2.2km |
12/02/2024 |
CONDITIONAL |
NARAN , PORTNOO , DONEGAL |
(1) EXTENSION AND RENOVATION OF EXISTING DWELLING HOUSE WITH CONNECTION TO EXISTING SEWERAGE TREATMENT SYSTEM, (2) ERECTION OF A DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.7km |
07/02/2024 |
N/A |
LACKAGH , PORTNOO , DONEGAL PO |
ERECTION OF A DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.4km |
07/12/2023 |
N/A |
SANDFIELD , ARDARA , CO. DONEGAL |
SITE WORKS TO LANDS AT THE REAR AND PERMISSION FOR (1) DEVELOPMENT OF ADDITIONAL LANDS TO EXTEND THE CURRENT COURSE, (2) REMOVAL OF THE EXISTING CABIN OFFICE BUILDING, (3) CONSTRUCTION OF A NEW RECEPTION BUILDING TO CONTAIN A SHOP AREA, EXTERNAL SEATING AREA, OFFICE AND ASSOCIATED TOILETS, (4) DEVELOPMENT OF (A) AN INCREASE... login required. |
Details... |
2.5km |
23/11/2023 |
REFUSED |
LACKAGH , PORTNOO , DONEGAL PO |
A GRAVEL ACCESS ROUTE THROUGH LAND. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION... login required. |
Details... |
2.3km |
16/10/2023 |
REFUSED |
CLOONEY , PORTNOO , DONEGAL PO |
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE, (2) AN ACCESSWAY THROUGH THE BERMS, ON LAND FORMERLY PART OF THE CAR PARK, (3) WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE. THE WATER TANK WILL BE SUPPLIED PRIMARILY FROM THE EXISTING WATER MAIN WIT... login required. |
Details... |
2.3km |
06/09/2023 |
N/A |
NARAN , PORTNOO , DONEGAL PO |
CONSTRUCTION OF A SINGLE STOREY DWELLING HOUSE, DETACHED DOMESTIC GARAGE, NEW VEHICULAR ACCESS, EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION... login required. |
Details... |
2.2km |
06/09/2023 |
N/A |
NARAN , PORTNOO , DONEGAL PO |
CONSTRUCTION OF A PART TWO-STOREY AND PART SINGLE-STOREY HOUSE, NEW VEHICULAR ACCESS, EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION... login required. |
Details... |
1.9km |
26/07/2023 |
CONDITIONAL |
NARAN , PORTNOO , DONEGAL PO |
(1) EXTENSION AND RENOVATION OF EXISTING DWELLING HOUSE TO INCLUDE RAISED RIDGE HEIGHT AND ALTERATIONS TO ALL FACADES AND (2) UPGRADING OF EXISTING PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.1km |
01/06/2023 |
CONDITIONAL |
LOUGHFAD , PORTNOO , DONEGAL PO |
ERECTION OF A DWELLING HOUSE WITH SEWAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMEMT WORKS... login required. |
Details... |
2.5km |
18/05/2023 |
CONDITIONAL |
SANDFIELD , ARDARA , DONEGAL PO |
REPLACEMENT OF EXISTING EFFLUENT TREATMENT SYSTEM. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION... login required. |
Details... |
2.5km |
03/05/2023 |
N/A |
SANDFIELD , ARDARA , DONEGAL PO |
REPLACEMENT OF EXISTING EFFLUENT TREATMENT SYSTEM. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION... login required. |
Details... |
2.6km |
03/05/2023 |
CONDITIONAL |
SANDFIELD , ARDARA , DONEGAL PO |
(1) CONSTRUCTION OF A DORMER TO THE REAR OF EXISTING PROPERTY AND PROVISION OF ADDITIONAL ACCOMMODATION AT FIRST FLOOR LEVEL WITH ALTERATIONS TO ALL FA... login required. |
Details... |
2.9km |
04/04/2023 |
CONDITIONAL |
28 LACKAGH , PORTNOO , LETTERKENNY PO |
DEMOLITION OF THE EXISTING CONSERVATORY AND ERECTION OF A NEW EXTENSION TO THE GABLE OF THE EXISTING DWELLING HOUSE WITH ADDITIONAL ALTERATIONS TO THE EXISTING FACADES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.6km |
30/03/2023 |
CONDITIONAL |
ADAMSON HOUSE , LAKEVIEW ESTATE , NARIN PORTNOO |
INSTALLATION OF A WINDOW AT ATTIC LEVEL ON THE NORTH GABLE WALL... login required. |
Details... |
1.5km |
24/03/2023 |
CONDITIONAL |
NARAN , PORTNOO , LETTERKENNY PO |
(1) DEMOLITION OF EXISTING HOTEL AND THE DECOMMISSIONING OF THE ON-SITE TREATMENT SYSTEM THAT CURRENTLY SERVES THE EXISTING HOTEL AND 6 NO. EXISTING DWELLINGS, (2) CONSTRUCTION OF A NEW HOTEL WITH ASSOCIATED CAR PARKING FACILITY AND THE INSTALLA... login required. |
Details... |
2.2km |
24/02/2023 |
CONDITIONAL |
CASHELGOLAN , PORTNOO , LETTERKENNY PO |
EXISTING EXTERNAL STAIRCASE TO ATTIC SPACE AND PERMISSION FOR DEVELOPMENT OF THE EXISTING ATTIC SPACE TO PROVIDE FOR ADDITIONAL LIVING ACCOMMODATION. ALTERATIONS TO THE FACADES TO INCLUDE DORMER WINDOW TO THE REAR AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.3km |
30/01/2023 |
CONDITIONAL |
NARIN AND PORTNOO GOLF COURSE , CLOONEY , PORTNOO |
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE (2) AN ACCESSWAY THROUGH THE BERMS ON LAND FORMERLY PART OF THE CAR PARK (3) A WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE (4) AMENDM... login required. |
Details... |
2km |
02/12/2022 |
CONDITIONAL |
NARAN , PORTNOO , LETTERKENNY PO |
AN EXTENSION AND RENOVATIONS TO EXISTING DOMESTIC GARAGE CONSISTING OF (1) RAISED RIDGE FLOOR HEIGHT TO PROVIDE GYM AND OFFICE AREA AT FIRST FLOOR LEVEL (2) PROVISION OF AN EXTENSIO... login required. |
Details... |
2.3km |
17/10/2022 |
N/A |
NARIN AND PORTNOO GOLF COURSE , CLOONEY , PORTNOO |
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE (2) AN ACCESSWAY THROUGH THE BERMS ON LAND FORMERLY PART OF THE CAR PARK (3) A WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE (4) AMENDM... login required. |
Details... |