350m |
05/11/2024 |
N/A |
Magheramore , Co. Wicklow |
change of house type (part single storey, part two storey) to that previously granted approval under planning ref. 17/466, together with wastewater treatment system and all associated site works... login required. |
Details... |
30m |
25/08/2024 |
N/A |
Seawalk Farm , Magheramore , Co. Wicklow |
Garden Structure to the end of the dwelling... login required. |
Details... |
10m |
19/08/2024 |
N/A |
Dwelling opposite Seawalk Farm , Magheramore , Co. Wicklow |
garden structure to the end of the dwelling... login required. |
Details... |
2.8km |
29/07/2024 |
REFUSED |
Jack’s Hole Beach Resort , Ballynacarrig Brittas Bay , Co. Wicklow |
1) The construction of sites for 8 no. additional mobile homes, the installation of a mobile home with associated external deck area and parking area on each site and access driveway, external lighting, berm mounding and landscaping; 2) The construction and installation of 1 no. 5-a-side football pitch, 2 no. pickleb... login required. |
Details... |
2.9km |
22/07/2024 |
N/A |
Gormanstown , Kilbride , Wicklow |
a proposed new dwelling, new garage , well, a proposed secondary treatment system to current EPA guidelines with percolation area, a new entrance off public road and all associated site works ... login required. |
Details... |
2.8km |
05/07/2024 |
N/A |
Jack’s Hole Beach Resort , Ballynacarrig Brittas Bay , Co. Wicklow |
1) The construction of sites for 8 no. additional mobile homes, the installation of a mobile home with associated external deck area and parking area on each site and access driveway, external lighting, berm mounding and landscaping; 2) The construction and installation of 1 no. 5-a-side football pitch, 2 no. pickleb... login required. |
Details... |
1.8km |
21/06/2024 |
CONDITIONAL |
31 The Briary , Blainroe Kilpoole Lower , Co. Wicklow |
additional windows... login required. |
Details... |
1.5km |
21/05/2024 |
CONDITIONAL |
Blainroe Estate , Blainroe , Co. Wicklow |
the construction of 2 No. Padel Courts, as well as associated lighting and fencing in the area of existing Tennis Court facilities along with all associated siteworks... login required. |
Details... |
1.6km |
20/05/2024 |
CONDITIONAL |
Haven Crest , Cullen Upper , Kilbride |
sun room extension to the side and retention of bay window to the front of dwelling and associated site works... login required. |
Details... |
1.6km |
10/05/2024 |
N/A |
Blainroe Estate , Blainroe , Co. wicklow |
the construction of 2 No. Padel Courts, as well as associated lighting and fencing in the area of existing Tennis Court facilities along with all associated siteworks... login required. |
Details... |
1.8km |
03/04/2024 |
CONDITIONAL |
85 The Briary Blainroe , Wicklow Town , Wicklow |
partially constructed and permission for completion of same for: (a) Construction of 5sqm entrance porch. (b) Existing utility room to be converted into habitable office whilst raising flat roof to link in with new porch. (c) Rear side extension for office and Utility rooms... login required. |
Details... |
2.8km |
27/03/2024 |
UNCONDITIONAL |
Cullen Upper , Co. Wicklow |
Section 42 on granted PRR 18/361 (Permission for dwelling, wastewater treatment system, garage and associated works and access from existing driveway)... login required. |
Details... |
1.2km |
19/02/2024 |
CONDITIONAL |
Blainroe Golf Club , Kilpoole Lower , Blainroe |
a golf academy comprising of a covered training bay and practice bays, building circa 239.5 sqm, linked to a coffee / pro shop building circa 52 sqm, improvements to existing vehicular exit / entrance, ... login required. |
Details... |
1.8km |
13/02/2024 |
N/A |
85 The Briary Blainroe , Wicklow Town , Wicklow |
partially constructed and permission for completion of same for: (a) Construction of 5sqm entrance porch. (b) Existing utility room to be converted into habitable office whilst raising flat roof to link in with new porch. (c) Rear side extension for office and Utility rooms... login required. |
Details... |
1.6km |
09/02/2024 |
CONDITIONAL |
Blainroe Upper , Wicklow , Co. Wicklow |
the construction of a new dwelling, wastewater treatment unit & polishing filter, new well, new entrance onto existing lane, upgrading existing entrance onto public road and associate works... login required. |
Details... |
1.6km |
01/02/2024 |
N/A |
Blainroe Upper , Wicklow , Co. Wicklow |
the construction of a new dwelling, wastewater treatment unit & polishing filter, new well, new entrance onto existing lane, upgrading existing entrance onto public road and associate works... login required. |
Details... |
1.2km |
21/12/2023 |
N/A |
Blainroe Golf Club , Kilpoole Lower , Blainroe |
of PRR 18/314 (golf academy comprising of a covered training bay and practice bays, building circa 239.5 sqm, linked to a coffee / pro shop building circa 52 sqm, improvements to existing vehicular exit / entr... login required. |
Details... |
2.1km |
16/11/2023 |
N/A |
Kilpoole Lower , Wicklow , County Wicklow |
a single storey dwelling, effluent disposal system to current EPA requirements, upgrade of existing agricultural field entrance to residential entrance, landscaping and associated site works... login required. |
Details... |
2.8km |
12/10/2023 |
CONDITIONAL |
Coast Guard Station Cottages , Ballynacarrig , Co. Wicklow |
development at this site : Coast Guard Station Cottages, Ballynacarrig, Co. Wicklow, A67 RX27 (which is a Protected Structure) the development will consist of revisions to the existing Grant of Permission (Reg. Ref. 21/1388) as follows: Revision of site application boundary to reflect ownership of applicant; Full demolition of the existing non-original extensions to side (single storey with mezzanine floor) and front (single storey bay windows with canopy); Revisions to the extension granted previously to the side and rear of the Cottage including reduced size/ altered footprint shape and changes to roof (part pitched, part flat) and elevation design, This will be a single storey extension to side and rear of Cottage with unde... login required. |
Details... |