2.6km |
07/11/2024 |
N/A |
Ballymullen , Daingean , Co. Offaly |
the construction of a new dwelling, garage, septic tank, percolation area, new entrance, and all associated site works... login required. |
Details... |
3km |
25/06/2024 |
N/A |
KNOCKBALLYBOY , DAINGEAN , CO OFFALY |
CONSTRUCTION OF A PRE-FABRICATED DWELLING HOUSE, TO INCLUDE A TREATMENT SYSTEM AND RAISED BED PERCOLATION AREA, PROPOSED BORED WELL WATER SUPPLY, NEW SITE ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.8km |
24/04/2024 |
CONDITIONAL |
19 PHILIPSVALE DAINGEAN , CO. OFFALY , R35 K285 |
A DOMESTIC GARAGE AND ASSOCIATE SITE DEVELOPMENT WORKS... login required. |
Details... |
1.8km |
21/03/2024 |
N/A |
19 PHILIPSVALE DAINGEAN , CO. OFFALY , R35 K285 |
A DOMESTIC GARAGE AND ASSOCIATE SITE DEVELOPMENT WORKS... login required. |
Details... |
620m |
22/09/2023 |
CONDITIONAL |
Clonad , Daingean , Co Offaly |
extension to rear of house and retention of shed/outbuilding as constructed and all associated site works
... login required. |
Details... |
2.6km |
26/07/2023 |
CONDITIONAL |
BALLINAGAR GAA GROUNDS , BALLINAGAR , CO. OFFALY |
CONSTRUCTION OF A NEW ASTROTURF PLAYING PITCH, 12 METRE HIGH FLOODLIGHTING AND ASSOCIATED FENCING AND ALL ANCILLARY SITEWORKS AND SERVICES... login required. |
Details... |
2.6km |
12/06/2023 |
N/A |
BALLINAGAR GAA GROUNDS , BALLINAGAR , TULAMORE CO. OFFALY |
CONSTRUTION OF A NEW ASTROTURF PLAYING PITCH, 12 METER HIGH FLOODLIGHTING AND ALL ANCILLARY SITEWORKS AND SERVICES ... login required. |
Details... |
1.9km |
05/04/2023 |
CONDITIONAL |
TOBERRONAN & TOWNPARKS , DAINGEAN , CO. OFFALY |
CONVERSION OF EXISTING MILKING PARLOUR, DAIRY, LOOSE HOUSE AREA AND SILAGE PIT INTO A ROBOTIC MILKING AREA, DAIRY, MACHINE ROOM, FARM OFFICE, EASYFEED CUBICLES WITH UNDERGROUND SLATTED SLURRY STORA... login required. |
Details... |
1.9km |
16/03/2023 |
N/A |
TOBERRONAN , DAINGEAN , CO. OFFALY |
CONVERSION OF EXISTING MILKING PARLOUR, DAIRY, LOOSE HOUSE AREA AND SILAGE PIT INTO A ROBOTIC MILKING AREA, DAIRY, MACHINE ROOM, FARM OFFICE, EASYFEED CUBICLES... login required. |
Details... |
2km |
13/12/2022 |
CONDITIONAL |
TOWNPARKS , DAINGEAN , CO. OFFALY |
CONSTRUCTION OF A DWELLING AND A CONNECTION TO PUBLIC SERVICES AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.5km |
01/12/2022 |
CONDITIONAL |
BALLYMULLEN , DAINGEAN , CO. OFFALY |
(A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2.5km |
11/11/2022 |
N/A |
BALLYMULLEN , DAINGEAN , CO. OFFALY |
(A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
2km |
04/11/2022 |
N/A |
TOWNPARKS , DAINGEAN , CO. OFFALY |
THE CONSTRUCTION OF A DWELLING AND A CONNECTION TO PUBLIC SERVICES AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.8km |
29/07/2022 |
CONDITIONAL |
KNOCKBALLYBOY , DAINGEAN , CO. OFFALY |
ALTERATIONS AND EXTENSION TO EXISTING SLATTED CATTLE SHED TO INCLUDE NEW CUBICLE BEDS, UNDERGROUND SLATTED SLURRY STORAGE AND ASSOCIATED SITE WORKS... login required. |
Details... |
1.9km |
05/07/2022 |
CONDITIONAL |
EXISTING DAINGEAN WASTEWATER TREATMENT PLANT AT ST. MARY'S ROAD , TOWNPARKS DAINGEAN , CO. OFFALY |
THE UPGRADE OF THE EXISTING DAINGEAN WASTEWATER TREATMENT PLANT AND WILL CONSIST OF THE FOLLOWING: THE CONSTRUCTION OF A NEW STORM WATER HOLDING TANK COMPLETE WITH INTERNAL CLEANING SYSTEM, INTERNAL STORM RETURN PUMPS, ACCESS STAIRS AND PLATFORM; CONSTRUCTION OF NEW SLUDGE DRYING REED BEDS COMPLETE WITH SLUDGE FEED PIPE... login required. |
Details... |
1.9km |
14/06/2022 |
N/A |
EXISTING DAINGEAN WASTEWATER TREATMENT PLANT TOWNPARKS , DAINGEAN , CO. OFFALY |
THE UPGRADE OF THE DAINGEAN WASTEWATER TREATMENT PLANT AND WILL GENERALLY CONSIST OF THE FOLLOWING: THE CONSTRUCTION OF A NEW STORM WATER HOLDING TANK COMPLETE WITH INTERNAL CLEANING SYSTEM, INTERNAL STORM RETURN PUMPS, ACCESS STAIRS AND PLATFORM; CONSTRUCTION OF NEW SLUDGE DRYING REED BEDS COMPLETE WITH SLUDGE FEED PIP... login required. |
Details... |
2.5km |
16/05/2022 |
CONDITIONAL |
BALLYMULLEN , DAINGEAN , CO. OFFALY |
THE DEVELOPMENT OF (A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |
1.5km |
22/02/2022 |
CONDITIONAL |
DAINGEAN NATIONAL SCHOOL , CHURCH ROAD DAINGEAN , CO. OFFALY R35 AH95 |
A NEW SINGLE STOREY EXTENSION OF 105.6M2 TO THE FRONT-EAST SIDE OF THE EXISTING SCHOOL, COMPRISING OF A SINGLE MAINSTREAM CLASSROOM, SET ROOM AND ACCESSIBLE TOILET ALONG WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE PROPOSED DEVELOPMENT WILL CONSIST OF WORKS TO A PROTECTED STRUCTURE REF NO. 25-06... login required. |
Details... |
1.5km |
21/01/2022 |
N/A |
DAINGEAN NATIONAL SCHOOL CHURCH ROAD , DAINGEAN , CO. OFFALY |
A NEW SINGLE STOREY EXTENSION OF 105.6M2, TO THE FRONT-EAST SIDE OF THE EXISTING SCHOOL, COMPRISING OF A SINGLE MAINSTREAM CLASSROOM, SET ROOM AND ACCESSIBLE TOILET, ALONG WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS... login required. |
Details... |