930m |
30/04/2024 |
N/A |
Doorosheath , Fivealley , Birr Co. Offaly |
A new office and secure store room and all associated site works.... login required. |
Details... |
970m |
24/04/2023 |
CONDITIONAL |
DOOROSHEATH , FIVEALLEY BIRR , CO. OFFALY R42 DR79 |
A NEW SLATTED LIVESTOCK SHED INCLUDING EFFLUENT TANKS AND CATTLE BEDDING SHED AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.9km |
15/03/2023 |
CONDITIONAL |
BALLYNAGUILSHA , BIRR , CO. OFFALY |
AN EXTENSION AND ALTERATIONS TO AN EXISTING DWELLING HOUSE, NEW TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS. PERMISSION IS ALSO BEING SOUGHT FOR THE DEMOLITION OF AN EXISTING SHED... login required. |
Details... |
2.9km |
29/08/2022 |
CONDITIONAL |
GALROS WEST FIVEALLEY , BIRR , CO. OFFALY |
(I) THE EXISTING 80 METRE METEOROLOGICAL MAST, WHICH WAS ERECTED AS EXEMPTED DEVELOPMENT IN ACCORDANCE WITH CLASS 20A, SCHEDULE 2, OF THE PLANNING AND DEVELOPMENT REGULATIONS 2001 (AS AMENDED), AND ALL ANCILLARY INFRASTRUCTURE AND ASSOCIATED SITE DEVELOPMENT AND REINSTATEMENT WORKS; A... login required. |
Details... |
2.9km |
10/08/2022 |
N/A |
GALROS WEST , COUNTY OFFALY |
(I) THE CONTINUED OPERATION OF THE EXISTING 80 METRE METEOROLOGICAL MAST, WHICH WAS ERECTED AS EXEMPTED DEVELOPMENT IN ACCORDANCE WITH CLASS 20A, SCHEDULE 2, OF THE PLANNING AND DEVELOPMENT REGULATIONS 2001 (AS AMENDED), AND ALL ANCILLARY INFRASTRUCTURE AND ASSOCIATED SITE DEVELOPMENT AND REI... login required. |
Details... |
2.4km |
01/07/2022 |
N/A |
CLONBEALE BEG GLEBE RATHURE NORTH (PARCEL 1) AND , PARKMORE (PARCEL 2) , CO. OFFALY |
A 10 YEAR PERMISSION. THE DEVELOPMENT WILL CONSIST OF SOLAR PV DEVELOPMENT ON TWO SEPARATE AND DETACHED PARCELS OF LAND, PARCEL 1 IS LOCATED IN THE TOWNLAND OF CLONBEALE BEG GLEBE, RATHURE NORTH, WHILE PARCEL 2 IS LOCATED IN THE TOWNLAND OF PARKMORE. BOTH SEPARATE PARCELS WILL BE CONNECTED TO AN EXISTING PERMITTED SOLAR DEVELOPMENT UNDER PLANNING APPLICATION REF: PR20/476 BY UNDERGROUND CABLES (WILL BE SUBJECT TO A SEPARATE STRATEGIC INFRASTRUCTURE DEVELOPMENT CONSENT APPLICATION). EACH DETACHED PARCEL CONTAINING PV PANELS WILL BE LAID OUT IN ARRAYS OVER A TOTAL ... login required. |
Details... |
1.8km |
20/10/2021 |
CONDITIONAL |
EGLISH FIVEALLEY , BIRR , CO. OFFALY |
CONSTRUCTION OF A NEW SINGLE STOREY DWELLING, NEW VEHICULAR ENTRANCE, DRIVEWAY, WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAYS, AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |
2.2km |
23/04/2021 |
CONDITIONAL |
BALLYKEALY , FIVEALLEY BIRR , CO. OFFALY |
NEW DWELLING HOUSE, HOME OFFICE, SHED, ACCESS ROAD, WASTEWATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKS AND SERVICES... login required. |
Details... |
2.2km |
24/03/2021 |
N/A |
BALLYKEALY , FIVEALLEY BIRR , CO. OFFALY |
NEW DWELLING HOUSE, ACCESS ROAD, WASTEWATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKS AND SERVICES... login required. |
Details... |
910m |
16/02/2021 |
CONDITIONAL |
COOLOGE FIVEALLEY , BIRR , CO. OFFALY |
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, INSTALLATION OF SEPTIC TANK WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS... login required. |
Details... |