2.8km |
15/10/2024 |
N/A |
Killeenmore , Tullamore , Co. Offaly. |
The development will consist of widening existing agricultural entrance to give access to farm.... login required. |
Details... |
2.8km |
30/09/2024 |
N/A |
Killeenmore , Tullamore , Co. Offaly. |
The development will consist of widening existing agricultural entrance to give access to farm.... login required. |
Details... |
1.7km |
03/07/2024 |
CONDITIONAL |
Tullamore Distillery Campus Ballard & Clonminch , Tullamore , Co. Offaly |
the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a
site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance acces... login required. |
Details... |
1.9km |
02/07/2024 |
CONDITIONAL |
Clonminch , Tullamore , Co Offaly |
Retention of dwelling house with revised site layout, house previously granted under 17/258 and EX/22012 incorporating altered position of house on site and permission to complete dwelling house, and all associated site works.... login required. |
Details... |
1.7km |
31/05/2024 |
N/A |
Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly |
the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a
site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance acces... login required. |
Details... |
1.7km |
20/05/2024 |
N/A |
Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly |
the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a
site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance acces... login required. |
Details... |
2.6km |
08/03/2024 |
CONDITIONAL |
Woodlands , Clonagh East , Tullamore Co. Offaly |
an existing domestic storage shed to the rear of the site and all associated site works.... login required. |
Details... |
2.6km |
01/03/2024 |
N/A |
Woodlands , Clonagh East , Tullamore Co. Offaly |
for an existing domestic storage shed to the rear of the site and all associated site works.... login required. |
Details... |
2.2km |
06/12/2023 |
CONDITIONAL |
Killeenmore , Killeigh , Co. Offaly. |
proposed dwelling house, domestic garage, new site entrance, septic tank treatment system, percolation area and all associated site works... login required. |
Details... |
2.2km |
29/11/2023 |
N/A |
Killeenmore , Killeigh , Co. Offaly. |
proposed dwelling house, domestic garage, new site entrance, septic tank treatment system, percolation area and all associated site works.... login required. |
Details... |
3km |
27/07/2023 |
CONDITIONAL |
Ballinvally Killeigh , Tullamore , Co. Offaly |
the construction of a dwelling house, garage, installation of sewerage treatment tank with percolation area and all associated site works... login required. |
Details... |
1.3km |
12/07/2023 |
CONDITIONAL |
Cloncon , Tullamore , Co Offaly |
(1) construction of a new external underground slatted slurry storage tank for livestock use including feed barriers and feeding area to rear of existing farm building, completed with associated siteworks, and (2) Retention ... login required. |
Details... |
1.3km |
05/07/2023 |
N/A |
Cloncon , Tullamore , Co Offaly |
The development consists of (1) Permission to construct a new external underground slatted slurry storage tank for livestock use including feed barriers and feeding area to rear of existing farm building, completed with associated siteworks, ... login required. |
Details... |
0m |
15/06/2023 |
CONDITIONAL |
DERRYBEG , TULLAMORE , CO. OFFALY |
(A) RE-ORIENTATION OF PREVIOUSLY GRANTED PLAYING PITCH, (B) RELOCATION OF PREVIOUSLY GRANTED TEMPORARY DRESSING ROOMS, (C) RELOCATION OF PREVIOUSLY GRANTED CAR PARK AREA, (D) RE-ROUTING OF PREVIOUSLY GRANTED SURROUNDING PEDESTRIAN WALKWAY,... login required. |
Details... |
1.8km |
08/06/2023 |
CONDITIONAL |
CLONMINCH LANE , CLONMINCH , TULLAMORE CO. OFFALY |
ON THE GRANT OF OUTLINE PERMISSION REF. NO. PL2/20/326 FOR THE DEVELOPMENT OF TWO NO. TWO STOREY HOUSES, ALL ANCILLARY SERVICES AND WORKS... login required. |
Details... |
2.5km |
10/05/2023 |
CONDITIONAL |
SAINT O'HARA , TULLAMORE , CO. OFFALY |
THE CONSTRUCTION OF A STOREY & HALF DWELLING HOUSE AND DOMESTIC GARAGE AND THE PROVISION OF A WASTEWATER TREATEMENT SYSTEM AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2km |
10/05/2023 |
CONDITIONAL |
BURNETT'S WOOD KILLEIGH , TULLAMORE , CO OFFALY |
THE CONSTRUCTION OF A DWELLING HOUSE, SEPARATE GARAGE, INSTALLATION OF AN EFFLUENT WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA, AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
180m |
06/09/2022 |
CONDITIONAL |
DERRYBEG , TULLAMORE , CO. OFFALY |
CONSTRUCTION OF A NEW BUNGALOW, DOMESTIC GARAGE, SITE ENTRANCE, INSTALL PROPRIETARY TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.8km |
02/06/2022 |
CONDITIONAL |
ESB TELECOM'S COMPOUND AT ESB'S CLONMINCH 38KV SUBSTATION , CLONMINCH LANE TOWNLAND OF CLONMINCH , TULLAMORE CO. OFFALY |
THE REPLACEMENT OF THE EXISTING 16M HIGH WOOD POLE WITH A PROPOSED 24 METRE HIGH LATTICE TELECOMMUNICATIONS STRUCTURE WITH ANTENNAE, DISHES AND ASSOCIATED EQUIPMENT AND GROUNDWORKS. ACCESS VIA EXISTING SUBSTATION ENTRANCE... login required. |
Details... |