1.9km |
23/10/2024 |
N/A |
Florence , High Street , Tullamore Co. Offaly |
the temporary change of use from a house, which is a protected structure ( Offaly County Council Development Plan 2021-2027 RPS 23-228 / NIAH Ref 14807032) to accommodation of protected ... login required. |
Details... |
1.8km |
11/10/2024 |
N/A |
Saint Mary’s O’Moore Street , Tullamore , Co. Offaly |
a). Construct a new 2 storey extension to the rear of the existing dwelling house; b). renovate the existing dwellinghouse including elevational changes; c). demolish existing rear extension to dwelling house d). construction of a garden shed (e). all associated site works and services.... login required. |
Details... |
1.6km |
09/10/2024 |
N/A |
AVONDHU SPOLLANSTOWN TULLAMORE , CO. OFFALY , R35 CD77 |
THE CONVERSION OF EXISTING HOUSE FROM A SINGLE STOREY TO A TWO-STOREY DWELLING, ALTERATIONS TO EXISTING HOUSE, PROPOSED CONSTRUCTION OF A SINGLE STOREY EXTENSION... login required. |
Details... |
2km |
09/10/2024 |
N/A |
19 High Street , Tullamore , Co. Offaly |
the temporary change of use from a house, which is a protected structure (Offaly County Council Development Plan 2021-2027 RPS 23-226 / NIAH Ref 14807030) to accommodation of protected persons which is ancil... login required. |
Details... |
1.6km |
08/10/2024 |
N/A |
Unit D Tullamore Retail Park , Cloncollog Tullamore , Co. Offaly |
Change of use of existing catalogue retail store to retail warehouse, alterations to internal layout, and forming mezz floor void to front of mezz, closing existing floor voids. Alterations G.F.L. to remove back of house office areas and increase front of house retail area. Inte... login required. |
Details... |
1.4km |
02/10/2024 |
N/A |
NO 55 THE GROVE , HOPHILL TULLAMORE , CO. OFFALY R35 PP70 |
ADDITION AND ALTERATIONS TO EXISTING DWELLING HOUSE AND ALL ANCILLARY SITE WORKS... login required. |
Details... |
2km |
25/09/2024 |
N/A |
19 High Street , Tullamore , Co. Offaly |
to replace 3 pvc windows at basement level on the front facade and the rear staircase window with timber heritage windows and retain the temporary change of use from a house, which is a protected structur... login required. |
Details... |
1.9km |
25/09/2024 |
N/A |
Florence , High Street , Tullamore Co. Offaly |
to replace the pvc windows and door on the front facade with timber heritage windows and retain the temporary change of use from a house, which is a protected structure ( Offaly County... login required. |
Details... |
1.6km |
19/09/2024 |
N/A |
Unit D Tullamore Retail Park , Cloncollog Tullamore , Co. Offaly |
Change of use of existing catalogue retail store to retail warehouse, alterations to internal layout, and forming mezz floor void to front of mezz, closing existing floor voids. Alterations G.F.L. to remove back of house office areas and increase front of house retail area. Inte... login required. |
Details... |
1.3km |
13/09/2024 |
CONDITIONAL |
31 Colliers Brook , Tullamore , Co. Offaly |
construction of an extension to our existing dwelling. It is intended to convert the existing attic space into an extra bedroom The application will also include minor elevational changes and all associated site-works and drainage... login required. |
Details... |
1.6km |
05/09/2024 |
N/A |
Bachelor's Walk , Tullamore , Offaly |
variations carried out to dwelling house from that granted with PL2/19/544 consisting of a) increasing pitch of main roof which includes an infill flat roof, 3 roof lanterns extra attic space and two gable w... login required. |
Details... |
1.4km |
22/08/2024 |
N/A |
Tullamore Rugby Football Club , Spollanstown , Tullamore Co. Offaly |
the extension of the existing boundaries, two new rugby pitches with associated floodlighting, ball stop netting and ancillary works and an illuminated walking track on the perimeter of the proposed development with associated site works... login required. |
Details... |
1.4km |
10/08/2024 |
N/A |
Tullamore Rugby Football Club , Spollanstown , Tullamore Co. Offaly |
the extension of the existing boundaries, two new rugby pitches with associated floodlighting, ball stop netting and ancillary works and an illuminated walking track on the perimeter of the proposed development with associated site works... login required. |
Details... |
1.6km |
06/08/2024 |
CONDITIONAL |
Arbutus Lodge , Spollanstown , Tullamore Co. Offaly |
(a) the demolition of an existing garage/utility to the side and conservatory to the rear of the existing dwelling (b) the renovation of the existing property with amendments to the existing external envelope (c) amendments to the existing roof including fabric upgrade and renewable technologies (d... login required. |
Details... |
650m |
03/07/2024 |
CONDITIONAL |
Tullamore Distillery Campus Ballard & Clonminch , Tullamore , Co. Offaly |
the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a
site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance acces... login required. |
Details... |
1.6km |
22/06/2024 |
CONDITIONAL |
Aisling 5 The Grove Hophill , Tullamore , Co. Offaly |
a two-storey extension to the side of the existing dwelling with side access gate and all associated site works... login required. |
Details... |
1.8km |
04/06/2024 |
CONDITIONAL |
Riverview Business Park , Cloncollog , Tullamore Co Offaly |
alterations to a retail warehouse building (previously approved under planning reference number 18/535), which includes alterations to the site layout including adjustments to the northern boundary with the existing national car testing centre (NCT), alterations to car parking, provision of additional car parking to NCT centre, provision of car charging facilities, reloc... login required. |
Details... |
640m |
31/05/2024 |
N/A |
Tullamore Distillery Campus at Ballard & Clonminch , Tullamore , Co. Offaly |
the construction of a solar PV development with an installed capacity of up to 2.6 MWdc (MEC=0) to provide electrical power to the existing distillery comprising approximately 4,100 no. photovoltaic panels on ground mounted frames within a
site area of 3.90 hectares and associated ancillary development including 1 no. transformer station, 5 no. CCTV security cameras mounted on 8 metre high poles, perimeter security fencing (2.4 metres high), internal access tracks, extension to existing maintenance acces... login required. |
Details... |
1.6km |
29/05/2024 |
CONDITIONAL |
205 Adams Villas , Spollanstown , Tullamore Co. Offaly |
dwelling as built and all associated site works ... login required. |
Details... |