1.2km |
07/11/2024 |
N/A |
Collinstown , Clara , Co Offaly |
Construct two number two bedroom dwellings. The application will also include new connections to existing public services, new entrance and all associated site-works, boundary treatments, and drainage.... login required. |
Details... |
1.4km |
01/11/2024 |
N/A |
Lissanisky , Clara , Co. Offaly |
A NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, DRIVEWAY AND ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.4km |
30/10/2024 |
N/A |
Lissanisky , Clara , Co. Offaly |
A NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, DRIVEWAY AND ENTRANCE AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
1.6km |
18/10/2024 |
N/A |
Lissanisky , Clara , Co. Offaly |
to install a 65 x 35 meter astro turf pitch and 700 meter longwalking track. The application will also include a 2.4 meter high galvanised fence, LED Flood light system to both the walking track and pitch and all associatedsite works and drainage... login required. |
Details... |
2.5km |
13/09/2024 |
N/A |
Ballicknahee , Clara , Co Offaly |
Construction of an extension to the rear of his existing dwelling. the application will also include the renovation of existing derelict dwelling, new biofilter treatment system & Percolation area to replace existing septic tank & Percolation Area and all associated site works and drainage... login required. |
Details... |
1.6km |
05/09/2024 |
N/A |
Lissanisky , Clara , Co. Offaly |
installation of a 65 x 35 meter astro turf pitch and 700 meter long walking track. The application will also include a 2.4 meter high galvanised fence, LED flood light system to both the walking track and pitch and all associated site works and drainage... login required. |
Details... |
1.8km |
03/09/2024 |
N/A |
Townland of Clara , near Clara , Co. Offaly |
the development and operation of a c. 14MW solar photovoltaic (PV) farm at this 29.75ha site located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly. The application seeks a 10-year permission with an operational lifetime of 35 years. The development will consist of:
• Approximately 38,000 panels on ground mounted metal frames, with a maximum height above ground of 3.17 metres, including string inverters mounted to the rear
of the panels;
• 1 no. 38kV substation including 1 no. MV switch room, IPP control... login required. |
Details... |
1.7km |
16/08/2024 |
CONDITIONAL |
New Road , Erry , Clara Co. Offaly |
1) a new vehicular entrance. 2) a new septic tank and percolation area. 3) Planning Permission is sought to amend the site boundaries from those that were previously approved under planning... login required. |
Details... |
1.2km |
15/08/2024 |
CONDITIONAL |
Number 14 Armstrong Grove , Clara , Co Offaly |
an existing garage to existing house. The domestic garage is used as a home gym, toilet, and fuel storage... login required. |
Details... |
1.8km |
12/08/2024 |
N/A |
Ballyboughlin , Clara , Co. Offaly |
The application seeks a 10-year permission with an
operational lifetime of 35 years. The development will consist of:
• Approximately 38,000 panels on ground mounted metal frames, with a maximum height above ground of 3.17 metres, including string inverters mounted to the rear
of the panels;
• 1 no. 38kV substation including 1 no. MV switch room, IPP control room, 1 no. ESB switch room, and associated electrical infrastructure;
• 3 no. transfo... login required. |
Details... |
2.9km |
09/08/2024 |
CONDITIONAL |
Ballicknahee , Clara , Offaly |
2 no. existing domestic storage sheds to the rear of the property together with all associated site development works... login required. |
Details... |
1.7km |
02/08/2024 |
N/A |
New Road , Erry , Clara Co. Offaly |
a new Vehicular Entrance, Wastewater Treatment System and Percolation area together with all associated site development works. Planning permission is also sought to vary conditions No’s. 1, 4, 10, 11 &13 of Planning Reference PL2/13/76... login required. |
Details... |
1.2km |
10/07/2024 |
N/A |
Collinstown , Clara , Co Offaly |
Construction of two number two bedroom dwellings. The application will also include new connections to existing public services, new entrance and all associated site-works, boundary treatments, and drainage.... login required. |
Details... |
1.1km |
05/06/2024 |
REFUSED |
Raheen , Clara , Co Offaly |
Construction of a four bedroom dwelling with garage. The application will also include a new domestic entrance and boundary treatments, effluent treatment system, percolation area, associated site-works landscaping and drainage.... login required. |
Details... |
2.1km |
04/06/2024 |
CONDITIONAL |
New Road Erry Armstrong , Clara , Co. Offaly |
the construction of a new dwelling house, new garage, new vehicular entrance, new effluent treatment system and all associated site development works... login required. |
Details... |
1.1km |
01/06/2024 |
N/A |
Raheen , Clara , Co Offaly |
Construct a four bedroom dwelling with garage. The application will also include a new domestic entrance and boundary treatments, effluent treatment system, percolation area, associated site-works landscaping and drainage.... login required. |
Details... |
510m |
29/05/2024 |
N/A |
Curragh Road , Clara , Co Offaly |
Construction of a three bedroom dwelling with garage. The application will also include a new shared entrance and all associated site-works, boundary treatments, connections to existing services and drainage... login required. |
Details... |
500m |
24/05/2024 |
REFUSED |
Curragh Road , Clara , Co Offaly |
Construct a three bedroom dwelling with garage. The application will also include a new shared entrance and all associated site-works, boundary treatments, connections to existing services and drainage.... login required. |
Details... |
970m |
22/04/2024 |
CONDITIONAL |
Kilbeggan Road , Clara , Co. Offaly |
a 10 year permission for the refurbishment of the existing St. Brigid’s Convent building, demolition of existing ball wall and rear extensions, the construction of a 2-storey extension to the rear of the existing building on a phased basis providing, dressing rooms and associated facilities, toilets, storage, plant room, gym, and the erection of a spectator stand, ball wall and all-weather training area.
The development will also inco... login required. |
Details... |