROM THE EXISTING WATER MAIN WIT... login required. |
Details... |
3km |
06/09/2023 |
CONDITIONAL |
NARAN , PORTNOO , DONEGAL PO |
CONSTRUCTION OF A SINGLE STOREY DWELLING HOUSE, DETACHED DOMESTIC GARAGE, NEW VEHICULAR ACCESS, EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION... login required. |
Details... |
3km |
06/09/2023 |
CONDITIONAL |
NARAN , PORTNOO , DONEGAL PO |
CONSTRUCTION OF A PART TWO-STOREY AND PART SINGLE-STOREY HOUSE, NEW VEHICULAR ACCESS, EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION... login required. |
Details... |
2.3km |
26/07/2023 |
CONDITIONAL |
NARAN , PORTNOO , DONEGAL PO |
(1) EXTENSION AND RENOVATION OF EXISTING DWELLING HOUSE TO INCLUDE RAISED RIDGE HEIGHT AND ALTERATIONS TO ALL FACADES AND (2) UPGRADING OF EXISTING PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.2km |
01/06/2023 |
CONDITIONAL |
LOUGHFAD , PORTNOO , DONEGAL PO |
ERECTION OF A DWELLING HOUSE WITH SEWAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMEMT WORKS... login required. |
Details... |
1.7km |
25/04/2023 |
CONDITIONAL |
BALLYRISTON , PORTNOO , LETTERKENNY PO |
EXISTING DWELLING HOUSE AS ERECTED, WITH ASSOCIATED SEWAGE TREATMENT SYSTEM AND ACCESS LANE AND PERMISSION FOR DECOMMISSIONING THE EXISTING TREATMENT SYSTEM AND INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.2km |
30/03/2023 |
CONDITIONAL |
ADAMSON HOUSE , LAKEVIEW ESTATE , NARIN PORTNOO |
INSTALLATION OF A WINDOW AT ATTIC LEVEL ON THE NORTH GABLE WALL... login required. |
Details... |
2.1km |
24/03/2023 |
CONDITIONAL |
NARAN , PORTNOO , LETTERKENNY PO |
(1) DEMOLITION OF EXISTING HOTEL AND THE DECOMMISSIONING OF THE ON-SITE TREATMENT SYSTEM THAT CURRENTLY SERVES THE EXISTING HOTEL AND 6 NO. EXISTING DWELLINGS, (2) CONSTRUCTION OF A NEW HOTEL WITH ASSOCIATED CAR PARKING FACILITY AND THE INSTALLA... login required. |
Details... |
170m |
24/02/2023 |
CONDITIONAL |
CASHELGOLAN , PORTNOO , LETTERKENNY PO |
EXISTING EXTERNAL STAIRCASE TO ATTIC SPACE AND PERMISSION FOR DEVELOPMENT OF THE EXISTING ATTIC SPACE TO PROVIDE FOR ADDITIONAL LIVING ACCOMMODATION. ALTERATIONS TO THE FACADES TO INCLUDE DORMER WINDOW TO THE REAR AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.6km |
30/01/2023 |
CONDITIONAL |
NARIN AND PORTNOO GOLF COURSE , CLOONEY , PORTNOO |
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE (2) AN ACCESSWAY THROUGH THE BERMS ON LAND FORMERLY PART OF THE CAR PARK (3) A WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE (4) AMENDM... login required. |
Details... |
2.3km |
07/12/2022 |
CONDITIONAL |
BALLYIRISTON BARN , PORTNOO , LETTERKENNY PO |
CONSTRUCTION OF A TWO STOREY EXTENSION TO REPLACE A SINGLE STOREY ROOM... login required. |
Details... |
2.8km |
02/12/2022 |
CONDITIONAL |
NARAN , PORTNOO , LETTERKENNY PO |
AN EXTENSION AND RENOVATIONS TO EXISTING DOMESTIC GARAGE CONSISTING OF (1) RAISED RIDGE FLOOR HEIGHT TO PROVIDE GYM AND OFFICE AREA AT FIRST FLOOR LEVEL (2) PROVISION OF AN EXTENSIO... login required. |
Details... |
1.6km |
17/10/2022 |
N/A |
NARIN AND PORTNOO GOLF COURSE , CLOONEY , PORTNOO |
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE (2) AN ACCESSWAY THROUGH THE BERMS ON LAND FORMERLY PART OF THE CAR PARK (3) A WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE (4) AMENDM... login required. |
Details... |
2.9km |
13/10/2022 |
CONDITIONAL |
SUMMY , PORTNOO , CO. DONEGAL |
(1) ERECTION OF AN EXTENSION TO EXISTING DWELLING HOUSE WITH ELEVATIONAL AMENDMENTS TO ALL FACADES AND SEPARATED DETACHED OFFICE POD BUILDING (2) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS.... login required. |
Details... |
2.1km |
13/10/2022 |
CONDITIONAL |
BALLYMACKILDUFF , PORTNOO , CO. DONEGAL |
CHANGE OF USE FROM RESOURCE CENTRE TO A DWELLING HOUSE WITH CONNECTION TO ALL EXISTING SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.2km |
27/09/2022 |
CONDITIONAL |
CLOGHER WEST , PORTNOO , CO. DONEGAL |
ERECTION OF AN EXTENSION TO THE SIDE AND REAR OF THE EXISTING DWELLING HOUSE, NEW DETACHED DOMESTIC GARAGE TO THE SIDE OF THE DWELLING HOUSE AND ASSOCIATED SITE WORKS... login required. |
Details... |
1.6km |
26/09/2022 |
N/A |
NARIN & PORTNOO GOLF COURSE , CLOONEY , PORTNOO |
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE (2) AN ACCESSWAY THROUGH THE BERMS ON LAND FORMERLY PART OF THE CAR PARK (3) A WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE (4) AMENDM... login required. |
Details... |
3km |
19/08/2022 |
REFUSED |
MASSLOUGHDERRYDUFF LACKAGHATERMON , ARDARA , DONEGAL PO |
A TEN YEAR PLANNING PERMISSION FOR A RENEWABLE ENERGY DEVELOPMENT WITH A 40-YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT WILL CONSISTS OF (1) CONSTRUCTION OF 3 WIND TURBINE GENERATORS AND ASSOCIATED HARDSTANDS AREAS WITHIN THE FOLLOWING PARAMETERS (A) A TOTAL TIP HEIGHT IN THE RANGE OF 145 METRES MINIMUM TO 150 METRES MAXIMUM (B) HUB HEIGHT IN THE RANGE OF 82 METRES MINIMUM TO 87 METRES MAXIMUM (C) ROTOR DIAMETER IN THE RANGE OF 121 METRES MINIMUM TO 126 METRES MAXIMUM (2) UPGRADING OF EXISTING SITE ACCESS TRACKS AND ROADS AND PROVISION OF NEW SITE ACCESS TRACK AND ROADS (3) WIDENING OF 3 NO. EXISTING SITE ENTR... login required. |
Details... |