2.7km |
13/11/2024 |
N/A |
The Old Rectory , Dunganstown , Co. Wicklow |
retention planning permission for the following,1.Change of use from previously approved residential accommodation to short-term letting 2. For structure as constructed
together with all associated ancillary works to facilitate the above at The Old Rectory, Dunganstown, Co. Wicklow.... login required. |
Details... |
2.7km |
11/11/2024 |
N/A |
The Old Rectory , Dunganstown , Co. Wicklow |
change of use from previously approved residential accommodation to short-term letting. For structure as constructed together with all associated ancillary works to facilitate the above ... login required. |
Details... |
2.6km |
05/11/2024 |
N/A |
Magheramore , Co. Wicklow |
change of house type (part single storey, part two storey) to that previously granted approval under planning ref. 17/466, together with wastewater treatment system and all associated site works... login required. |
Details... |
2.8km |
25/08/2024 |
N/A |
Seawalk Farm , Magheramore , Co. Wicklow |
Garden Structure to the end of the dwelling... login required. |
Details... |
2.8km |
19/08/2024 |
N/A |
Dwelling opposite Seawalk Farm , Magheramore , Co. Wicklow |
garden structure to the end of the dwelling... login required. |
Details... |
2.1km |
09/08/2024 |
REFUSED |
Clearwater , Castletimon , Brittas Bay |
Section 42(1) on granted PRR 19/42 (replace existing septic tank and percolation area with new secondary treatment system and sand filter and RETENTION of existing house and all associated works as constructed)... login required. |
Details... |
40m |
29/07/2024 |
REFUSED |
Jack’s Hole Beach Resort , Ballynacarrig Brittas Bay , Co. Wicklow |
1) The construction of sites for 8 no. additional mobile homes, the installation of a mobile home with associated external deck area and parking area on each site and access driveway, external lighting, berm mounding and landscaping; 2) The construction and installation of 1 no. 5-a-side football pitch, 2 no. pickleb... login required. |
Details... |
2.8km |
04/07/2024 |
N/A |
Dwelling opposite Seawalk Farm , Magheramore , Co. Wicklow |
garden structure to the rear of the dwelling... login required. |
Details... |
2.7km |
24/06/2024 |
N/A |
Ballynagaran , Dunganstown , Co. Wicklow |
conversion of existing stables (67sq.m.) to habitable dwelling with replacement roof, and 76sq.m. two storey extension to same to form a single dwelling, waste water treatment system to EPA standards, and associated site works... login required. |
Details... |
1.9km |
19/06/2024 |
N/A |
Millrace Holiday Park , Ballynacarrig , Brittas Bay County Wicklow |
a farm diversification tourism accommodation & open farm project incorporating a full masterplan & landscaping scheme, incl: (1) Open farm visitor areas inc. farm sheds incl. 50sq.m petting shed, pens, paddocks, play areas, garden, connecting to existing/proposed accommodation by a ‘Farm Link Trail’, assoc. fences/gates; (2) Guest facilities farm yard cluster incl: i. Entry Building (total 44sq.m) incl. farm shop & coffee dock & reception; ii. Communal shelter (88sq.m) meeting area for picnics/BBQs; iii. Guest amphitheatre; & iv. Farm food building (100sq.m) incl. kitchen, catering & self-catering area, & communal dining areas with assoc. storage & toilets; (3) 12 no. hobbit type subterranean glamping pods; (4) Part demolition/re-use/part renovation & extension of existing farmhouse & buildings to create 4 no. holiday units (1 No. 1 Bed, 2 No. 2-Beds & 1 No. 3 Bed), with a 1st. fl. balcony; (5) 4 no. shepherd huts sited around a swale SuDS pond a... login required. |
Details... |
2.2km |
20/05/2024 |
CONDITIONAL |
Haven Crest , Cullen Upper , Kilbride |
sun room extension to the side and retention of bay window to the front of dwelling and associated site works... login required. |
Details... |
2.7km |
27/03/2024 |
UNCONDITIONAL |
Cullen Upper , Co. Wicklow |
Section 42 on granted PRR 18/361 (Permission for dwelling, wastewater treatment system, garage and associated works and access from existing driveway)... login required. |
Details... |
140m |
12/10/2023 |
CONDITIONAL |
Coast Guard Station Cottages , Ballynacarrig , Co. Wicklow |
development at this site : Coast Guard Station Cottages, Ballynacarrig, Co. Wicklow, A67 RX27 (which is a Protected Structure) the development will consist of revisions to the existing Grant of Permission (Reg. Ref. 21/1388) as follows: Revision of site application boundary to reflect ownership of applicant; Full demolition of the existing non-original extensions to side (single storey with mezzanine floor) and front (single storey bay windows with canopy); Revisions to the extension granted previously to the side and rear of the Cottage including reduced size/ altered footprint shape and changes to roof (part pitched, part flat) and elevation design, This will be a single storey extension to side and rear of Cottage with unde... login required. |
Details... |
2.7km |
24/07/2023 |
N/A |
Ballynagran , Dunganstown , Co. Wicklow |
dwelling, waste water treatment system to EPA standards, garage, entrance and associated works... login required. |
Details... |
1.4km |
12/06/2023 |
CONDITIONAL |
Site No. 2 Ballynacarrig , Brittas Bay , Co. Wicklow |
a). A sunroom located on front/south elevation with 24m² floor area. b). A lean-to structure located on south/west elevation covering 6m² area... login required. |
Details... |
2km |
17/05/2023 |
CONDITIONAL |
Valleyvilla , Three Mile Water , Brittas Bay |
new side extension to existing dwelling, new front elevation extension to existing dwelling, new flat roof to rear of existing dwelling, removal of existing window to side elevation, new window layout to existing r... login required. |
Details... |
2.9km |
02/05/2023 |
N/A |
Mobile Home , Paul Leahys Field , Brittas |
replacing existing mobile home with a new mobile home... login required. |
Details... |
2.6km |
04/04/2023 |
REFUSED |
Magheramore , Co. Wicklow |
the development will consist of a new Integrated Tourism / Leisure / Recreational (ITLR) complex comprising firstly, of a new two storey over lower ground level building; containing gym, sauna, cinema and outdoor pool (24m x 10m) at lower ground level, reception bar and restaurant washrooms and outdoor terrace at ground floor and event room at first floor, and secondly, it is proposed to install 48 no. accommodation pods (21sq.m each) along the east of the site. it is proposed to construct a dedicated structure (92sq.m), located at the north end of the site adjacent the beach access, containing a surf school facility, public W.C and public showers. 49 no. ... login required. |
Details... |
2.2km |
09/03/2023 |
CONDITIONAL |
Three Mile Water , Wicklow , Co. Wicklow |
proposed cabin consisting of a home office and gym and associated works... login required. |
Details... |