1.9km |
07/11/2024 |
N/A |
Collinstown , Clara , Co Offaly |
Construct two number two bedroom dwellings. The application will also include new connections to existing public services, new entrance and all associated site-works, boundary treatments, and drainage.... login required. |
Details... |
2.4km |
01/11/2024 |
N/A |
Lissanisky , Clara , Co. Offaly |
A NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, DRIVEWAY AND ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.4km |
30/10/2024 |
N/A |
Lissanisky , Clara , Co. Offaly |
A NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, DRIVEWAY AND ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.5km |
18/10/2024 |
N/A |
Lissanisky , Clara , Co. Offaly |
to install a 65 x 35 meter astro turf pitch and 700 meter longwalking track. The application will also include a 2.4 meter high galvanised fence, LED Flood light system to both the walking track and pitch and all associatedsite works and drainage... login required. |
Details... |
2.5km |
05/09/2024 |
N/A |
Lissanisky , Clara , Co. Offaly |
installation of a 65 x 35 meter astro turf pitch and 700 meter long walking track. The application will also include a 2.4 meter high galvanised fence, LED flood light system to both the walking track and pitch and all associated site works and drainage... login required. |
Details... |
1km |
03/09/2024 |
N/A |
Townland of Clara , near Clara , Co. Offaly |
the development and operation of a c. 14MW solar photovoltaic (PV) farm at this 29.75ha site located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly. The application seeks a 10-year permission with an operational lifetime of 35 years. The development will consist of:
• Approximately 38,000 panels on ground mounted metal frames, with a maximum height above ground of 3.17 metres, including string inverters mounted to the rear
of the panels;
• 1 no. 38kV substation including 1 no. MV switch room, IPP control... login required. |
Details... |
1.7km |
15/08/2024 |
CONDITIONAL |
Number 14 Armstrong Grove , Clara , Co Offaly |
an existing garage to existing house. The domestic garage is used as a home gym, toilet, and fuel storage... login required. |
Details... |
1km |
12/08/2024 |
N/A |
Ballyboughlin , Clara , Co. Offaly |
The application seeks a 10-year permission with an
operational lifetime of 35 years. The development will consist of:
• Approximately 38,000 panels on ground mounted metal frames, with a maximum height above ground of 3.17 metres, including string inverters mounted to the rear
of the panels;
• 1 no. 38kV substation including 1 no. MV switch room, IPP control room, 1 no. ESB switch room, and associated electrical infrastructure;
• 3 no. transfo... login required. |
Details... |
1.9km |
10/07/2024 |
N/A |
Collinstown , Clara , Co Offaly |
Construction of two number two bedroom dwellings. The application will also include new connections to existing public services, new entrance and all associated site-works, boundary treatments, and drainage.... login required. |
Details... |
0m |
05/06/2024 |
REFUSED |
Raheen , Clara , Co Offaly |
Construction of a four bedroom dwelling with garage. The application will also include a new domestic entrance and boundary treatments, effluent treatment system, percolation area, associated site-works landscaping and drainage.... login required. |
Details... |
2.5km |
04/06/2024 |
CONDITIONAL |
New Road Erry Armstrong , Clara , Co. Offaly |
the construction of a new dwelling house, new garage, new vehicular entrance, new effluent treatment system and all associated site development works... login required. |
Details... |
940m |
29/05/2024 |
N/A |
Curragh Road , Clara , Co Offaly |
Construction of a three bedroom dwelling with garage. The application will also include a new shared entrance and all associated site-works, boundary treatments, connections to existing services and drainage... login required. |
Details... |
940m |
24/05/2024 |
REFUSED |
Curragh Road , Clara , Co Offaly |
Construct a three bedroom dwelling with garage. The application will also include a new shared entrance and all associated site-works, boundary treatments, connections to existing services and drainage.... login required. |
Details... |
1.1km |
26/04/2024 |
CONDITIONAL |
Church Road , Clara , Co. Offaly |
Reconstruction and extension to house, relocation of vehicular entrance gate and construction of domestic garage and all associated site services and works... login required. |
Details... |
1.6km |
03/04/2024 |
REFUSED |
Clashawaun , Clara , Co. Offaly |
for partial “change of use” from existing Leisure Centre to a Water Bottling Plant. The bottling plant will include the following facilities: Raw Materials Store, Finished Products Store, Packing and Unpacking areas, Clean Room/Bottling Area, Small Laboratory, various Office areas and Welfare Facilities together with all asso... login required. |
Details... |
1.8km |
22/03/2024 |
CONDITIONAL |
Erry (Armstrong) , Clara , Co.Offaly |
for a material change of use, to convert existing dwelling ( granted permission under file number 07/1777 ) into a special needs pre-school , permission is also sought to upgrade existing entrance to public road, to carry out minor site and boundary upgrade works and all associated site works... login required. |
Details... |
1.8km |
21/03/2024 |
N/A |
Erry (Armstrong) , Clara , Co.Offaly |
a material change of use, to convert existing dwelling (granted permission under file number 07/1777) into a special needs pre-school, permission is also sought to upgrade existing entrance to public road, to carry out minor Site and Boundary upgrade works and all associated site works ... login required. |
Details... |
1.7km |
29/02/2024 |
CONDITIONAL |
Aghamore , Clara , Co. Offaly |
the construction of new one-storey extensions to the side/ Southeast and rear/ North of the existing semi-detached bungalow, new garage, new effluent treatment system and all associated site development works.... login required. |
Details... |
1.1km |
29/02/2024 |
CONDITIONAL |
Raheen , Clara , County Offaly |
Construction of a 4 bedroom dwelling which incorporates the reuse of existing structures. The application will also include the retention of 2 number existing garages/stor... login required. |
Details... |