380m |
14/11/2024 |
N/A |
Former Trim Transport Ltd Yard, Tolka Quay Road, Dublin Port, Dublin 1 |
For development at this site at the former Trim Transport Ltd yard, Tolka Quay Road, Dublin Port, Dublin 1, D01 H977. The subject site comprises of c. 0.147ha within the overall former Trim Transport Ltd site. The development will consist of: •The construction of a single storey modular office building (180sqm) with 2 no. solar photovoltaic panel arrays at roof level and external heat pumps to the rear;
•The provision of a storage container (28sqm) to accommodate ancillary storage and a secure shelter... login required. |
Details... |
240m |
04/10/2023 |
GRANT PERMISSION |
A site generally bounded by Alexandra Road to the north, Branch Road No.1 and rail line to the west,, Branch Road No.3 to the east and Alexandra Basin to the south, at Dublin Port, Dublin 1, which includes R&H Hall Silo Building (a protected structure, re |
PROTECTED STRUCTURE: PERMISSION:The development will consist of: A. Demolition and removal of existing quayside overhead bulk material conveyor system (2no. North/South and 1no. East/West), 2no. associated elevator/weighing towers, redundant transformer building and weighbridge and associated infrastructure to include site clearance of redundant walls, plinths and fences; B. Reinstatement of window opening to the R&H Hall Silo Building, a protected structure, following removal of the elevated conveyor system (within its curtilage) together with internal and external repair works to the remainder of the building; C. Relocation of existing rail line northwards to a safe zone set further back from the quayside, existing crane rails along the quayside and existing 30m high mast lighting (HML) tower; D. Relocation of existing reefer gantries and 30m HML towers located at McCairn's Yard and provision of 2no. new reefer gantries; E. Quayside and yard pavement upgrades and reinforcement works and installation of new 30m HML towers; F. Construction of a new bulk product silo facility at McCairn's Yard, to include intake/outtake of bulk product from vessels to quayside storage and onward transport. The facility will consist of 6no. bulk product storage silo bins c.30.0m in height (... login required. |
Details... |
290m |
24/11/2022 |
GRANT PERMISSION |
Promenade Road, Dublin Port, Dublin 1 |
Permission for change of use, material alterations and extension to an existing two storey office building and part of 2no. industrial sheds for use as Artist Workspaces on a site at Promenade Road, Dublin Port, Dublin 1. The development will consist of a) Material alterations to the existing two storey office building to provide a ground, first and second floor extension of 30.4 sqm area total, to include a passenger lift providing access to first floor. Material alterations to the north, south, east and west facades by closing up 19no. windows and 1no. door, enlarging 2no. existing window openings to the south and west facade and 1no. new window to the west facade, provide external cladding to all facades with an entrance canopy to the west elevation and fixed signage to the north elevation b) Material alteration... login required. |
Details... |
0m |
21/09/2022 |
GRANT PERMISSION AND RETENTION PERMISSION |
Site which extends from Promenade Road, to Alexandra Road, Dublin Port, Dublin 3 |
PERMISSION & RETENTION: Development at this site which extends from Promenade Road to Alexandra Road and includes the western part of Circle K Fuel Terminal1, part of Promenade Road at its junction with Terminal 10 Link Road (T10 Link Road), T10 Link Road, part of Tolka Quay Road, No. 1 Branch Road North and part of Alexandra Road. It also incorporates land comprising parts of Terminal 4 and Terminal 4 North, all at Dublin Port, Dublin 1.
1. Retention permission is sought for development of part of a link road known as T10 Link Road connecting Promenade Road with Tolka Quay Road to the west of the Terminal 10 State Services yard. The road and associated infrastructure comprises of:
- An approximately 125 metre long and 14.4 m wide two-way road (two northbound lanes and one southbound land), with 2 no. 3m wide footpaths.
- A T-junction with Promenade Road;
- A pedestrian zebra crossing at the northern end of the link road; and
- A vehicular entrance to the Terminal 10 state services yard;
- Revisions to fenceline previously permitted under Reg.Ref. 4483/19 at northeast corner of Terminal 4 North boundary; and
- All associated ancillary works including site clearance, demolitions, earthworks, pavement construction, drainage services, diversion and installation of utility services, installation of road markings and signs, lighting, CCTV and associated boundary fencing.
Permission is sought for development which will consist of a new link road from north of Tolka Quay Road to Alexandra Road. The new link road and associated infrastructure will comprise of:
- An approximately 250m long two-way road (two north bound and two south bound lanes) with 3 m wide footpaths on either side of the road and two-way segregated cycleway on eastern side of road;
- New roundabout, connecting proposed new link roa... login required. |
Details... |
0m |
29/08/2022 |
APPLICATION DECLARED INVALID |
Promenade Road to Alexandra Road & incl. part of Promenade Road at its junction with Terminal 10 Link Road, part of Tolka Quay Road, No. 1 Branch Road North & part of Alexandra Road, Dublin Port, Dublin 1. |
PERMISSION and RETENTION PERMISSION: Development at a site which extends from Promenade Road to Alexandra Road and includes part of Promenade Road at its junction with Terminal 10 Link Road (T10 Link Road), T10 Link Road, part of Tolka Quay Road, No. 1 Branch Road North and part of Alexandra Road. It also incorporates land comprising parts of Circle K Fuel Terminal 1 and Terminal 4 and Terminal 4 North, all at Dublin Port, Dublin 1. Retention permission is sought for development of part of a link road known as T10 Link Road connecting Promenade Road with Tolka Quay Road to the west of the Terminal 10 State Services yard. The road and associated infrastructure comprises of: - An approximately 125 metre long and 14.4m wide two-way road (two northbound lanes and one southbound lane), with 2 no. 3m wide footpaths; - A T-junction with Promenade Road; - A pedestrian zebra crossing at the northern end of the link road; and - A vehicular entrance to the Terminal 10 state services yard; - Revisions to fenceline previously permitted under Reg. Ref 4483/19 at northeast corner of Terminal 4 North boundary; and - All associated ancillary works, including site clearance, demolitions, earthworks, pavement construction, drainage services, diversion and installation of utility services, installation of road markings and signs, lighting, CCTV and associated boundary fencing. Permission is sought for development which will consist of a new link road from north of Tolka Quay Road to
Alexandra Road. The new link road and associated infrastructure will comprise of: - An approximately 250m long two-way road (two north bound and two south bound lanes) with 3m wide footpaths on either side of the road and two-way segregated cycleway on eastern side of road; - New roundabout, connecting proposed new link road with T... login required. |
Details... |
420m |
27/07/2021 |
GRANT PERMISSION |
Dublin Port, Alexandra Road, Dublin 1 |
PROTECTED STRUCTURE: Permission for development at this site which extends from North Wall Quay Extension to the Tolka Estuary, to include the western boundary to Dublin Port and pavements along East Wall Road, across the Alexandra Road junction with East Wall Road, across the Tolka Quay Road junction with East Wall Road, Bond Road, across the Promenade Road junction with Bond Road and to end of Bond Road, Dublin Port, Dublin 1 & 3 and permission to amend development permitted under Reg. Ref. 3084/16.
The ESB substation (Record of Protected Structures No. 8771) is located within the subject site.
The proposed development will consist of construction of a new 1.4km pedestrian walkway and a 2-way cycle lane along East Wall Road and Bond Road from the River Liffey to the Tolka Estuary and will comprise the following:
• Removal of part of existing Dublin Port western boundary wall / fence;
• Removal of the existing access to Terminal 3 on East Wall Road;
• Modifications to layout of Terminal 3 along eastern boundary including removal of private car parking spaces;
• Relocation of 3 no. existing double billboards;
• Relocation of existing flagpoles,
• Relocation of existing temporary office building of 15sq.m;
• Closure of left turn from Alexandra Road to East Wall Road southbound;
• Removal of 17 no. car parking spaces from the Dublin Port Centre car park;
• Realignment of Bond Road north of the Promenade Road junction;
• Construction of new boundary along sections of the Dublin Port western boundary comprising railings over plinth or wall to a height of c. 4m along East Wall Road and Bond Road or for a section along Bond Road a wall of c. 2.6m in height;
• Creation of a civic space adjacent to the River Liffey at North Wall Quay Extension,
• Provision of 25 no. bicycle parking spaces,
• Provision of a Dublin Port Irish language installation as part of the boundary treatment adjacent the Crane 292 enclosure.
• Provision of hard and soft landscaping including trees along the extent of the route, amenity, interpretation and wayfinding featu... login required. |
Details... |