930m |
06/12/2024 |
N/A |
Daingean National School , St Mary's Rd Daingean , Co. OffalyR35 AH95 |
The development will consist of the replacement of aluminum windows and doors with new aluminum windows and doors, upgrade of electrical and mechanical services including installation of Mecha... login required. |
Details... |
1.2km |
05/12/2024 |
N/A |
Main Street & Gaol Lane , Townsparks , Daingean Co. Offaly |
of renovation and alterations of existing derelict dwelling at Main Street, and 4no: 2bedroom single storey semi-detached dwellings to rear of the site accessed via Gaol lane, to include carparking, boundary treatments, ancillary services and all associated site works... login required. |
Details... |
2.5km |
07/11/2024 |
N/A |
Ballymullen , Daingean , Co. Offaly |
the construction of a new dwelling, garage, septic tank, percolation area, new entrance, and all associated site works... login required. |
Details... |
1.3km |
24/04/2024 |
CONDITIONAL |
19 PHILIPSVALE DAINGEAN , CO. OFFALY , R35 K285 |
A DOMESTIC GARAGE AND ASSOCIATE SITE DEVELOPMENT WORKS... login required. |
Details... |
570m |
22/04/2024 |
CONDITIONAL |
CLONAD , DAINGEAN , CO. OFFALY |
AN EXISTING DOMESTIC GARAGE... login required. |
Details... |
1.3km |
21/03/2024 |
N/A |
19 PHILIPSVALE DAINGEAN , CO. OFFALY , R35 K285 |
A DOMESTIC GARAGE AND ASSOCIATE SITE DEVELOPMENT WORKS... login required. |
Details... |
1.2km |
22/09/2023 |
CONDITIONAL |
Clonad , Daingean , Co Offaly |
extension to rear of house and retention of shed/outbuilding as constructed and all associated site works
... login required. |
Details... |
1.4km |
05/04/2023 |
CONDITIONAL |
TOBERRONAN & TOWNPARKS , DAINGEAN , CO. OFFALY |
CONVERSION OF EXISTING MILKING PARLOUR, DAIRY, LOOSE HOUSE AREA AND SILAGE PIT INTO A ROBOTIC MILKING AREA, DAIRY, MACHINE ROOM, FARM OFFICE, EASYFEED CUBICLES WITH UNDERGROUND SLATTED SLURRY STORA... login required. |
Details... |
1.4km |
16/03/2023 |
N/A |
TOBERRONAN , DAINGEAN , CO. OFFALY |
CONVERSION OF EXISTING MILKING PARLOUR, DAIRY, LOOSE HOUSE AREA AND SILAGE PIT INTO A ROBOTIC MILKING AREA, DAIRY, MACHINE ROOM, FARM OFFICE, EASYFEED CUBICLES... login required. |
Details... |
1.6km |
01/02/2023 |
CONDITIONAL |
TOBERRONAN AND TOWNPARKS , DAINGEAN , CO. OFFALY |
(A) NEW TWO STOREY FAMILY FARM DWELLING, WITH FIVE BEDROOMS ON AN EXISTING FARM (B) DOMESTIC USE GARAGE (C) CONNECTION TO THE EXISTING DAINGEAN TOWN PUBLIC SEWAGE SYSTEM (D) ENTRANCE THROUGH AN EXISTING RESIDENTIAL GATEWAY (E) ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.6km |
10/01/2023 |
N/A |
TOBERRONAN , DAINGEAN , CO. OFFALY |
CONSTRUCTION OF (A) NEW TWO STOREY FAMILY FARM DWELLING, WITH FIVE BEDROOMS ON AN EXISTING FARM. (B) DOMESTIC USE GARAGE. (C) CONNECTION TO THE EXISTING DAINGEAN TOWN DRAINAGE SYSTEM. (D) ENTRANCE THROUGH AN EXISTING RESIDENTIAL GATEWAY. (E) ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.4km |
13/12/2022 |
CONDITIONAL |
TOWNPARKS , DAINGEAN , CO. OFFALY |
CONSTRUCTION OF A DWELLING AND A CONNECTION TO PUBLIC SERVICES AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.2km |
01/12/2022 |
CONDITIONAL |
BALLYMULLEN , DAINGEAN , CO. OFFALY |
(A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.7km |
24/11/2022 |
CONDITIONAL |
DAINGEAN GAA CLUB , TOWNPARKS PHILIPSTOWN , DAINGEAN CO. OFFALY R35 XK12 |
INSTALLATION OF 4 NO. FLOODLIGHTS (18M HIGH) LOCATED TO THE SOUTH OF THE EXISTING FOOTBALL PITCH. PLANNING PERMISSION FOR (1) A TWO STOREY EXTENSION (298.3 SQM) TO THE WEST (REAR) OF THE EXISTING CLUBHOUSE. THE GROUND FLOOR LEVEL WILL INCLUDE A REMOTE OFFICE HUB, KITCHENETTE, PUBLIC W/C'S, STORAGE AREAS, SHOP AND THE UPGRADING OF CHANGING ROOMS WITH SHOWERS AND W/C. FIRST FLOOR LEVEL WILL INCLUDE A GYM AND STUDIO AREA. (2) ALTERATIONS TO BE MADE TO THE EXISTING DOORS AND WINDOWS TO THE WEST, NORTH & SOUTH ELEVATIONS. (3) ALTERATIONS TO THE EXISTING CLUBHOUSE ROOF WILL BE MADE TO FACILITATE THE FIRST FLOOR LEVEL AND THE EXISTING WEST (REAR) EXTENSI... login required. |
Details... |
2.2km |
11/11/2022 |
N/A |
BALLYMULLEN , DAINGEAN , CO. OFFALY |
(A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.4km |
04/11/2022 |
N/A |
TOWNPARKS , DAINGEAN , CO. OFFALY |
THE CONSTRUCTION OF A DWELLING AND A CONNECTION TO PUBLIC SERVICES AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.7km |
04/11/2022 |
N/A |
DAINGEAN GAA CLUB TOWNPARKS PHILIPSTOWN DAINGEAN , CO. OFFALY , R35 XK12 |
THE INSTALLATION OF 4 NO. FLOODLIGHTS (18M HIGH) LOCATED TO THE SOUTH OF THE EXISTING FOOTBALL PITCH. PERMISSION FOR (1) A TWO STOREY EXTENSION (298.3SQM) TO THE WEST (REAR) OF THE EXISTING CLUBHOUSE. THE GROUND FLOOR LEVEL WILL INCLUDE A REMOTE OFFICE HUB, KITCHENETTE, PUBLIC W/C'S, STORAGE AREAS, SHOP AND THE UPGRADING OF CHANGING ROOMS WITH SHOWERS AND W/C. FIRST FLOOR LEVEL WILL INCLUDE A GYM AND STUDIO AREA. (2) ALTERATIONS TO BE MADE TO THE EXISTING DOORS AND WINDOWS TO THE WEST, NORTH &SOUTH ELEVATIONS. (3) ALTERATIONS TO THE EXISTING CLUBHOUSE ROOF WILL BE MADE TO FACILITATE THE FIRST FLOOR LEVEL AND THE EXISTING WEST (REAR) EXTENSION... login required. |
Details... |
1.4km |
05/07/2022 |
CONDITIONAL |
EXISTING DAINGEAN WASTEWATER TREATMENT PLANT AT ST. MARY'S ROAD , TOWNPARKS DAINGEAN , CO. OFFALY |
THE UPGRADE OF THE EXISTING DAINGEAN WASTEWATER TREATMENT PLANT AND WILL CONSIST OF THE FOLLOWING: THE CONSTRUCTION OF A NEW STORM WATER HOLDING TANK COMPLETE WITH INTERNAL CLEANING SYSTEM, INTERNAL STORM RETURN PUMPS, ACCESS STAIRS AND PLATFORM; CONSTRUCTION OF NEW SLUDGE DRYING REED BEDS COMPLETE WITH SLUDGE FEED PIPE... login required. |
Details... |
1.4km |
14/06/2022 |
N/A |
EXISTING DAINGEAN WASTEWATER TREATMENT PLANT TOWNPARKS , DAINGEAN , CO. OFFALY |
THE UPGRADE OF THE DAINGEAN WASTEWATER TREATMENT PLANT AND WILL GENERALLY CONSIST OF THE FOLLOWING: THE CONSTRUCTION OF A NEW STORM WATER HOLDING TANK COMPLETE WITH INTERNAL CLEANING SYSTEM, INTERNAL STORM RETURN PUMPS, ACCESS STAIRS AND PLATFORM; CONSTRUCTION OF NEW SLUDGE DRYING REED BEDS COMPLETE WITH SLUDGE FEED PIP... login required. |
Details... |